| 123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990919293949596979899100101102103104105106107108109110111112113114115116117118119120121122123124125126127128129130131132133134135136137138139140141142143144145146147148149150151152153154155156157158159160161162163164165166167168169170171172173174175176177178179180181182183184185186187188189190191192193194195196197198199200201202203204205206207208209210211212213214215216217218219220221222223224225226227228229230231232233234235236237238239240241242243244245246247248249250251252253254255256257258259260261262263264265266267268269270271272273274275276277278279280281282283284285286287288289290291292293294295296297298299300301302303304305306307308309310311312313314315316317318319320321322323324325326327328329330331332333334335336337338339340341342343344345346347348349350351352353354355356357358359360361362363364365366367368369370371372373374375376377378379380381382383384385386387388389390391392393394395396397398399400401402403404405406407408409410411412413414415416417418419420421422423424425426427428429430431432433434435436437438439440441442443444445446447448449450451452453454455456457458459460461462463464465466467468469470471472473474475476477478479480481482483484485486487488489490491492493494495496497498499500501502503504505506507508509510511512513514515516517518519520521522523524525526527528529530531532533534535536537538539540541542543544545546547548549550551552553554555556557558559560561562563564565566567568569570571572573574575576577578579580581582583584585586587588589590591592593594595596597598599600601602603604605606607608609610611612613614615616617618619620621622623624625626627628629630631632633634635636637638639640641642643644645646647648649650651652653654655656657658659660661662663664665666667668669670671672673674675676677678679680681682683684685686687688689690691692693694695696697698699700701702703704705706707708709710711712713714715716717718719720721722723724725726727728729730731732733734735736737738739740741742743744745746747748749750751752753754755756757758759760761762763764765766767768769770771772773774775776777778779780781782783784785786787788789790791792793794795796797798799800801802803804805806807808809810811812813814815816817818819820821822823824825826827828829830831832833834835836837838839840841842843844845846847848849850851852853854855856857858859860861862863864 |
- ,Unnamed: 0,id,DEBH,GCLMC,GCLGG,GCLRGR,GCLCLF,GCLJXF,GCLRGF,GCLGLF,GLFFL,GCLLR,LRFL,PBSL,GCLJJ,GCLSJDJ,PBBH,GCPBHJ,DW,PBDJ,PBBHM,GCLCLF1,THMC,YSDELBH,THSL,GLDE,BZBH,rglxh,zhxs,zmsm,is_lock,dejb,sptfl,work,zhiyin,qfbz,ischaogao,zmlx,BH1,BH2,mcxz,DeId,parent
- 0,0,1,1-1,电线管拆除 公称直径(mm) 20,,0,0.0,0.0,129.8,55.81,43.0,18.17,14.0,0.0,129.8,203.78,,0.0,100m,0.0,,0.0,,201010101,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,1,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 1、电线管拆除
- 1,1,2,1-2,电线管拆除 公称直径(mm) 32,,0,0.0,0.0,196.24,84.38,43.0,27.47,14.0,0.0,196.24,308.09,,0.0,100m,0.0,,0.0,,201010101,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,2,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 1、电线管拆除
- 2,2,3,1-3,电线管拆除 公称直径(mm) 50,,0,0.0,0.0,228.36,98.19,43.0,31.97,14.0,0.0,228.36,358.52,,0.0,100m,0.0,,0.0,,201010101,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,3,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 1、电线管拆除
- 3,3,4,1-4,钢索配电线管拆除 公称直径(mm) 20,,0,0.0,0.0,201.52,86.65,43.0,28.21,14.0,0.0,201.52,316.38,,0.0,100m,0.0,,0.0,,201010102,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,4,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 2、钢索配电线管拆除
- 4,4,5,1-5,钢索配电线管拆除 公称直径(mm) 32,,0,0.0,0.0,229.68,98.76,43.0,32.16,14.0,0.0,229.68,360.6,,0.0,100m,0.0,,0.0,,201010102,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,5,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 2、钢索配电线管拆除
- 5,5,6,1-6,钢管拆除 公称直径(mm) 20,,0,0.0,0.0,158.4,68.11,43.0,22.18,14.0,0.0,158.4,248.69,,0.0,100m,0.0,,0.0,,201010103,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,6,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 3、钢管拆除
- 6,6,7,1-7,钢管拆除 公称直径(mm) 32,,0,0.0,0.0,204.6,87.98,43.0,28.64,14.0,0.0,204.6,321.22,,0.0,100m,0.0,,0.0,,201010103,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,7,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 3、钢管拆除
- 7,7,8,1-8,钢管拆除 公称直径(mm) 50,,0,0.0,0.0,332.64,143.04,43.0,46.57,14.0,0.0,332.64,522.25,,0.0,100m,0.0,,0.0,,201010103,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,8,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 3、钢管拆除
- 8,8,9,1-9,钢管拆除 公称直径(mm) 70,,0,0.0,0.0,423.72,182.2,43.0,59.32,14.0,0.0,423.72,665.24,,0.0,100m,0.0,,0.0,,201010103,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,9,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 3、钢管拆除
- 9,9,10,1-10,钢管拆除 公称直径(mm) 100,,0,0.0,0.0,537.68,231.2,43.0,75.28,14.0,0.0,537.68,844.16,,0.0,100m,0.0,,0.0,,201010103,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,10,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 3、钢管拆除
- 10,10,11,1-11,钢索配钢管拆除 公称直径(mm) 20,,0,0.0,0.0,200.2,86.09,43.0,28.03,14.0,0.0,200.2,314.32,,0.0,100m,0.0,,0.0,,201010104,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,11,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 4、钢索配钢管拆除
- 11,11,12,1-12,钢索配钢管拆除 公称直径(mm) 32,,0,0.0,0.0,258.28,111.06,43.0,36.16,14.0,0.0,258.28,405.5,,0.0,100m,0.0,,0.0,,201010104,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,12,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 4、钢索配钢管拆除
- 12,12,13,1-13,塑料管拆除 公称直径(mm) 20,,0,0.0,0.0,125.84,54.11,43.0,17.62,14.0,0.0,125.84,197.57,,0.0,100m,0.0,,0.0,,201010105,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,13,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 5、塑料管拆除
- 13,13,14,1-14,塑料管拆除 公称直径(mm) 32,,0,0.0,0.0,168.52,72.46,43.0,23.59,14.0,0.0,168.52,264.57,,0.0,100m,0.0,,0.0,,201010105,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,14,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 5、塑料管拆除
- 14,14,15,1-15,塑料管拆除 公称直径(mm) 50,,0,0.0,0.0,209.88,90.25,43.0,29.38,14.0,0.0,209.88,329.51,,0.0,100m,0.0,,0.0,,201010105,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,15,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 5、塑料管拆除
- 15,15,16,1-16,塑料管拆除 公称直径(mm) 70,,0,0.0,0.0,234.08,100.65,43.0,32.77,14.0,0.0,234.08,367.5,,0.0,100m,0.0,,0.0,,201010105,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,16,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 5、塑料管拆除
- 16,16,17,1-17,塑料管拆除 公称直径(mm) 100,,0,0.0,0.0,300.08,129.03,43.0,42.01,14.0,0.0,300.08,471.12,,0.0,100m,0.0,,0.0,,201010105,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,17,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 5、塑料管拆除
- 17,17,18,1-18,钢索配塑料管拆除 公称直径(mm) 20,,0,0.0,0.0,124.08,53.35,43.0,17.37,14.0,0.0,124.08,194.8,,0.0,100m,0.0,,0.0,,201010106,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,18,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 6、钢索配塑料管拆除
- 18,18,19,1-19,钢索配塑料管拆除 公称直径(mm) 32,,0,0.0,0.0,141.24,60.73,43.0,19.77,14.0,0.0,141.24,221.74,,0.0,100m,0.0,,0.0,,201010106,,,,,100,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,19,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 6、钢索配塑料管拆除
- 19,19,20,1-20,金属软管拆除 公称直径(mm) 20,,0,0.0,0.0,44.0,18.92,43.0,6.16,14.0,0.0,44.0,69.08,,0.0,10m,0.0,,0.0,,201010107,,,,,10,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,20,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 7、金属软管拆除
- 20,20,21,1-21,金属软管拆除 公称直径(mm) 32,,0,0.0,0.0,48.4,20.81,43.0,6.78,14.0,0.0,48.4,75.99,,0.0,10m,0.0,,0.0,,201010107,,,,,10,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,21,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 7、金属软管拆除
- 21,21,22,1-22,金属软管拆除 公称直径(mm) 50,,0,0.0,0.0,66.0,28.38,43.0,9.24,14.0,0.0,66.0,103.62,,0.0,10m,0.0,,0.0,,201010107,,,,,10,,0.0,,,管卡子、管子、接地及支持物等拆除。,,1.0,0,0.0,,,,22,第一章 电气设备工程 第一节 拆除工程 一、各种配管拆除 7、金属软管拆除
- 22,22,23,1-23,夹板配线拆除 导线截面(mm2) 2.5以内,,0,0.0,0.0,21.12,9.08,43.0,2.96,14.0,0.0,21.12,33.16,,0.0,100m,0.0,,0.0,,201010201,,,,,100,,0.0,,,瓷夹板、塑料夹板、瓷管及配线等拆除。,,1.0,0,0.0,,,,23,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 1、夹板配线拆除
- 23,23,24,1-24,夹板配线拆除 导线截面(mm2) 6以内,,0,0.0,0.0,26.4,11.35,43.0,3.7,14.0,0.0,26.4,41.45,,0.0,100m,0.0,,0.0,,201010201,,,,,100,,0.0,,,瓷夹板、塑料夹板、瓷管及配线等拆除。,,1.0,0,0.0,,,,24,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 1、夹板配线拆除
- 24,24,25,1-25,夹板配线拆除 导线截面(mm2) 10以内,,0,0.0,0.0,31.68,13.62,43.0,4.44,14.0,0.0,31.68,49.74,,0.0,100m,0.0,,0.0,,201010201,,,,,100,,0.0,,,瓷夹板、塑料夹板、瓷管及配线等拆除。,,1.0,0,0.0,,,,25,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 1、夹板配线拆除
- 25,25,26,1-26,鼓形绝缘子配线拆除 导线截面(mm2) 2.5以内,,0,0.0,0.0,21.12,9.08,43.0,2.96,14.0,0.0,21.12,33.16,,0.0,100m,0.0,,0.0,,201010202,,,,,100,,0.0,,,瓷夹板、塑料夹板、瓷管及配线等拆除。,,1.0,0,0.0,,,,26,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 2、鼓形绝缘子配线拆除
- 26,26,27,1-27,鼓形绝缘子配线拆除 导线截面(mm2) 6以内,,0,0.0,0.0,26.4,11.35,43.0,3.7,14.0,0.0,26.4,41.45,,0.0,100m,0.0,,0.0,,201010202,,,,,100,,0.0,,,瓷夹板、塑料夹板、瓷管及配线等拆除。,,1.0,0,0.0,,,,27,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 2、鼓形绝缘子配线拆除
- 27,27,28,1-28,鼓形绝缘子配线拆除 导线截面(mm2) 10以内,,0,0.0,0.0,31.68,13.62,43.0,4.44,14.0,0.0,31.68,49.74,,0.0,100m,0.0,,0.0,,201010202,,,,,100,,0.0,,,瓷夹板、塑料夹板、瓷管及配线等拆除。,,1.0,0,0.0,,,,28,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 2、鼓形绝缘子配线拆除
- 28,28,29,1-29,针式绝缘子配线拆除 导线截面(mm2) 2.5以内,,0,0.0,0.0,26.4,11.35,43.0,3.7,14.0,0.0,26.4,41.45,,0.0,100m,0.0,,0.0,,201010203,,,,,100,,0.0,,,针式绝缘子、过墙管、瓷管及配线拆除。,,1.0,0,0.0,,,,29,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 3、针式绝缘子配线拆除
- 29,29,30,1-30,针式绝缘子配线拆除 导线截面(mm2) 6以内,,0,0.0,0.0,29.04,12.49,43.0,4.07,14.0,0.0,29.04,45.6,,0.0,100m,0.0,,0.0,,201010203,,,,,100,,0.0,,,针式绝缘子、过墙管、瓷管及配线拆除。,,1.0,0,0.0,,,,30,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 3、针式绝缘子配线拆除
- 30,30,31,1-31,针式绝缘子配线拆除 导线截面(mm2) 16以内,,0,0.0,0.0,31.68,13.62,43.0,4.44,14.0,0.0,31.68,49.74,,0.0,100m,0.0,,0.0,,201010203,,,,,100,,0.0,,,针式绝缘子、过墙管、瓷管及配线拆除。,,1.0,0,0.0,,,,31,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 3、针式绝缘子配线拆除
- 31,31,32,1-32,针式绝缘子配线拆除 导线截面(mm2) 35以内,,0,0.0,0.0,38.28,16.46,43.0,5.36,14.0,0.0,38.28,60.1,,0.0,100m,0.0,,0.0,,201010203,,,,,100,,0.0,,,针式绝缘子、过墙管、瓷管及配线拆除。,,1.0,0,0.0,,,,32,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 3、针式绝缘子配线拆除
- 32,32,33,1-33,针式绝缘子配线拆除 导线截面(mm2) 70以内,,0,0.0,0.0,45.76,19.68,43.0,6.41,14.0,0.0,45.76,71.85,,0.0,100m,0.0,,0.0,,201010203,,,,,100,,0.0,,,针式绝缘子、过墙管、瓷管及配线拆除。,,1.0,0,0.0,,,,33,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 3、针式绝缘子配线拆除
- 33,33,34,1-34,针式绝缘子配线拆除 导线截面(mm2) 120以内,,0,0.0,0.0,54.56,23.46,43.0,7.64,14.0,0.0,54.56,85.66,,0.0,100m,0.0,,0.0,,201010203,,,,,100,,0.0,,,针式绝缘子、过墙管、瓷管及配线拆除。,,1.0,0,0.0,,,,34,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 3、针式绝缘子配线拆除
- 34,34,35,1-35,针式绝缘子配线拆除 导线截面(mm2) 185以内,,0,0.0,0.0,65.56,28.19,43.0,9.18,14.0,0.0,65.56,102.93,,0.0,100m,0.0,,0.0,,201010203,,,,,100,,0.0,,,针式绝缘子、过墙管、瓷管及配线拆除。,,1.0,0,0.0,,,,35,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 3、针式绝缘子配线拆除
- 35,35,36,1-36,针式绝缘子配线拆除 导线截面(mm2) 240以内,,0,0.0,0.0,78.76,33.87,43.0,11.03,14.0,0.0,78.76,123.66,,0.0,100m,0.0,,0.0,,201010203,,,,,100,,0.0,,,针式绝缘子、过墙管、瓷管及配线拆除。,,1.0,0,0.0,,,,36,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 3、针式绝缘子配线拆除
- 36,36,37,1-37,塑料护套线拆除 二芯 导线截面(mm2) 2.5以内,,0,0.0,0.0,34.32,14.76,43.0,4.8,14.0,0.0,34.32,53.88,,0.0,100m,0.0,,0.0,,201010204,,,,,100,,0.0,,,配线及接线盒等拆除、整理、圈好、归堆、退库。,,1.0,0,0.0,,,,37,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 4、塑料护套线拆除
- 37,37,38,1-38,塑料护套线拆除 二芯 导线截面(mm2) 6以内,,0,0.0,0.0,41.36,17.78,43.0,5.79,14.0,0.0,41.36,64.93,,0.0,100m,0.0,,0.0,,201010204,,,,,100,,0.0,,,配线及接线盒等拆除、整理、圈好、归堆、退库。,,1.0,0,0.0,,,,38,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 4、塑料护套线拆除
- 38,38,39,1-39,塑料护套线拆除 三芯 导线截面(mm2) 2.5以内,,0,0.0,0.0,45.76,19.68,43.0,6.41,14.0,0.0,45.76,71.85,,0.0,100m,0.0,,0.0,,201010204,,,,,100,,0.0,,,配线及接线盒等拆除、整理、圈好、归堆、退库。,,1.0,0,0.0,,,,39,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 4、塑料护套线拆除
- 39,39,40,1-40,塑料护套线拆除 三芯 导线截面(mm2) 6以内,,0,0.0,0.0,54.56,23.46,43.0,7.64,14.0,0.0,54.56,85.66,,0.0,100m,0.0,,0.0,,201010204,,,,,100,,0.0,,,配线及接线盒等拆除、整理、圈好、归堆、退库。,,1.0,0,0.0,,,,40,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 4、塑料护套线拆除
- 40,40,41,1-41,木槽板及塑料槽板配线拆除 二线 导线截面(mm2) 6以内,,0,0.0,0.0,118.8,51.08,43.0,16.63,14.0,0.0,118.8,186.51,,0.0,100m,0.0,,0.0,,201010205,,,,,100,,0.0,,,木槽板、塑料槽板、配线等拆除。,,1.0,0,0.0,,,,41,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 5、木槽板及塑料槽板配线拆除
- 41,41,42,1-42,木槽板及塑料槽板配线拆除 二线 导线截面(mm2) 16以内,,0,0.0,0.0,154.88,66.6,43.0,21.68,14.0,0.0,154.88,243.16,,0.0,100m,0.0,,0.0,,201010205,,,,,100,,0.0,,,木槽板、塑料槽板、配线等拆除。,,1.0,0,0.0,,,,42,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 5、木槽板及塑料槽板配线拆除
- 42,42,43,1-43,木槽板及塑料槽板配线拆除 三线 导线截面(mm2) 6以内,,0,0.0,0.0,162.8,70.0,43.0,22.79,14.0,0.0,162.8,255.59,,0.0,100m,0.0,,0.0,,201010205,,,,,100,,0.0,,,木槽板、塑料槽板、配线等拆除。,,1.0,0,0.0,,,,43,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 5、木槽板及塑料槽板配线拆除
- 43,43,44,1-44,木槽板及塑料槽板配线拆除 三线 导线截面(mm2) 16以内,,0,0.0,0.0,195.36,84.0,43.0,27.35,14.0,0.0,195.36,306.71,,0.0,100m,0.0,,0.0,,201010205,,,,,100,,0.0,,,木槽板、塑料槽板、配线等拆除。,,1.0,0,0.0,,,,44,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 5、木槽板及塑料槽板配线拆除
- 44,44,45,1-45,管内配线拆除 导线截面(mm2) 4以内,,0,0.0,0.0,13.2,5.68,43.0,1.85,14.0,0.0,13.2,20.73,,0.0,100m,0.0,,0.0,,201010206,,,,,100,,0.0,,,拆除、整理、圈好、归堆、退库。,,1.0,0,0.0,,,,45,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 6、管内配线拆除
- 45,45,46,1-46,管内配线拆除 导线截面(mm2) 10以内,,0,0.0,0.0,20.68,8.89,43.0,2.9,14.0,0.0,20.68,32.47,,0.0,100m,0.0,,0.0,,201010206,,,,,100,,0.0,,,拆除、整理、圈好、归堆、退库。,,1.0,0,0.0,,,,46,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 6、管内配线拆除
- 46,46,47,1-47,管内配线拆除 导线截面(mm2) 50以内,,0,0.0,0.0,32.56,14.0,43.0,4.56,14.0,0.0,32.56,51.12,,0.0,100m,0.0,,0.0,,201010206,,,,,100,,0.0,,,拆除、整理、圈好、归堆、退库。,,1.0,0,0.0,,,,47,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 6、管内配线拆除
- 47,47,48,1-48,管内配线拆除 导线截面(mm2) 95以内,,0,0.0,0.0,50.16,21.57,43.0,7.02,14.0,0.0,50.16,78.75,,0.0,100m,0.0,,0.0,,201010206,,,,,100,,0.0,,,拆除、整理、圈好、归堆、退库。,,1.0,0,0.0,,,,48,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 6、管内配线拆除
- 48,48,49,1-49,管内配线拆除 导线截面(mm2) 150以内,,0,0.0,0.0,78.32,33.68,43.0,10.96,14.0,0.0,78.32,122.96,,0.0,100m,0.0,,0.0,,201010206,,,,,100,,0.0,,,拆除、整理、圈好、归堆、退库。,,1.0,0,0.0,,,,49,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 6、管内配线拆除
- 49,49,50,1-50,管内配线拆除 导线截面(mm2) 240以内,,0,0.0,0.0,122.32,52.6,43.0,17.12,14.0,0.0,122.32,192.04,,0.0,100m,0.0,,0.0,,201010206,,,,,100,,0.0,,,拆除、整理、圈好、归堆、退库。,,1.0,0,0.0,,,,50,第一章 电气设备工程 第一节 拆除工程 二、各种配线拆除 6、管内配线拆除
- 50,50,51,1-51,配电箱半周长(m) 0.5以内,,0,0.0,0.0,14.08,6.05,43.0,1.97,14.0,0.0,14.08,22.1,,0.0,台,0.0,,0.0,,201010300,,,,,1,,0.0,,,配电箱、盘、板本体拆除、接地及支架等拆除。,,1.0,0,0.0,,,,51,第一章 电气设备工程 第一节 拆除工程 三、明暗配电箱、盘、板拆除
- 51,51,52,1-52,配电箱半周长(m) 1.0以内,,0,0.0,0.0,15.4,6.62,43.0,2.16,14.0,0.0,15.4,24.18,,0.0,台,0.0,,0.0,,201010300,,,,,1,,0.0,,,配电箱、盘、板本体拆除、接地及支架等拆除。,,1.0,0,0.0,,,,52,第一章 电气设备工程 第一节 拆除工程 三、明暗配电箱、盘、板拆除
- 52,52,53,1-53,配电箱半周长(m) 1.5以内,,0,0.0,0.0,16.72,7.19,43.0,2.34,14.0,0.0,16.72,26.25,,0.0,台,0.0,,0.0,,201010300,,,,,1,,0.0,,,配电箱、盘、板本体拆除、接地及支架等拆除。,,1.0,0,0.0,,,,53,第一章 电气设备工程 第一节 拆除工程 三、明暗配电箱、盘、板拆除
- 53,53,54,1-54,配电箱半周长(m) 2.5以内,,0,0.0,0.0,22.0,9.46,43.0,3.08,14.0,0.0,22.0,34.54,,0.0,台,0.0,,0.0,,201010300,,,,,1,,0.0,,,配电箱、盘、板本体拆除、接地及支架等拆除。,,1.0,0,0.0,,,,54,第一章 电气设备工程 第一节 拆除工程 三、明暗配电箱、盘、板拆除
- 54,54,55,1-55,临时表箱,,0,0.0,0.0,8.8,3.78,43.0,1.23,14.0,0.0,8.8,13.81,,0.0,只,0.0,,0.0,,201010300,,,,,1,,0.0,,,拆除、整理、归堆、退库。,,1.0,0,0.0,,,,55,第一章 电气设备工程 第一节 拆除工程 三、明暗配电箱、盘、板拆除
- 55,55,56,1-56,表板,,0,0.0,0.0,6.6,2.84,43.0,0.92,14.0,0.0,6.6,10.36,,0.0,块,0.0,,0.0,,201010300,,,,,1,,0.0,,,拆除、整理、归堆、退库。,,1.0,0,0.0,,,,56,第一章 电气设备工程 第一节 拆除工程 三、明暗配电箱、盘、板拆除
- 56,56,57,1-57,配电板,,0,0.0,0.0,4.4,1.89,43.0,0.62,14.0,0.0,4.4,6.91,,0.0,块,0.0,,0.0,,201010300,,,,,1,,0.0,,,拆除、整理、归堆、退库。,,1.0,0,0.0,,,,57,第一章 电气设备工程 第一节 拆除工程 三、明暗配电箱、盘、板拆除
- 57,57,58,1-58,接线盒(开关盒),,0,0.0,0.0,2.2,0.95,43.0,0.31,14.0,0.0,2.2,3.46,,0.0,只,0.0,,0.0,,201010300,,,,,1,,0.0,,,拆除、整理、归堆、退库。,,1.0,0,0.0,,,,58,第一章 电气设备工程 第一节 拆除工程 三、明暗配电箱、盘、板拆除
- 58,58,59,1-59,高压柜,,0,0.0,0.0,20.24,8.7,43.0,2.83,14.0,0.0,20.24,31.77,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,59,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 59,59,60,1-60,低压柜,,0,0.0,0.0,15.84,6.81,43.0,2.22,14.0,0.0,15.84,24.87,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,60,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 60,60,61,1-61,控制柜,,0,0.0,0.0,14.52,6.24,43.0,2.03,14.0,0.0,14.52,22.79,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,61,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 61,61,62,1-62,控制台、立式盘,,0,0.0,0.0,2.64,1.14,43.0,0.37,14.0,0.0,2.64,4.15,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,62,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 62,62,63,1-63,组合控制开关,,0,0.0,0.0,2.64,1.14,43.0,0.37,14.0,0.0,2.64,4.15,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,63,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 63,63,64,1-64,变压器(kVA) 250以内,,0,0.0,39.6,182.6,78.52,43.0,25.56,14.0,0.0,222.2,326.28,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,64,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 64,64,65,1-65,变压器(kVA) 500以内,,0,0.0,48.09,234.52,100.84,43.0,32.83,14.0,0.0,282.61,416.28,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,65,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 65,65,66,1-66,变压器(kVA) 1000以内,,0,0.0,172.22,401.28,172.55,43.0,56.18,14.0,0.0,573.5,802.23,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,66,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 66,66,67,1-67,启动按钮,,0,0.0,0.0,2.2,0.95,43.0,0.31,14.0,0.0,2.2,3.46,,0.0,个,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,67,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 67,67,68,1-68,跌落保险,,0,0.0,0.0,23.76,10.22,43.0,3.33,14.0,0.0,23.76,37.31,,0.0,组,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,68,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 68,68,69,1-69,刀型开关(A) 200以内,,0,0.0,0.0,9.24,3.97,43.0,1.29,14.0,0.0,9.24,14.5,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,69,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 69,69,70,1-70,刀型开关(A) 600以内,,0,0.0,0.0,10.12,4.35,43.0,1.42,14.0,0.0,10.12,15.89,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,70,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 70,70,71,1-71,隔离开关(A) 2000以内,,0,0.0,0.0,26.4,11.35,43.0,3.7,14.0,0.0,26.4,41.45,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,71,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 71,71,72,1-72,负荷开关,,0,0.0,0.0,22.88,9.84,43.0,3.2,14.0,0.0,22.88,35.92,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,72,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 72,72,73,1-73,操作机构,,0,0.0,0.0,29.04,12.49,43.0,4.07,14.0,0.0,29.04,45.6,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,73,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 73,73,74,1-74,互感器,,0,0.0,0.0,15.84,6.81,43.0,2.22,14.0,0.0,15.84,24.87,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,74,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 74,74,75,1-75,避雷器,,0,0.0,0.0,15.84,6.81,43.0,2.22,14.0,0.0,15.84,24.87,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,75,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 75,75,76,1-76,减压启动器,,0,0.0,0.0,18.48,7.95,43.0,2.59,14.0,0.0,18.48,29.02,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,76,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 76,76,77,1-77,交流接触器,,0,0.0,0.0,12.76,5.49,43.0,1.79,14.0,0.0,12.76,20.04,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,77,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 77,77,78,1-78,磁力启动器,,0,0.0,0.0,14.52,6.24,43.0,2.03,14.0,0.0,14.52,22.79,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,78,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 78,78,79,1-79,断路器(A) 60以内,,0,0.0,0.0,2.64,1.14,43.0,0.37,14.0,0.0,2.64,4.15,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,79,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 79,79,80,1-80,断路器(A) 200以内,,0,0.0,0.0,5.28,2.27,43.0,0.74,14.0,0.0,5.28,8.29,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,80,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 80,80,81,1-81,断路器(A) 600以内,,0,0.0,0.0,7.48,3.22,43.0,1.05,14.0,0.0,7.48,11.75,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,81,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 81,81,82,1-82,补偿器(kw) 20以内,,0,0.0,0.0,11.0,4.73,43.0,1.54,14.0,0.0,11.0,17.27,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,82,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 82,82,83,1-83,补偿器(kw) 30以内,,0,0.0,0.0,11.7,5.03,43.0,1.64,14.0,0.0,11.7,18.37,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,83,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 83,83,84,1-84,补偿器(kw) 50以内,,0,0.0,0.0,15.4,6.62,43.0,2.16,14.0,0.0,15.4,24.18,,0.0,台,0.0,,0.0,,201010400,,,,,1,,0.0,,,本体、固定体、柜上母线、一次电源接头摘除及接地母线、控制小线等拆除。,,1.0,0,0.0,,,,84,第一章 电气设备工程 第一节 拆除工程 四、高、低压开关柜及控制闸器具拆除
- 84,84,85,1-85,盘上开关,,0,0.0,0.0,1.76,0.76,43.0,0.25,14.0,0.0,1.76,2.77,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,85,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 85,85,86,1-86,指示灯,,0,0.0,0.0,2.2,0.95,43.0,0.31,14.0,0.0,2.2,3.46,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,86,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 86,86,87,1-87,吊牌,,0,0.0,0.0,5.72,2.46,43.0,0.8,14.0,0.0,5.72,8.98,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,87,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 87,87,88,1-88,电铃,,0,0.0,0.0,2.64,1.14,43.0,0.37,14.0,0.0,2.64,4.15,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,88,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 88,88,89,1-89,端子板,,0,0.0,0.0,1.32,0.57,43.0,0.18,14.0,0.0,1.32,2.07,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,89,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 89,89,90,1-90,控制变压器,,0,0.0,0.0,9.68,4.16,43.0,1.36,14.0,0.0,9.68,15.2,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,90,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 90,90,91,1-91,单相胶盖闸(A) 15以内,,0,0.0,0.0,1.32,0.57,43.0,0.18,14.0,0.0,1.32,2.07,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,91,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 91,91,92,1-92,单相胶盖闸(A) 30以内,,0,0.0,0.0,1.76,0.76,43.0,0.25,14.0,0.0,1.76,2.77,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,92,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 92,92,93,1-93,单相胶盖闸(A) 60以内,,0,0.0,0.0,3.08,1.32,43.0,0.43,14.0,0.0,3.08,4.83,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,93,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 93,93,94,1-94,三相胶盖闸(A) 30以内,,0,0.0,0.0,2.2,0.95,43.0,0.31,14.0,0.0,2.2,3.46,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,94,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 94,94,95,1-95,三相胶盖闸(A) 100以内,,0,0.0,0.0,3.52,1.51,43.0,0.49,14.0,0.0,3.52,5.52,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,95,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 95,95,96,1-96,铁壳开关(A) 30以内,,0,0.0,0.0,3.96,1.7,43.0,0.55,14.0,0.0,3.96,6.21,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,96,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 96,96,97,1-97,铁壳开关(A) 100以内,,0,0.0,0.0,4.84,2.08,43.0,0.68,14.0,0.0,4.84,7.6,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,97,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 97,97,98,1-98,铁壳开关(A) 200以内,,0,0.0,0.0,5.28,2.27,43.0,0.74,14.0,0.0,5.28,8.29,,0.0,个,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,98,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 98,98,99,1-99,电流、电压表,,0,0.0,0.0,4.4,1.89,43.0,0.62,14.0,0.0,4.4,6.91,,0.0,台,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,99,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 99,99,100,1-100,电度表,,0,0.0,0.0,4.4,1.89,43.0,0.62,14.0,0.0,4.4,6.91,,0.0,台,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,100,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 100,100,101,1-101,继电器,,0,0.0,0.0,4.4,1.89,43.0,0.62,14.0,0.0,4.4,6.91,,0.0,台,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,101,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 101,101,102,1-102,主令控制器,,0,0.0,0.0,18.48,7.95,43.0,2.59,14.0,0.0,18.48,29.02,,0.0,台,0.0,,0.0,,201010500,,,,,1,,0.0,,,本体、接线、固定卡支架及接地等拆除。,,1.0,0,0.0,,,,102,第一章 电气设备工程 第一节 拆除工程 五、盘上电器具拆除
- 102,102,103,1-103,软线吊灯,,0,0.0,0.0,35.2,15.14,43.0,4.93,14.0,0.0,35.2,55.27,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,103,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 103,103,104,1-104,链式吊灯,,0,0.0,0.0,48.4,20.81,43.0,6.78,14.0,0.0,48.4,75.99,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,104,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 104,104,105,1-105,座灯头,,0,0.0,0.0,35.2,15.14,43.0,4.93,14.0,0.0,35.2,55.27,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,105,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 105,105,106,1-106,荧光灯 双火以内,,0,0.0,0.0,61.6,26.49,43.0,8.62,14.0,0.0,61.6,96.71,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,106,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 106,106,107,1-107,荧光灯 四火以内,,0,0.0,0.0,74.8,32.16,43.0,10.47,14.0,0.0,74.8,117.43,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,107,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 107,107,108,1-108,荧光灯 嵌入式、开启式,,0,0.0,0.0,92.4,39.73,43.0,12.94,14.0,0.0,92.4,145.07,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,108,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 108,108,109,1-109,吊杆灯,,0,0.0,0.0,26.4,11.35,43.0,3.7,14.0,0.0,26.4,41.45,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,109,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 109,109,110,1-110,弯脖灯,,0,0.0,0.0,26.4,11.35,43.0,3.7,14.0,0.0,26.4,41.45,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,110,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 110,110,111,1-111,防潮防爆灯,,0,0.0,0.0,44.0,18.92,43.0,6.16,14.0,0.0,44.0,69.08,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,111,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 111,111,112,1-112,出入口标志灯,,0,0.0,0.0,79.2,34.06,43.0,11.09,14.0,0.0,79.2,124.35,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,112,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 112,112,113,1-113,嵌入式筒灯,,0,0.0,0.0,35.2,15.14,43.0,4.93,14.0,0.0,35.2,55.27,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,113,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 113,113,114,1-114,投光灯,,0,0.0,0.0,105.6,45.41,43.0,14.78,14.0,0.0,105.6,165.79,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,114,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 114,114,115,1-115,碘钨灯,,0,0.0,0.0,61.6,26.49,43.0,8.62,14.0,0.0,61.6,96.71,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,115,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 115,115,116,1-116,管形氙气灯,,0,0.0,0.0,66.44,28.57,43.0,9.3,14.0,0.0,66.44,104.31,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,116,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 116,116,117,1-117,高压钠灯,,0,0.0,0.0,58.96,25.35,43.0,8.25,14.0,0.0,58.96,92.56,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,117,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 117,117,118,1-118,吸顶灯 双火以内,,0,0.0,0.0,39.6,17.03,43.0,5.54,14.0,0.0,39.6,62.17,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,118,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 118,118,119,1-119,吸顶灯 四火以内,,0,0.0,0.0,66.0,28.38,43.0,9.24,14.0,0.0,66.0,103.62,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,119,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 119,119,120,1-120,吸顶灯 六火以内,,0,0.0,0.0,127.6,54.87,43.0,17.86,14.0,0.0,127.6,200.33,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,120,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 120,120,121,1-121,吸顶灯 九火以内,,0,0.0,0.0,206.8,88.92,43.0,28.95,14.0,0.0,206.8,324.67,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,121,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 121,121,122,1-122,墙壁灯 单叉,,0,0.0,0.0,22.0,9.46,43.0,3.08,14.0,0.0,22.0,34.54,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,122,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 122,122,123,1-123,墙壁灯 双叉,,0,0.0,0.0,26.4,11.35,43.0,3.7,14.0,0.0,26.4,41.45,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,123,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 123,123,124,1-124,墙壁灯 三叉,,0,0.0,0.0,30.8,13.24,43.0,4.31,14.0,0.0,30.8,48.35,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,124,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 124,124,125,1-125,吊扇,,0,0.0,0.0,79.2,34.06,43.0,11.09,14.0,0.0,79.2,124.35,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,125,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 125,125,126,1-126,排风扇,,0,0.0,0.0,154.0,66.22,43.0,21.56,14.0,0.0,154.0,241.78,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,126,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 126,126,127,1-127,吊花灯 七火以内,,0,0.0,0.0,158.4,68.11,43.0,22.18,14.0,0.0,158.4,248.69,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,127,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 127,127,128,1-128,吊花灯 十五火以内,,0,0.0,0.0,312.4,134.33,43.0,43.74,14.0,0.0,312.4,490.47,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,128,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 128,128,129,1-129,吊花灯 二十四火以内,,0,0.0,0.0,620.4,266.77,43.0,86.86,14.0,0.0,620.4,974.03,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,129,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 129,129,130,1-130,吊花灯 三十六火以内,,0,0.0,0.0,1236.4,531.65,43.0,173.1,14.0,0.0,1236.4,1941.15,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,130,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 130,130,131,1-131,庭院灯 双火以内,,0,0.0,0.0,233.2,100.28,43.0,32.65,14.0,0.0,233.2,366.13,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,131,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 131,131,132,1-132,庭院灯 五火以内,,0,0.0,0.0,277.2,119.2,43.0,38.81,14.0,0.0,277.2,435.21,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,132,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 132,132,133,1-133,庭院灯 十火以内,,0,0.0,0.0,343.2,147.58,43.0,48.05,14.0,0.0,343.2,538.83,,0.0,10套,0.0,,0.0,,201010601,,,,,10,,0.0,,,圆木、支架、支持物、灯具、接线及瓷接头等拆除。,,1.0,0,0.0,,,,133,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 1、灯具拆除
- 133,133,134,1-134,明开关,,0,0.0,0.0,8.8,3.78,43.0,1.23,14.0,0.0,8.8,13.81,,0.0,10个,0.0,,0.0,,201010602,,,,,10,,0.0,,,木台、支架、支持物、开关、插座及接线等拆除。,,1.0,0,0.0,,,,134,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 2、各种开关拆除
- 134,134,135,1-135,暗开关,,0,0.0,0.0,13.2,5.68,43.0,1.85,14.0,0.0,13.2,20.73,,0.0,10个,0.0,,0.0,,201010602,,,,,10,,0.0,,,木台、支架、支持物、开关、插座及接线等拆除。,,1.0,0,0.0,,,,135,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 2、各种开关拆除
- 135,135,136,1-136,防水开关,,0,0.0,0.0,8.8,3.78,43.0,1.23,14.0,0.0,8.8,13.81,,0.0,10个,0.0,,0.0,,201010602,,,,,10,,0.0,,,木台、支架、支持物、开关、插座及接线等拆除。,,1.0,0,0.0,,,,136,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 2、各种开关拆除
- 136,136,137,1-137,电扇开关,,0,0.0,0.0,13.2,5.68,43.0,1.85,14.0,0.0,13.2,20.73,,0.0,10个,0.0,,0.0,,201010602,,,,,10,,0.0,,,木台、支架、支持物、开关、插座及接线等拆除。,,1.0,0,0.0,,,,137,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 2、各种开关拆除
- 137,137,138,1-138,行程开关,,0,0.0,0.0,13.2,5.68,43.0,1.85,14.0,0.0,13.2,20.73,,0.0,10个,0.0,,0.0,,201010602,,,,,10,,0.0,,,木台、支架、支持物、开关、插座及接线等拆除。,,1.0,0,0.0,,,,138,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 2、各种开关拆除
- 138,138,139,1-139,万能转换开关,,0,0.0,0.0,44.0,18.92,43.0,6.16,14.0,0.0,44.0,69.08,,0.0,10个,0.0,,0.0,,201010602,,,,,10,,0.0,,,木台、支架、支持物、开关、插座及接线等拆除。,,1.0,0,0.0,,,,139,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 2、各种开关拆除
- 139,139,140,1-140,明插座,,0,0.0,0.0,8.8,3.78,43.0,1.23,14.0,0.0,8.8,13.81,,0.0,10个,0.0,,0.0,,201010603,,,,,10,,0.0,,,木台、支架、支持物、开关、插座及接线等拆除。,,1.0,0,0.0,,,,140,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 3、各种插座拆除
- 140,140,141,1-141,暗插座,,0,0.0,0.0,13.2,5.68,43.0,1.85,14.0,0.0,13.2,20.73,,0.0,10个,0.0,,0.0,,201010603,,,,,10,,0.0,,,木台、支架、支持物、开关、插座及接线等拆除。,,1.0,0,0.0,,,,141,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 3、各种插座拆除
- 141,141,142,1-142,防水防溅带指示灯插座,,0,0.0,0.0,13.2,5.68,43.0,1.85,14.0,0.0,13.2,20.73,,0.0,10个,0.0,,0.0,,201010603,,,,,10,,0.0,,,木台、支架、支持物、开关、插座及接线等拆除。,,1.0,0,0.0,,,,142,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 3、各种插座拆除
- 142,142,143,1-143,剃须插座,,0,0.0,0.0,17.6,7.57,43.0,2.46,14.0,0.0,17.6,27.63,,0.0,10个,0.0,,0.0,,201010603,,,,,10,,0.0,,,木台、支架、支持物、开关、插座及接线等拆除。,,1.0,0,0.0,,,,143,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 3、各种插座拆除
- 143,143,144,1-144,马路弯灯,,0,0.0,0.0,105.6,45.41,43.0,14.78,14.0,0.0,105.6,165.79,,0.0,10套,0.0,,0.0,,201010604,,,,,10,,0.0,,,灯具、铁部件、配线及灯具附件等拆除。,,1.0,0,0.0,,,,144,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 4、杆上灯具拆除
- 144,144,145,1-145,角铁型路灯(3m以内),,0,0.0,0.0,127.6,54.87,43.0,17.86,14.0,0.0,127.6,200.33,,0.0,10套,0.0,,0.0,,201010604,,,,,10,,0.0,,,灯具、铁部件、配线及灯具附件等拆除。,,1.0,0,0.0,,,,145,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 4、杆上灯具拆除
- 145,145,146,1-146,投光灯、探照灯,,0,0.0,0.0,79.2,34.06,43.0,11.09,14.0,0.0,79.2,124.35,,0.0,10套,0.0,,0.0,,201010604,,,,,10,,0.0,,,灯具、铁部件、配线及灯具附件等拆除。,,1.0,0,0.0,,,,146,第一章 电气设备工程 第一节 拆除工程 六、灯器具、开关、插座拆除 4、杆上灯具拆除
- 146,146,147,1-147,木电杆 8m以内,,0,3.52,0.0,11.4,4.9,43.0,1.6,14.0,0.0,14.92,21.42,,0.0,根,0.0,,0.0,,201010700,,,,,1,,0.0,,,挖土、放杆、横担、担上器具、支撑、抱箍、拆拉线及拉线抱箍、回填坑等拆除。,,1.0,0,0.0,,,,147,第一章 电气设备工程 第一节 拆除工程 七、电杆、拉线、横担拆除
- 147,147,148,1-148,木电杆 12m以内,,0,3.52,0.0,17.25,7.42,43.0,2.42,14.0,0.0,20.77,30.61,,0.0,根,0.0,,0.0,,201010700,,,,,1,,0.0,,,挖土、放杆、横担、担上器具、支撑、抱箍、拆拉线及拉线抱箍、回填坑等拆除。,,1.0,0,0.0,,,,148,第一章 电气设备工程 第一节 拆除工程 七、电杆、拉线、横担拆除
- 148,148,149,1-149,混凝土电杆 8m以内,,0,0.04,15.64,29.26,12.58,43.0,4.1,14.0,0.0,44.94,61.62,,0.0,根,0.0,,0.0,,201010700,,,,,1,,0.0,,,挖土、放杆、横担、担上器具、支撑、抱箍、拆拉线及拉线抱箍、回填坑等拆除。,,1.0,0,0.0,,,,149,第一章 电气设备工程 第一节 拆除工程 七、电杆、拉线、横担拆除
- 149,149,150,1-150,混凝土电杆 12m以内,,0,0.04,15.64,58.52,25.16,43.0,8.19,14.0,0.0,74.2,107.55,,0.0,根,0.0,,0.0,,201010700,,,,,1,,0.0,,,挖土、放杆、横担、担上器具、支撑、抱箍、拆拉线及拉线抱箍、回填坑等拆除。,,1.0,0,0.0,,,,150,第一章 电气设备工程 第一节 拆除工程 七、电杆、拉线、横担拆除
- 150,150,151,1-151,拉线 普通,,0,0.0,0.0,13.2,5.68,43.0,1.85,14.0,0.0,13.2,20.73,,0.0,根,0.0,,0.0,,201010700,,,,,1,,0.0,,,挖土、放杆、横担、担上器具、支撑、抱箍、拆拉线及拉线抱箍、回填坑等拆除。,,1.0,0,0.0,,,,151,第一章 电气设备工程 第一节 拆除工程 七、电杆、拉线、横担拆除
- 151,151,152,1-152,拉线 水平,,0,0.0,0.0,26.4,11.35,43.0,3.7,14.0,0.0,26.4,41.45,,0.0,根,0.0,,0.0,,201010700,,,,,1,,0.0,,,挖土、放杆、横担、担上器具、支撑、抱箍、拆拉线及拉线抱箍、回填坑等拆除。,,1.0,0,0.0,,,,152,第一章 电气设备工程 第一节 拆除工程 七、电杆、拉线、横担拆除
- 152,152,153,1-153,拉线 V形(组),,0,0.0,0.0,36.96,15.89,43.0,5.17,14.0,0.0,36.96,58.02,,0.0,根,0.0,,0.0,,201010700,,,,,1,,0.0,,,挖土、放杆、横担、担上器具、支撑、抱箍、拆拉线及拉线抱箍、回填坑等拆除。,,1.0,0,0.0,,,,153,第一章 电气设备工程 第一节 拆除工程 七、电杆、拉线、横担拆除
- 153,153,154,1-154,铁横担 四线,,0,0.0,0.0,8.8,3.78,43.0,1.23,14.0,0.0,8.8,13.81,,0.0,组,0.0,,0.0,,201010700,,,,,1,,0.0,,,挖土、放杆、横担、担上器具、支撑、抱箍、拆拉线及拉线抱箍、回填坑等拆除。,,1.0,0,0.0,,,,154,第一章 电气设备工程 第一节 拆除工程 七、电杆、拉线、横担拆除
- 154,154,155,1-155,铁横担 六线,,0,0.0,0.0,9.24,3.97,43.0,1.29,14.0,0.0,9.24,14.5,,0.0,组,0.0,,0.0,,201010700,,,,,1,,0.0,,,挖土、放杆、横担、担上器具、支撑、抱箍、拆拉线及拉线抱箍、回填坑等拆除。,,1.0,0,0.0,,,,155,第一章 电气设备工程 第一节 拆除工程 七、电杆、拉线、横担拆除
- 155,155,156,1-156,低压架空线(mm2) 50以内,,0,0.0,0.0,10.56,4.54,43.0,1.48,14.0,0.0,10.56,16.58,,0.0,100m,0.0,,0.0,,201010800,,,,,100,,0.0,,,解绑线、断线、拆线、盘线、线分类待拆除。,,1.0,0,0.0,,,,156,第一章 电气设备工程 第一节 拆除工程 八、低压架空线及引入线拆除
- 156,156,157,1-157,低压架空线(mm2) 120以内,,0,0.0,0.0,18.04,7.76,43.0,2.53,14.0,0.0,18.04,28.33,,0.0,100m,0.0,,0.0,,201010800,,,,,100,,0.0,,,解绑线、断线、拆线、盘线、线分类待拆除。,,1.0,0,0.0,,,,157,第一章 电气设备工程 第一节 拆除工程 八、低压架空线及引入线拆除
- 157,157,158,1-158,低压架空线(mm2) 185以内,,0,0.0,0.0,28.6,12.3,43.0,4.0,14.0,0.0,28.6,44.9,,0.0,100m,0.0,,0.0,,201010800,,,,,100,,0.0,,,解绑线、断线、拆线、盘线、线分类待拆除。,,1.0,0,0.0,,,,158,第一章 电气设备工程 第一节 拆除工程 八、低压架空线及引入线拆除
- 158,158,159,1-159,低压架空引入线(mm2以内) 二线 35,,0,0.0,0.0,449.24,193.17,43.0,62.89,14.0,0.0,449.24,705.3,,0.0,10组,0.0,,0.0,,201010800,,,,,10,,0.0,,,解绑线、断线、拆线、盘线、线分类待拆除。,,1.0,0,0.0,,,,159,第一章 电气设备工程 第一节 拆除工程 八、低压架空线及引入线拆除
- 159,159,160,1-160,低压架空引入线(mm2以内) 四线 50,,0,0.0,0.0,643.72,276.8,43.0,90.12,14.0,0.0,643.72,1010.64,,0.0,10组,0.0,,0.0,,201010800,,,,,10,,0.0,,,解绑线、断线、拆线、盘线、线分类待拆除。,,1.0,0,0.0,,,,160,第一章 电气设备工程 第一节 拆除工程 八、低压架空线及引入线拆除
- 160,160,161,1-161,低压架空引入线(mm2以内) 四线 120,,0,0.0,0.0,898.48,386.35,43.0,125.79,14.0,0.0,898.48,1410.62,,0.0,10组,0.0,,0.0,,201010800,,,,,10,,0.0,,,解绑线、断线、拆线、盘线、线分类待拆除。,,1.0,0,0.0,,,,161,第一章 电气设备工程 第一节 拆除工程 八、低压架空线及引入线拆除
- 161,161,162,1-162,低压架空引入线(mm2以内) 六线 50,,0,0.0,0.0,752.4,323.53,43.0,105.34,14.0,0.0,752.4,1181.27,,0.0,10组,0.0,,0.0,,201010800,,,,,10,,0.0,,,解绑线、断线、拆线、盘线、线分类待拆除。,,1.0,0,0.0,,,,162,第一章 电气设备工程 第一节 拆除工程 八、低压架空线及引入线拆除
- 162,162,163,1-163,低压架空引入线(mm2以内) 六线 120,,0,0.0,0.0,1122.88,482.84,43.0,157.2,14.0,0.0,1122.88,1762.92,,0.0,10组,0.0,,0.0,,201010800,,,,,10,,0.0,,,解绑线、断线、拆线、盘线、线分类待拆除。,,1.0,0,0.0,,,,163,第一章 电气设备工程 第一节 拆除工程 八、低压架空线及引入线拆除
- 163,163,164,1-164,夹板配线拆换(mm2以内) 1.5,,0,83.09,0.0,158.4,68.11,43.0,22.18,14.0,0.0,241.49,331.78,,0.0,100m,0.0,,0.0,,201020101,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,164,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 1、夹板配线拆换
- 164,164,165,1-165,夹板配线拆换(mm2以内) 2.5,,0,98.11,0.0,172.48,74.17,43.0,24.15,14.0,0.0,270.59,368.91,,0.0,100m,0.0,,0.0,,201020101,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,165,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 1、夹板配线拆换
- 165,165,166,1-166,夹板配线拆换(mm2以内) 4,,0,96.97,0.0,184.8,79.46,43.0,25.87,14.0,0.0,281.77,387.1,,0.0,100m,0.0,,0.0,,201020101,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,166,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 1、夹板配线拆换
- 166,166,167,1-167,灯吊线拆换 软吊灯,,0,294.8,0.0,22.0,9.46,43.0,3.08,14.0,0.0,316.8,329.34,,0.0,10套,0.0,,0.0,,201020101,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,167,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 1、夹板配线拆换
- 167,167,168,1-168,灯吊线拆换 链式灯,,0,228.45,0.0,74.8,32.16,43.0,10.47,14.0,0.0,303.25,345.88,,0.0,10套,0.0,,0.0,,201020101,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,168,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 1、夹板配线拆换
- 168,168,169,1-169,灯吊线拆换 吊杆灯,,0,228.45,0.0,61.6,26.49,43.0,8.62,14.0,0.0,290.05,325.16,,0.0,10套,0.0,,0.0,,201020101,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,169,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 1、夹板配线拆换
- 169,169,170,1-170,灯吊线拆换 荧光灯,,0,228.3,0.0,30.8,13.24,43.0,4.31,14.0,0.0,259.1,276.65,,0.0,10套,0.0,,0.0,,201020101,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,170,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 1、夹板配线拆换
- 170,170,171,1-171,鼓形绝缘子配线拆换(导线截面mm2) 2.5,,0,42.11,0.0,88.0,37.84,43.0,12.32,14.0,0.0,130.11,180.27,,0.0,100m,0.0,,0.0,,201020102,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,171,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 2、鼓形绝缘子配线拆换
- 171,171,172,1-172,鼓形绝缘子配线拆换(导线截面mm2) 4,,0,40.4,0.0,84.04,36.14,43.0,11.77,14.0,0.0,124.44,172.35,,0.0,100m,0.0,,0.0,,201020102,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,172,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 2、鼓形绝缘子配线拆换
- 172,172,173,1-173,鼓形绝缘子配线拆换(导线截面mm2) 6,,0,40.38,0.0,84.04,36.14,43.0,11.77,14.0,0.0,124.42,172.33,,0.0,100m,0.0,,0.0,,201020102,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,173,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 2、鼓形绝缘子配线拆换
- 173,173,174,1-174,鼓形绝缘子配线拆换(导线截面mm2) 10,,0,40.38,0.0,84.04,36.14,43.0,11.77,14.0,0.0,124.42,172.33,,0.0,100m,0.0,,0.0,,201020102,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,174,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 2、鼓形绝缘子配线拆换
- 174,174,175,1-175,针式绝缘子配线拆换(导线截面mm2) 2.5,,0,161.49,0.0,58.52,25.16,43.0,8.19,14.0,0.0,220.01,253.36,,0.0,100m,0.0,,0.0,,201020103,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,175,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 3、针式绝子配线拆换
- 175,175,176,1-176,针式绝缘子配线拆换(导线截面mm2) 4,,0,162.03,0.0,58.52,25.16,43.0,8.19,14.0,0.0,220.55,253.9,,0.0,100m,0.0,,0.0,,201020103,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,176,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 3、针式绝子配线拆换
- 176,176,177,1-177,针式绝缘子配线拆换(导线截面mm2) 6,,0,162.03,0.0,66.44,28.57,43.0,9.3,14.0,0.0,228.47,266.34,,0.0,100m,0.0,,0.0,,201020103,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,177,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 3、针式绝子配线拆换
- 177,177,178,1-178,针式绝缘子配线拆换(导线截面mm2) 10,,0,153.51,0.0,79.2,34.06,43.0,11.09,14.0,0.0,232.71,277.86,,0.0,100m,0.0,,0.0,,201020103,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,178,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 3、针式绝子配线拆换
- 178,178,179,1-179,针式绝缘子配线拆换(导线截面mm2) 16,,0,153.51,0.0,79.2,34.06,43.0,11.09,14.0,0.0,232.71,277.86,,0.0,100m,0.0,,0.0,,201020103,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,179,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 3、针式绝子配线拆换
- 179,179,180,1-180,针式绝缘子配线拆换(导线截面mm2) 25,,0,153.51,0.0,79.2,34.06,43.0,11.09,14.0,0.0,232.71,277.86,,0.0,100m,0.0,,0.0,,201020103,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,180,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 3、针式绝子配线拆换
- 180,180,181,1-181,木槽板配线折换 二线(导线截面mm2) 2.5,,0,80.11,0.0,331.76,142.66,43.0,46.45,14.0,0.0,411.87,600.98,,0.0,100m,0.0,,0.0,,201020104,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,181,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 4、木槽板配线折换
- 181,181,182,1-182,木槽板配线折换 二线(导线截面mm2) 4,,0,80.83,0.0,348.48,149.85,43.0,48.79,14.0,0.0,429.31,627.95,,0.0,100m,0.0,,0.0,,201020104,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,182,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 4、木槽板配线折换
- 182,182,183,1-183,木槽板配线折换 二线(导线截面mm2) 6,,0,80.83,0.0,348.48,149.85,43.0,48.79,14.0,0.0,429.31,627.95,,0.0,100m,0.0,,0.0,,201020104,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,183,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 4、木槽板配线折换
- 183,183,184,1-184,木槽板配线折换 三线(导线截面mm2) 2.5,,0,118.34,0.0,443.52,190.71,43.0,62.09,14.0,0.0,561.86,814.66,,0.0,100m,0.0,,0.0,,201020104,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,184,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 4、木槽板配线折换
- 184,184,185,1-185,木槽板配线折换 三线(导线截面mm2) 4,,0,118.62,0.0,453.2,194.88,43.0,63.45,14.0,0.0,571.82,830.15,,0.0,100m,0.0,,0.0,,201020104,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,185,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 4、木槽板配线折换
- 185,185,186,1-186,木槽板配线折换 三线(导线截面mm2) 6,,0,118.94,0.0,453.2,194.88,43.0,63.45,14.0,0.0,572.14,830.47,,0.0,100m,0.0,,0.0,,201020104,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,186,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 4、木槽板配线折换
- 186,186,187,1-187,管内抽换线 导线截面(mm2) 2.5,,0,5.61,0.0,44.88,19.3,43.0,6.28,14.0,0.0,50.49,76.07,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,187,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 187,187,188,1-188,管内抽换线 导线截面(mm2) 4,,0,5.61,0.0,50.16,21.57,43.0,7.02,14.0,0.0,55.77,84.36,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,188,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 188,188,189,1-189,管内抽换线 导线截面(mm2) 6,,0,5.66,0.0,50.16,21.57,43.0,7.02,14.0,0.0,55.82,84.41,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,189,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 189,189,190,1-190,管内抽换线 导线截面(mm2) 10,,0,10.0,0.0,53.24,22.89,43.0,7.45,14.0,0.0,63.24,93.58,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,190,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 190,190,191,1-191,管内抽换线 导线截面(mm2) 16,,0,10.0,0.0,53.24,22.89,43.0,7.45,14.0,0.0,63.24,93.58,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,191,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 191,191,192,1-192,管内抽换线 导线截面(mm2) 25,,0,10.0,0.0,62.48,26.87,43.0,8.75,14.0,0.0,72.48,108.1,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,192,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 192,192,193,1-193,管内抽换线 导线截面(mm2) 35,,0,10.0,0.0,62.48,26.87,43.0,8.75,14.0,0.0,72.48,108.1,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,193,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 193,193,194,1-194,管内抽换线 导线截面(mm2) 50,,0,10.0,0.0,71.28,30.65,43.0,9.98,14.0,0.0,81.28,121.91,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,194,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 194,194,195,1-195,管内抽换线 导线截面(mm2) 70,,0,14.02,0.0,71.28,30.65,43.0,9.98,14.0,0.0,85.3,125.93,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,195,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 195,195,196,1-196,管内抽换线 导线截面(mm2) 95,,0,14.02,0.0,134.64,57.9,43.0,18.85,14.0,0.0,148.66,225.41,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,196,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 196,196,197,1-197,管内抽换线 导线截面(mm2) 120,,0,13.02,0.0,134.64,57.9,43.0,18.85,14.0,0.0,147.66,224.41,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,197,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 197,197,198,1-198,管内抽换线 导线截面(mm2) 150,,0,17.45,0.0,195.36,84.0,43.0,27.35,14.0,0.0,212.81,324.16,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,198,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 198,198,199,1-199,管内抽换线 导线截面(mm2) 185,,0,17.49,0.0,195.36,84.0,43.0,27.35,14.0,0.0,212.85,324.2,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,199,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 199,199,200,1-200,双股胶质线,,0,4.69,0.0,40.48,17.41,43.0,5.67,14.0,0.0,45.17,68.25,,0.0,100m,0.0,,0.0,,201020105,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,200,第一章 电气设备工程 第二节 拆换工程 一、配线拆换 5、管内抽换线
- 200,200,201,1-201,杆上支持物拆换 针式绝缘子,,0,5.0,0.0,22.0,9.46,43.0,3.08,14.0,0.0,27.0,39.54,,0.0,10份,0.0,,0.0,,201020201,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,201,第一章 电气设备工程 第二节 拆换工程 二、电杆上支持物拆换 1、杆上支持物拆换
- 201,201,202,1-202,杆上支持物拆换 弯角瓷瓶,,0,5.0,0.0,17.6,7.57,43.0,2.46,14.0,0.0,22.6,32.63,,0.0,10份,0.0,,0.0,,201020201,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,202,第一章 电气设备工程 第二节 拆换工程 二、电杆上支持物拆换 1、杆上支持物拆换
- 202,202,203,1-203,杆上支持物拆换 蝶式绝缘子,,0,5.0,0.0,44.0,18.92,43.0,6.16,14.0,0.0,49.0,74.08,,0.0,10份,0.0,,0.0,,201020201,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,203,第一章 电气设备工程 第二节 拆换工程 二、电杆上支持物拆换 1、杆上支持物拆换
- 203,203,204,1-204,铁横担拆换(1kv) 二线,,0,5.0,0.0,184.8,79.46,43.0,25.87,14.0,0.0,189.8,295.13,,0.0,10根,0.0,,0.0,,201020202,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,204,第一章 电气设备工程 第二节 拆换工程 二、电杆上支持物拆换 2、杆上横担拆换
- 204,204,205,1-205,铁横担拆换(1kv) 四线,,0,5.0,0.0,211.2,90.82,43.0,29.57,14.0,0.0,216.2,336.59,,0.0,10根,0.0,,0.0,,201020202,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,205,第一章 电气设备工程 第二节 拆换工程 二、电杆上支持物拆换 2、杆上横担拆换
- 205,205,206,1-206,铁横担拆换(1kv) 六线,,0,6.0,0.0,264.0,113.52,43.0,36.96,14.0,0.0,270.0,420.48,,0.0,10根,0.0,,0.0,,201020202,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,206,第一章 电气设备工程 第二节 拆换工程 二、电杆上支持物拆换 2、杆上横担拆换
- 206,206,207,1-207,低压架空裸绞线拆换(导线截面mm2) 16,,0,19.46,0.0,37.4,16.08,43.0,5.24,14.0,0.0,56.86,78.18,,0.0,100m,0.0,,0.0,,201020301,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,207,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 1、低压架空裸绞线拆换
- 207,207,208,1-208,低压架空裸绞线拆换(导线截面mm2) 25,,0,19.46,0.0,44.44,19.11,43.0,6.22,14.0,0.0,63.9,89.23,,0.0,100m,0.0,,0.0,,201020301,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,208,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 1、低压架空裸绞线拆换
- 208,208,209,1-209,低压架空裸绞线拆换(导线截面mm2) 35,,0,21.97,0.0,44.44,19.11,43.0,6.22,14.0,0.0,66.41,91.74,,0.0,100m,0.0,,0.0,,201020301,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,209,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 1、低压架空裸绞线拆换
- 209,209,210,1-210,低压架空裸绞线拆换(导线截面mm2) 50,,0,27.58,0.0,52.8,22.7,43.0,7.39,14.0,0.0,80.38,110.47,,0.0,100m,0.0,,0.0,,201020301,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,210,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 1、低压架空裸绞线拆换
- 210,210,211,1-211,低压架空裸绞线拆换(导线截面mm2) 70,,0,30.17,0.0,52.8,22.7,43.0,7.39,14.0,0.0,82.97,113.06,,0.0,100m,0.0,,0.0,,201020301,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,211,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 1、低压架空裸绞线拆换
- 211,211,212,1-212,低压架空裸绞线拆换(导线截面mm2) 95,,0,35.51,0.0,78.76,33.87,43.0,11.03,14.0,0.0,114.27,159.17,,0.0,100m,0.0,,0.0,,201020301,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,212,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 1、低压架空裸绞线拆换
- 212,212,213,1-213,低压架空裸绞线拆换(导线截面mm2) 120,,0,40.82,0.0,78.76,33.87,43.0,11.03,14.0,0.0,119.58,164.48,,0.0,100m,0.0,,0.0,,201020301,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,213,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 1、低压架空裸绞线拆换
- 213,213,214,1-214,低压架空橡皮绝缘线拆换(导线截面mm2) 16,,0,8.47,0.0,37.4,16.08,43.0,5.24,14.0,0.0,45.87,67.19,,0.0,100m,0.0,,0.0,,201020302,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,214,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 2、低压架空橡皮绝缘线拆换
- 214,214,215,1-215,低压架空橡皮绝缘线拆换(导线截面mm2) 25,,0,8.47,0.0,44.44,19.11,43.0,6.22,14.0,0.0,52.91,78.24,,0.0,100m,0.0,,0.0,,201020302,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,215,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 2、低压架空橡皮绝缘线拆换
- 215,215,216,1-216,低压架空橡皮绝缘线拆换(导线截面mm2) 35,,0,8.92,0.0,44.44,19.11,43.0,6.22,14.0,0.0,53.36,78.69,,0.0,100m,0.0,,0.0,,201020302,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,216,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 2、低压架空橡皮绝缘线拆换
- 216,216,217,1-217,低压架空橡皮绝缘线拆换(导线截面mm2) 50,,0,14.53,0.0,52.8,22.7,43.0,7.39,14.0,0.0,67.33,97.42,,0.0,100m,0.0,,0.0,,201020302,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,217,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 2、低压架空橡皮绝缘线拆换
- 217,217,218,1-218,低压架空橡皮绝缘线拆换(导线截面mm2) 70,,0,14.87,0.0,52.8,22.7,43.0,7.39,14.0,0.0,67.67,97.76,,0.0,100m,0.0,,0.0,,201020302,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,218,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 2、低压架空橡皮绝缘线拆换
- 218,218,219,1-219,低压架空橡皮绝缘线拆换(导线截面mm2) 95,,0,16.99,0.0,78.76,33.87,43.0,11.03,14.0,0.0,95.75,140.65,,0.0,100m,0.0,,0.0,,201020302,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,219,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 2、低压架空橡皮绝缘线拆换
- 219,219,220,1-220,低压架空橡皮绝缘线拆换(导线截面mm2) 120,,0,20.43,0.0,78.76,33.87,43.0,11.03,14.0,0.0,99.19,144.09,,0.0,100m,0.0,,0.0,,201020302,,,,,100,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,220,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 2、低压架空橡皮绝缘线拆换
- 220,220,221,1-221,低压引入线拆换 二线(导线截面mm2) 6,,0,290.94,0.0,528.0,227.04,43.0,73.92,14.0,0.0,818.94,1119.9,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,221,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 221,221,222,1-222,低压引入线拆换 二线(导线截面mm2) 10,,0,290.94,0.0,528.0,227.04,43.0,73.92,14.0,0.0,818.94,1119.9,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,222,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 222,222,223,1-223,低压引入线拆换 二线(导线截面mm2) 16,,0,290.94,0.0,528.0,227.04,43.0,73.92,14.0,0.0,818.94,1119.9,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,223,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 223,223,224,1-224,低压引入线拆换 二线(导线截面mm2) 25,,0,291.0,0.0,633.6,272.45,43.0,88.7,14.0,0.0,924.6,1285.75,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,224,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 224,224,225,1-225,低压引入线拆换 二线(导线截面mm2) 35,,0,317.65,0.0,633.6,272.45,43.0,88.7,14.0,0.0,951.25,1312.4,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,225,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 225,225,226,1-226,低压引入线拆换 四线(导线截面mm2) 6,,0,579.06,0.0,643.72,276.8,43.0,90.12,14.0,0.0,1222.78,1589.7,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,226,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 226,226,227,1-227,低压引入线拆换 四线(导线截面mm2) 10,,0,579.06,0.0,643.72,276.8,43.0,90.12,14.0,0.0,1222.78,1589.7,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,227,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 227,227,228,1-228,低压引入线拆换 四线(导线截面mm2) 16,,0,579.06,0.0,643.72,276.8,43.0,90.12,14.0,0.0,1222.78,1589.7,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,228,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 228,228,229,1-229,低压引入线拆换 四线(导线截面mm2) 25,,0,579.24,0.0,643.72,276.8,43.0,90.12,14.0,0.0,1222.96,1589.88,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,229,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 229,229,230,1-230,低压引入线拆换 四线(导线截面mm2) 35,,0,632.54,0.0,752.4,323.53,43.0,105.34,14.0,0.0,1384.94,1813.81,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,230,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 230,230,231,1-231,低压引入线拆换 四线(导线截面mm2) 50,,0,1079.14,0.0,752.4,323.53,43.0,105.34,14.0,0.0,1831.54,2260.41,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,231,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 231,231,232,1-232,低压引入线拆换 四线(导线截面mm2) 70,,0,2037.96,0.0,752.4,323.53,43.0,105.34,14.0,0.0,2790.36,3219.23,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,232,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 232,232,233,1-233,低压引入线拆换 四线(导线截面mm2) 95,,0,2452.06,0.0,898.48,386.35,43.0,125.79,14.0,0.0,3350.54,3862.68,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,233,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 233,233,234,1-234,低压引入线拆换 四线(导线截面mm2) 120,,0,2939.26,0.0,898.48,386.35,43.0,125.79,14.0,0.0,3837.74,4349.88,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,234,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 234,234,235,1-235,低压引入线拆换 六线(导线截面mm2) 6,,0,866.78,0.0,752.4,323.53,43.0,105.34,14.0,0.0,1619.18,2048.05,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,235,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 235,235,236,1-236,低压引入线拆换 六线(导线截面mm2) 10,,0,866.78,0.0,752.4,323.53,43.0,105.34,14.0,0.0,1619.18,2048.05,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,236,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 236,236,237,1-237,低压引入线拆换 六线(导线截面mm2) 16,,0,866.78,0.0,752.4,323.53,43.0,105.34,14.0,0.0,1619.18,2048.05,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,237,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 237,237,238,1-238,低压引入线拆换 六线(导线截面mm2) 25,,0,866.9,0.0,752.4,323.53,43.0,105.34,14.0,0.0,1619.3,2048.17,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,238,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 238,238,239,1-239,低压引入线拆换 六线(导线截面mm2) 35,,0,946.85,0.0,898.48,386.35,43.0,125.79,14.0,0.0,1845.33,2357.47,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,239,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 239,239,240,1-240,低压引入线拆换 六线(导线截面mm2) 50,,0,1616.75,0.0,898.48,386.35,43.0,125.79,14.0,0.0,2515.23,3027.37,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,240,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 240,240,241,1-241,低压引入线拆换 六线(导线截面mm2) 70,,0,3054.95,0.0,898.48,386.35,43.0,125.79,14.0,0.0,3953.43,4465.57,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,241,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 241,241,242,1-242,低压引入线拆换 六线(导线截面mm2) 95,,0,3676.22,0.0,1122.88,482.84,43.0,157.2,14.0,0.0,4799.1,5439.14,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,242,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 242,242,243,1-243,低压引入线拆换 六线(导线截面mm2) 120,,0,4407.02,0.0,1122.88,482.84,43.0,157.2,14.0,0.0,5529.9,6169.94,,0.0,10组,0.0,,0.0,,201020303,,,,,10,,0.0,,,包括打半眼、下胀管、部件清洗、拆配线、接焊包(压)头、送电试亮等全部过程。,,1.0,0,0.0,,,,243,第一章 电气设备工程 第二节 拆换工程 三、低压架空线、引入线拆换 3、低压引入线拆换
- 243,243,244,1-244,瓷夹板配线整修 导线截面(mm2) 2.5,,0,133.54,0.0,30.36,13.05,43.0,4.25,14.0,0.0,163.9,181.2,,0.0,100m,0.0,,0.0,,201030100,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,244,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 244,244,245,1-245,瓷夹板配线整修 导线截面(mm2) 6,,0,119.87,0.0,31.68,13.62,43.0,4.44,14.0,0.0,151.55,169.61,,0.0,100m,0.0,,0.0,,201030100,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,245,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 245,245,246,1-246,灯具、插座、分支线 普通吊线灯,,0,384.25,0.0,39.6,17.03,43.0,5.54,14.0,0.0,423.85,446.42,,0.0,10套,0.0,,0.0,,201030100,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,246,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 246,246,247,1-247,灯具、插座、分支线 瓷罗平灯口,,0,91.75,0.0,39.6,17.03,43.0,5.54,14.0,0.0,131.35,153.92,,0.0,10套,0.0,,0.0,,201030100,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,247,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 247,247,248,1-248,灯具、插座、分支线 各式壁灯,,0,89.63,0.0,39.6,17.03,43.0,5.54,14.0,0.0,129.23,151.8,,0.0,10套,0.0,,0.0,,201030100,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,248,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 248,248,249,1-249,灯具、插座、分支线 各式荧光灯,,0,220.13,0.0,39.6,17.03,43.0,5.54,14.0,0.0,259.73,282.3,,0.0,10套,0.0,,0.0,,201030100,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,249,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 249,249,250,1-250,灯具、插座、分支线 普通吸顶灯,,0,87.53,0.0,22.0,9.46,43.0,3.08,14.0,0.0,109.53,122.07,,0.0,10套,0.0,,0.0,,201030100,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,250,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 250,250,251,1-251,廊檐及室外干线(mm2) 2.5,,0,21.22,0.0,17.16,7.38,43.0,2.4,14.0,0.0,38.38,48.16,,0.0,100m,0.0,,0.0,,201030100,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,251,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 251,251,252,1-252,廊檐及室外干线(mm2) 4,,0,21.22,0.0,17.16,7.38,43.0,2.4,14.0,0.0,38.38,48.16,,0.0,100m,0.0,,0.0,,201030100,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,252,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 252,252,253,1-253,廊檐及室外干线(mm2) 6,,0,18.58,0.0,17.16,7.38,43.0,2.4,14.0,0.0,35.74,45.52,,0.0,100m,0.0,,0.0,,201030100,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,253,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 253,253,254,1-254,廊檐及室外干线(mm2) 10,,0,18.58,0.0,17.16,7.38,43.0,2.4,14.0,0.0,35.74,45.52,,0.0,100m,0.0,,0.0,,201030100,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,254,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 254,254,255,1-255,针式绝缘子沿墙干线整修(mm2) 2.5,,0,91.6,0.0,17.16,7.38,43.0,2.4,14.0,0.0,108.76,118.54,,0.0,100m,0.0,,0.0,,201030100,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,255,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 255,255,256,1-256,针式绝缘子沿墙干线整修(mm2) 4,,0,91.6,0.0,17.16,7.38,43.0,2.4,14.0,0.0,108.76,118.54,,0.0,100m,0.0,,0.0,,201030100,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,256,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 256,256,257,1-257,针式绝缘子沿墙干线整修(mm2) 6,,0,91.6,0.0,17.16,7.38,43.0,2.4,14.0,0.0,108.76,118.54,,0.0,100m,0.0,,0.0,,201030100,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,257,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 257,257,258,1-258,针式绝缘子沿墙干线整修(mm2) 10,,0,76.96,0.0,17.16,7.38,43.0,2.4,14.0,0.0,94.12,103.9,,0.0,100m,0.0,,0.0,,201030100,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,258,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 258,258,259,1-259,针式绝缘子沿墙干线整修(mm2) 16,,0,76.96,0.0,13.2,5.68,43.0,1.85,14.0,0.0,90.16,97.69,,0.0,100m,0.0,,0.0,,201030100,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,259,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 259,259,260,1-260,针式绝缘子沿墙干线整修(mm2) 25,,0,76.96,0.0,13.2,5.68,43.0,1.85,14.0,0.0,90.16,97.69,,0.0,100m,0.0,,0.0,,201030100,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,260,第一章 电气设备工程 第三节 整修工程 一、瓷夹板配线整修
- 260,260,261,1-261,木槽板干线整修(mm2) 二线 2.5,,0,34.27,0.0,147.84,63.57,43.0,20.7,14.0,0.0,182.11,266.38,,0.0,100m,0.0,,0.0,,201030200,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,261,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 261,261,262,1-262,木槽板干线整修(mm2) 二线 4,,0,34.27,0.0,147.84,63.57,43.0,20.7,14.0,0.0,182.11,266.38,,0.0,100m,0.0,,0.0,,201030200,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,262,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 262,262,263,1-263,木槽板干线整修(mm2) 二线 6,,0,34.27,0.0,147.84,63.57,43.0,20.7,14.0,0.0,182.11,266.38,,0.0,100m,0.0,,0.0,,201030200,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,263,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 263,263,264,1-264,木槽板干线整修(mm2) 三线 2.5,,0,64.18,0.0,240.24,103.3,43.0,33.63,14.0,0.0,304.42,441.35,,0.0,100m,0.0,,0.0,,201030200,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,264,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 264,264,265,1-265,木槽板干线整修(mm2) 三线 4,,0,64.18,0.0,240.24,103.3,43.0,33.63,14.0,0.0,304.42,441.35,,0.0,100m,0.0,,0.0,,201030200,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,265,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 265,265,266,1-266,木槽板干线整修(mm2) 三线 6,,0,64.18,0.0,240.24,103.3,43.0,33.63,14.0,0.0,304.42,441.35,,0.0,100m,0.0,,0.0,,201030200,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,266,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 266,266,267,1-267,木槽板二线灯具、插座、分支线整修 普通吊线灯,,0,336.47,0.0,26.4,11.35,43.0,3.7,14.0,0.0,362.87,377.92,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,267,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 267,267,268,1-268,木槽板二线灯具、插座、分支线整修 瓷罗平灯口,,0,43.97,0.0,26.4,11.35,43.0,3.7,14.0,0.0,70.37,85.42,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,268,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 268,268,269,1-269,木槽板二线灯具、插座、分支线整修 吊链灯,,0,43.97,0.0,26.4,11.35,43.0,3.7,14.0,0.0,70.37,85.42,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,269,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 269,269,270,1-270,木槽板二线灯具、插座、分支线整修 各式壁灯,,0,43.97,0.0,26.4,11.35,43.0,3.7,14.0,0.0,70.37,85.42,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,270,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 270,270,271,1-271,木槽板二线灯具、插座、分支线整修 各式荧光灯,,0,176.57,0.0,26.4,11.35,43.0,3.7,14.0,0.0,202.97,218.02,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,271,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 271,271,272,1-272,木槽板二线灯具、插座、分支线整修 各式插座,,0,40.82,0.0,17.6,7.57,43.0,2.46,14.0,0.0,58.42,68.45,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,272,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 272,272,273,1-273,木槽板二线灯具、插座、分支线整修 普通吸顶灯,,0,43.97,0.0,17.6,7.57,43.0,2.46,14.0,0.0,61.57,71.6,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,273,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 273,273,274,1-274,木槽板三线灯具、插座、分支线整修 普通吊线灯,,0,545.45,0.0,26.4,11.35,43.0,3.7,14.0,0.0,571.85,586.9,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,274,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 274,274,275,1-275,木槽板三线灯具、插座、分支线整修 瓷罗平灯口,,0,252.95,0.0,26.4,11.35,43.0,3.7,14.0,0.0,279.35,294.4,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,275,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 275,275,276,1-276,木槽板三线灯具、插座、分支线整修 吊链灯,,0,252.95,0.0,26.4,11.35,43.0,3.7,14.0,0.0,279.35,294.4,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,276,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 276,276,277,1-277,木槽板三线灯具、插座、分支线整修 各式壁灯,,0,252.95,0.0,26.4,11.35,43.0,3.7,14.0,0.0,279.35,294.4,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,277,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 277,277,278,1-278,木槽板三线灯具、插座、分支线整修 各式荧光灯,,0,385.55,0.0,26.4,11.35,43.0,3.7,14.0,0.0,411.95,427.0,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,278,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 278,278,279,1-279,木槽板三线灯具、插座、分支线整修 各式插座,,0,252.95,0.0,17.6,7.57,43.0,2.46,14.0,0.0,270.55,280.58,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,279,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 279,279,280,1-280,木槽板三线灯具、插座、分支线整修 普通吸顶灯,,0,252.95,0.0,17.6,7.57,43.0,2.46,14.0,0.0,270.55,280.58,,0.0,10套,0.0,,0.0,,201030200,,,,,10,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,280,第一章 电气设备工程 第三节 整修工程 二、木槽板配线整修
- 280,280,281,1-281,电线管公称直径(mm) φ15~25,,0,53.04,0.0,90.64,38.98,43.0,12.69,14.0,0.0,143.68,195.35,,0.0,100m,0.0,,0.0,,201030300,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,281,第一章 电气设备工程 第三节 整修工程 三、明配电线管整修
- 281,281,282,1-282,电线管公称直径(mm) φ32~50,,0,48.35,0.0,124.96,53.73,43.0,17.49,14.0,0.0,173.31,244.53,,0.0,100m,0.0,,0.0,,201030300,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,282,第一章 电气设备工程 第三节 整修工程 三、明配电线管整修
- 282,282,283,1-283,钢管公称直径(mm) φ15~25,,0,63.96,0.0,138.6,59.6,43.0,19.4,14.0,0.0,202.56,281.56,,0.0,100m,0.0,,0.0,,201030400,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,283,第一章 电气设备工程 第三节 整修工程 四、明配钢管整修
- 283,283,284,1-284,钢管公称直径(mm) φ32~50,,0,63.89,0.0,187.44,80.6,43.0,26.24,14.0,0.0,251.33,358.17,,0.0,100m,0.0,,0.0,,201030400,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,284,第一章 电气设备工程 第三节 整修工程 四、明配钢管整修
- 284,284,285,1-285,钢管公称直径(mm) φ70~100,,0,80.68,0.0,313.72,134.9,43.0,43.92,14.0,0.0,394.4,573.22,,0.0,100m,0.0,,0.0,,201030400,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,285,第一章 电气设备工程 第三节 整修工程 四、明配钢管整修
- 285,285,286,1-286,塑料管公称直径(mm) φ15~25,,0,76.05,0.0,81.4,35.0,43.0,11.4,14.0,0.0,157.45,203.85,,0.0,100m,0.0,,0.0,,201030500,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,286,第一章 电气设备工程 第三节 整修工程 五、明配塑料管整修
- 286,286,287,1-287,塑料管公称直径(mm) φ32~50,,0,78.8,0.0,108.24,46.54,43.0,15.15,14.0,0.0,187.04,248.73,,0.0,100m,0.0,,0.0,,201030500,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,287,第一章 电气设备工程 第三节 整修工程 五、明配塑料管整修
- 287,287,288,1-288,塑料管公称直径(mm) φ70~100,,0,83.94,0.0,144.32,62.06,43.0,20.2,14.0,0.0,228.26,310.52,,0.0,100m,0.0,,0.0,,201030500,,,,,100,,0.0,,,线路整修、加换支持物、紧线、加固、拆换老化线段及锈蚀失灵器件、接焊包(压)头和排除各种隐患等。,,1.0,0,0.0,,,,288,第一章 电气设备工程 第三节 整修工程 五、明配塑料管整修
- 288,288,289,1-289,低压电动机解体检查、清洗 3kw,,0,99.6,0.0,528.0,227.04,43.0,73.92,14.0,0.0,627.6,928.56,,0.0,10台,0.0,,0.0,,201030600,,,,,10,,0.0,,,低压电动机解体检查、清洗及换轴承。,,1.0,0,0.0,,,,289,第一章 电气设备工程 第三节 整修工程 六、低压电动机解体检查、清洗及换轴承
- 289,289,290,1-290,低压电动机解体检查、清洗 10kw,,0,99.6,0.0,792.0,340.56,43.0,110.88,14.0,0.0,891.6,1343.04,,0.0,10台,0.0,,0.0,,201030600,,,,,10,,0.0,,,低压电动机解体检查、清洗及换轴承。,,1.0,0,0.0,,,,290,第一章 电气设备工程 第三节 整修工程 六、低压电动机解体检查、清洗及换轴承
- 290,290,291,1-291,低压电动机解体检查、清洗 20kw,,0,139.88,0.0,1056.0,454.08,43.0,147.84,14.0,0.0,1195.88,1797.8,,0.0,10台,0.0,,0.0,,201030600,,,,,10,,0.0,,,低压电动机解体检查、清洗及换轴承。,,1.0,0,0.0,,,,291,第一章 电气设备工程 第三节 整修工程 六、低压电动机解体检查、清洗及换轴承
- 291,291,292,1-292,低压电动机解体检查、清洗 40kw,,0,194.4,0.0,1601.6,688.69,43.0,224.22,14.0,0.0,1796.0,2708.91,,0.0,10台,0.0,,0.0,,201030600,,,,,10,,0.0,,,低压电动机解体检查、清洗及换轴承。,,1.0,0,0.0,,,,292,第一章 电气设备工程 第三节 整修工程 六、低压电动机解体检查、清洗及换轴承
- 292,292,293,1-293,低压电动机解体检查、清洗 75kw,,0,241.24,0.0,2640.0,1135.2,43.0,369.6,14.0,0.0,2881.24,4386.04,,0.0,10台,0.0,,0.0,,201030600,,,,,10,,0.0,,,低压电动机解体检查、清洗及换轴承。,,1.0,0,0.0,,,,293,第一章 电气设备工程 第三节 整修工程 六、低压电动机解体检查、清洗及换轴承
- 293,293,294,1-294,低压电动机解体检查、清洗 100kw,,0,276.2,0.0,3696.0,1589.28,43.0,517.44,14.0,0.0,3972.2,6078.92,,0.0,10台,0.0,,0.0,,201030600,,,,,10,,0.0,,,低压电动机解体检查、清洗及换轴承。,,1.0,0,0.0,,,,294,第一章 电气设备工程 第三节 整修工程 六、低压电动机解体检查、清洗及换轴承
- 294,294,295,1-295,电动机换轴承 10kw,,0,6.0,0.0,79.2,34.06,43.0,11.09,14.0,0.0,85.2,130.35,,0.0,10个,0.0,,0.0,,201030600,,,,,10,,0.0,,,低压电动机解体检查、清洗及换轴承。,,1.0,0,0.0,,,,295,第一章 电气设备工程 第三节 整修工程 六、低压电动机解体检查、清洗及换轴承
- 295,295,296,1-296,电动机换轴承 40kw,,0,6.0,0.0,158.4,68.11,43.0,22.18,14.0,0.0,164.4,254.69,,0.0,10个,0.0,,0.0,,201030600,,,,,10,,0.0,,,低压电动机解体检查、清洗及换轴承。,,1.0,0,0.0,,,,296,第一章 电气设备工程 第三节 整修工程 六、低压电动机解体检查、清洗及换轴承
- 296,296,297,1-297,排除线路故障,,0,0.5,0.0,11.0,4.73,43.0,1.54,14.0,0.0,11.5,17.77,,0.0,处,0.0,,0.0,,201030700,,,,,1,,0.0,,,检查、拆修、接线、包头。,,1.0,0,0.0,,,,297,第一章 电气设备工程 第三节 整修工程 七、修理照明线路、器具
- 297,297,298,1-298,疑难检修,,0,0.5,0.0,8.8,3.78,43.0,1.23,14.0,0.0,9.3,14.31,,0.0,处,0.0,,0.0,,201030700,,,,,1,,0.0,,,检查、拆修、接线、包头。,,1.0,0,0.0,,,,298,第一章 电气设备工程 第三节 整修工程 七、修理照明线路、器具
- 298,298,299,1-299,修换各种灯具部件,,0,0.2,0.0,4.4,1.89,43.0,0.62,14.0,0.0,4.6,7.11,,0.0,处,0.0,,0.0,,201030700,,,,,1,,0.0,,,检查、拆修、接线、包头。,,1.0,0,0.0,,,,299,第一章 电气设备工程 第三节 整修工程 七、修理照明线路、器具
- 299,299,300,2-1,室内外镀锌钢管拆除 公称直径(mm以内) 20,,0,0.0,0.0,21.56,9.27,43.0,3.02,14.0,0.0,21.56,33.85,,0.0,10m,0.0,,0.0,,202010101,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,300,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 1、室内外镀锌钢管拆除
- 300,300,301,2-2,室内外镀锌钢管拆除 公称直径(mm以内) 32,,0,0.0,0.0,24.2,10.41,43.0,3.39,14.0,0.0,24.2,38.0,,0.0,10m,0.0,,0.0,,202010101,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,301,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 1、室内外镀锌钢管拆除
- 301,301,302,2-3,室内外镀锌钢管拆除 公称直径(mm以内) 50,,0,0.0,0.0,28.6,12.3,43.0,4.0,14.0,0.0,28.6,44.9,,0.0,10m,0.0,,0.0,,202010101,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,302,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 1、室内外镀锌钢管拆除
- 302,302,303,2-4,室内外镀锌钢管拆除 公称直径(mm以内) 70,,0,0.0,0.0,29.04,12.49,43.0,4.07,14.0,0.0,29.04,45.6,,0.0,10m,0.0,,0.0,,202010101,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,303,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 1、室内外镀锌钢管拆除
- 303,303,304,2-5,室内外镀锌钢管拆除 公称直径(mm以内) 80,,0,0.0,0.0,29.48,12.68,43.0,4.13,14.0,0.0,29.48,46.29,,0.0,10m,0.0,,0.0,,202010101,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,304,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 1、室内外镀锌钢管拆除
- 304,304,305,2-6,室内外镀锌钢管拆除 公称直径(mm以内) 100,,0,0.0,0.0,35.64,15.33,43.0,4.99,14.0,0.0,35.64,55.96,,0.0,10m,0.0,,0.0,,202010101,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,305,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 1、室内外镀锌钢管拆除
- 305,305,306,2-7,室内外镀锌钢管拆除 公称直径(mm以内) 125,,0,19.27,0.0,39.6,17.03,43.0,5.54,14.0,0.0,58.87,81.44,,0.0,10m,0.0,,0.0,,202010101,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,306,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 1、室内外镀锌钢管拆除
- 306,306,307,2-8,室内外镀锌钢管拆除 公称直径(mm以内) 150,,0,19.27,0.0,43.56,18.73,43.0,6.1,14.0,0.0,62.83,87.66,,0.0,10m,0.0,,0.0,,202010101,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,307,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 1、室内外镀锌钢管拆除
- 307,307,308,2-9,室内外镀锌钢管拆除 公称直径(mm以内) 200,,0,27.34,0.0,82.28,35.38,43.0,11.52,14.0,0.0,109.62,156.52,,0.0,10m,0.0,,0.0,,202010101,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,308,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 1、室内外镀锌钢管拆除
- 308,308,309,2-10,室内外焊接钢管拆除 公称直径(mm以内) 20,,0,3.78,0.0,22.44,9.65,43.0,3.14,14.0,0.0,26.22,39.01,,0.0,10m,0.0,,0.0,,202010102,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,309,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 2、室内外焊接钢管拆除
- 309,309,310,2-11,室内外焊接钢管拆除 公称直径(mm以内) 32,,0,6.16,0.0,24.64,10.6,43.0,3.45,14.0,0.0,30.8,44.85,,0.0,10m,0.0,,0.0,,202010102,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,310,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 2、室内外焊接钢管拆除
- 310,310,311,2-12,室内外焊接钢管拆除 公称直径(mm以内) 50,,0,6.16,0.0,28.6,12.3,43.0,4.0,14.0,0.0,34.76,51.06,,0.0,10m,0.0,,0.0,,202010102,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,311,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 2、室内外焊接钢管拆除
- 311,311,312,2-13,室内外焊接钢管拆除 公称直径(mm以内) 70,,0,10.08,0.0,28.6,12.3,43.0,4.0,14.0,0.0,38.68,54.98,,0.0,10m,0.0,,0.0,,202010102,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,312,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 2、室内外焊接钢管拆除
- 312,312,313,2-14,室内外焊接钢管拆除 公称直径(mm以内) 80,,0,10.08,0.0,29.48,12.68,43.0,4.13,14.0,0.0,39.56,56.37,,0.0,10m,0.0,,0.0,,202010102,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,313,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 2、室内外焊接钢管拆除
- 313,313,314,2-15,室内外焊接钢管拆除 公称直径(mm以内) 100,,0,10.08,0.0,35.64,15.33,43.0,4.99,14.0,0.0,45.72,66.04,,0.0,10m,0.0,,0.0,,202010102,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,314,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 2、室内外焊接钢管拆除
- 314,314,315,2-16,室内外焊接钢管拆除 公称直径(mm以内) 125,,0,19.27,0.0,39.6,17.03,43.0,5.54,14.0,0.0,58.87,81.44,,0.0,10m,0.0,,0.0,,202010102,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,315,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 2、室内外焊接钢管拆除
- 315,315,316,2-17,室内外焊接钢管拆除 公称直径(mm以内) 150,,0,20.7,0.0,43.56,18.73,43.0,6.1,14.0,0.0,64.26,89.09,,0.0,10m,0.0,,0.0,,202010102,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,316,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 2、室内外焊接钢管拆除
- 316,316,317,2-18,室内外焊接钢管拆除 公称直径(mm以内) 200,,0,27.34,0.0,82.28,35.38,43.0,11.52,14.0,0.0,109.62,156.52,,0.0,10m,0.0,,0.0,,202010102,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,317,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 2、室内外焊接钢管拆除
- 317,317,318,2-19,暗装镀锌管道拆除 公称直径(mm以内) 25,,0,2.78,0.0,22.0,9.46,43.0,3.08,14.0,0.0,24.78,37.32,,0.0,10m,0.0,,0.0,,202010103,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,318,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 3、暗装镀锌管道拆除
- 318,318,319,2-20,暗装镀锌管道拆除 公称直径(mm以内) 50,,0,4.16,0.0,30.8,13.24,43.0,4.31,14.0,0.0,34.96,52.51,,0.0,10m,0.0,,0.0,,202010103,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,319,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 3、暗装镀锌管道拆除
- 319,319,320,2-21,暗装镀锌管道拆除 公称直径(mm以内) 100,,0,8.08,0.0,52.8,22.7,43.0,7.39,14.0,0.0,60.88,90.97,,0.0,10m,0.0,,0.0,,202010103,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,320,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 3、暗装镀锌管道拆除
- 320,320,321,2-22,暗装镀锌管道拆除 公称直径(mm以内) 150,,0,14.27,0.0,88.0,37.84,43.0,12.32,14.0,0.0,102.27,152.43,,0.0,10m,0.0,,0.0,,202010103,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,321,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 3、暗装镀锌管道拆除
- 321,321,322,2-23,暗装镀锌管道拆除 公称直径(mm以内) 200,,0,22.34,0.0,154.0,66.22,43.0,21.56,14.0,0.0,176.34,264.12,,0.0,10m,0.0,,0.0,,202010103,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,322,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 3、暗装镀锌管道拆除
- 322,322,323,2-24,暗装铸铁管道拆除 公称直径(mm以内) 75,,0,9.12,0.0,66.0,28.38,43.0,9.24,14.0,0.0,75.12,112.74,,0.0,10m,0.0,,0.0,,202010104,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,323,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 4、暗装铸铁管道拆除
- 323,323,324,2-25,暗装铸铁管道拆除 公称直径(mm以内) 100,,0,13.93,0.0,96.8,41.62,43.0,13.55,14.0,0.0,110.73,165.9,,0.0,10m,0.0,,0.0,,202010104,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,324,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 4、暗装铸铁管道拆除
- 324,324,325,2-26,暗装铸铁管道拆除 公称直径(mm以内) 125,,0,16.45,0.0,154.0,66.22,43.0,21.56,14.0,0.0,170.45,258.23,,0.0,10m,0.0,,0.0,,202010104,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,325,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 4、暗装铸铁管道拆除
- 325,325,326,2-27,暗装铸铁管道拆除 公称直径(mm以内) 150,,0,18.49,0.0,211.2,90.82,43.0,29.57,14.0,0.0,229.69,350.08,,0.0,10m,0.0,,0.0,,202010104,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,326,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 4、暗装铸铁管道拆除
- 326,326,327,2-28,暗装铸铁管道拆除 公称直径(mm以内) 200,,0,33.31,0.0,250.8,107.84,43.0,35.11,14.0,0.0,284.11,427.06,,0.0,10m,0.0,,0.0,,202010104,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,327,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 4、暗装铸铁管道拆除
- 327,327,328,2-29,铸铁排水管拆除 公称直径(mm以内) 50,,0,0.0,0.0,52.8,22.7,43.0,7.39,14.0,0.0,52.8,82.89,,0.0,10m,0.0,,0.0,,202010105,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,328,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 5、铸铁排水管拆除
- 328,328,329,2-30,铸铁排水管拆除 公称直径(mm以内) 75,,0,0.0,0.0,66.0,28.38,43.0,9.24,14.0,0.0,66.0,103.62,,0.0,10m,0.0,,0.0,,202010105,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,329,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 5、铸铁排水管拆除
- 329,329,330,2-31,铸铁排水管拆除 公称直径(mm以内) 100,,0,0.0,0.0,88.0,37.84,43.0,12.32,14.0,0.0,88.0,138.16,,0.0,10m,0.0,,0.0,,202010105,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,330,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 5、铸铁排水管拆除
- 330,330,331,2-32,铸铁排水管拆除 公称直径(mm以内) 150,,0,0.0,0.0,110.0,47.3,43.0,15.4,14.0,0.0,110.0,172.7,,0.0,10m,0.0,,0.0,,202010105,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,331,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 5、铸铁排水管拆除
- 331,331,332,2-33,铸铁排水管拆除 公称直径(mm以内) 200,,0,0.0,0.0,132.0,56.76,43.0,18.48,14.0,0.0,132.0,207.24,,0.0,10m,0.0,,0.0,,202010105,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,332,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 5、铸铁排水管拆除
- 332,332,333,2-34,室内外PVC塑料排水管拆除 公称直径(mm以内) 50,,0,0.0,0.0,17.16,7.38,43.0,2.4,14.0,0.0,17.16,26.94,,0.0,10m,0.0,,0.0,,202010106,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,333,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 6、室内外PVC塑料排水管拆除
- 333,333,334,2-35,室内外PVC塑料排水管拆除 公称直径(mm以内) 75,,0,0.0,0.0,20.24,8.7,43.0,2.83,14.0,0.0,20.24,31.77,,0.0,10m,0.0,,0.0,,202010106,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,334,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 6、室内外PVC塑料排水管拆除
- 334,334,335,2-36,室内外PVC塑料排水管拆除 公称直径(mm以内) 100,,0,0.0,0.0,23.76,10.22,43.0,3.33,14.0,0.0,23.76,37.31,,0.0,10m,0.0,,0.0,,202010106,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,335,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 6、室内外PVC塑料排水管拆除
- 335,335,336,2-37,室内外PVC塑料排水管拆除 公称直径(mm以内) 150,,0,0.0,0.0,30.8,13.24,43.0,4.31,14.0,0.0,30.8,48.35,,0.0,10m,0.0,,0.0,,202010106,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,336,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 6、室内外PVC塑料排水管拆除
- 336,336,337,2-38,室内外PVC塑料排水管拆除 公称直径(mm以内) 200,,0,0.0,0.0,39.6,17.03,43.0,5.54,14.0,0.0,39.6,62.17,,0.0,10m,0.0,,0.0,,202010106,,,,,10,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,337,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 一、管道拆除 6、室内外PVC塑料排水管拆除
- 337,337,338,2-39,螺纹阀门拆除 公称直径(mm以内) 20,,0,0.0,0.0,2.2,0.95,43.0,0.31,14.0,0.0,2.2,3.46,,0.0,个,0.0,,0.0,,202010201,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,338,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 1、螺纹阀门拆除
- 338,338,339,2-40,螺纹阀门拆除 公称直径(mm以内) 25,,0,0.0,0.0,3.08,1.32,43.0,0.43,14.0,0.0,3.08,4.83,,0.0,个,0.0,,0.0,,202010201,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,339,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 1、螺纹阀门拆除
- 339,339,340,2-41,螺纹阀门拆除 公称直径(mm以内) 32,,0,0.0,0.0,3.96,1.7,43.0,0.55,14.0,0.0,3.96,6.21,,0.0,个,0.0,,0.0,,202010201,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,340,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 1、螺纹阀门拆除
- 340,340,341,2-42,螺纹阀门拆除 公称直径(mm以内) 40,,0,0.0,0.0,4.84,2.08,43.0,0.68,14.0,0.0,4.84,7.6,,0.0,个,0.0,,0.0,,202010201,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,341,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 1、螺纹阀门拆除
- 341,341,342,2-43,螺纹阀门拆除 公称直径(mm以内) 50,,0,0.0,0.0,7.48,3.22,43.0,1.05,14.0,0.0,7.48,11.75,,0.0,个,0.0,,0.0,,202010201,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,342,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 1、螺纹阀门拆除
- 342,342,343,2-44,螺纹水表拆除 公称直径(mm以内) 25,,0,0.0,0.0,2.64,1.14,43.0,0.37,14.0,0.0,2.64,4.15,,0.0,个,0.0,,0.0,,202010202,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,343,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 2、螺纹水表拆除
- 343,343,344,2-45,螺纹水表拆除 公称直径(mm以内) 50,,0,0.0,0.0,5.28,2.27,43.0,0.74,14.0,0.0,5.28,8.29,,0.0,个,0.0,,0.0,,202010202,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,344,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 2、螺纹水表拆除
- 344,344,345,2-46,丝扣法兰拆除 公称直径(mm以内) 25,,0,0.0,0.0,2.2,0.95,43.0,0.31,14.0,0.0,2.2,3.46,,0.0,付,0.0,,0.0,,202010203,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,345,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 3、丝扣法兰拆除
- 345,345,346,2-47,丝扣法兰拆除 公称直径(mm以内) 50,,0,0.0,0.0,5.28,2.27,43.0,0.74,14.0,0.0,5.28,8.29,,0.0,付,0.0,,0.0,,202010203,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,346,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 3、丝扣法兰拆除
- 346,346,347,2-48,丝扣法兰拆除 公称直径(mm以内) 100,,0,0.0,0.0,14.08,6.05,43.0,1.97,14.0,0.0,14.08,22.1,,0.0,付,0.0,,0.0,,202010203,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,347,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 3、丝扣法兰拆除
- 347,347,348,2-49,法兰阀门拆除 公称直径(mm以内) 50,,0,0.8,0.0,8.8,3.78,43.0,1.23,14.0,0.0,9.6,14.61,,0.0,个,0.0,,0.0,,202010204,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,348,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 4、法兰阀门拆除
- 348,348,349,2-50,法兰阀门拆除 公称直径(mm以内) 80,,0,0.8,0.0,16.28,7.0,43.0,2.28,14.0,0.0,17.08,26.36,,0.0,个,0.0,,0.0,,202010204,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,349,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 4、法兰阀门拆除
- 349,349,350,2-51,法兰阀门拆除 公称直径(mm以内) 150,,0,0.8,0.0,25.96,11.16,43.0,3.63,14.0,0.0,26.76,41.55,,0.0,个,0.0,,0.0,,202010204,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,350,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 4、法兰阀门拆除
- 350,350,351,2-52,法兰阀门拆除 公称直径(mm以内) 250,,0,1.0,0.0,61.6,26.49,43.0,8.62,14.0,0.0,62.6,97.71,,0.0,个,0.0,,0.0,,202010204,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,351,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 4、法兰阀门拆除
- 351,351,352,2-53,法兰阀门拆除 公称直径(mm以内) 400,,0,1.0,0.0,96.8,41.62,43.0,13.55,14.0,0.0,97.8,152.97,,0.0,个,0.0,,0.0,,202010204,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,352,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 4、法兰阀门拆除
- 352,352,353,2-54,疏水器拆除 管径(mm以内) 32,,0,1.0,0.0,14.96,6.43,43.0,2.09,14.0,0.0,15.96,24.48,,0.0,组,0.0,,0.0,,202010205,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,353,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 5、疏水器拆除
- 353,353,354,2-55,疏水器拆除 管径(mm以内) 50,,0,1.0,0.0,26.4,11.35,43.0,3.7,14.0,0.0,27.4,42.45,,0.0,组,0.0,,0.0,,202010205,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,354,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 5、疏水器拆除
- 354,354,355,2-56,减压器拆除 管径(mm以内) 50,,0,1.0,0.0,38.28,16.46,43.0,5.36,14.0,0.0,39.28,61.1,,0.0,组,0.0,,0.0,,202010206,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,355,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 6、减压器拆除
- 355,355,356,2-57,减压器拆除 管径(mm以内) 80,,0,1.0,0.0,72.6,31.22,43.0,10.16,14.0,0.0,73.6,114.98,,0.0,组,0.0,,0.0,,202010206,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,356,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 6、减压器拆除
- 356,356,357,2-58,减压器拆除 管径(mm以内) 125,,0,1.0,0.0,132.88,57.14,43.0,18.6,14.0,0.0,133.88,209.62,,0.0,组,0.0,,0.0,,202010206,,,,,1,,0.0,,,按序拆除、分类归堆、验收退库。,,1.0,0,0.0,,,,357,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 6、减压器拆除
- 357,357,358,2-59,铁壳铜芯水嘴拆除 公称直径(mm以内) 15,,0,0.0,0.0,30.8,13.24,43.0,4.31,14.0,0.0,30.8,48.35,,0.0,10个,0.0,,0.0,,202010207,,,,,10,,0.0,,,拆除、退库。,,1.0,0,0.0,,,,358,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 7、铁壳铜芯水嘴拆除
- 358,358,359,2-60,铁壳铜芯水嘴拆除 公称直径(mm以内) 20,,0,0.0,0.0,30.8,13.24,43.0,4.31,14.0,0.0,30.8,48.35,,0.0,10个,0.0,,0.0,,202010207,,,,,10,,0.0,,,拆除、退库。,,1.0,0,0.0,,,,359,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 7、铁壳铜芯水嘴拆除
- 359,359,360,2-61,铁壳铜芯水嘴拆除 公称直径(mm以内) 25,,0,0.0,0.0,30.8,13.24,43.0,4.31,14.0,0.0,30.8,48.35,,0.0,10个,0.0,,0.0,,202010207,,,,,10,,0.0,,,拆除、退库。,,1.0,0,0.0,,,,360,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 二、阀门、低压器具拆除 7、铁壳铜芯水嘴拆除
- 360,360,361,2-62,浴盆拆除 拆除冷水,,0,0.0,0.0,264.0,113.52,43.0,36.96,14.0,0.0,264.0,414.48,,0.0,10组,0.0,,0.0,,202010301,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,361,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 1、浴盆拆除
- 361,361,362,2-63,浴盆拆除 拆除冷热水,,0,0.0,0.0,308.0,132.44,43.0,43.12,14.0,0.0,308.0,483.56,,0.0,10组,0.0,,0.0,,202010301,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,362,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 1、浴盆拆除
- 362,362,363,2-64,浴盆拆除 拆除冷热水带喷头,,0,0.0,0.0,440.0,189.2,43.0,61.6,14.0,0.0,440.0,690.8,,0.0,10组,0.0,,0.0,,202010301,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,363,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 1、浴盆拆除
- 363,363,364,2-65,淋浴器拆除 钢管制品 冷水,,0,0.0,0.0,74.8,32.16,43.0,10.47,14.0,0.0,74.8,117.43,,0.0,10套,0.0,,0.0,,202010302,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,364,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 2、淋浴器拆除
- 364,364,365,2-66,淋浴器拆除 钢管制品 冷热水,,0,0.0,0.0,180.4,77.57,43.0,25.26,14.0,0.0,180.4,283.23,,0.0,10套,0.0,,0.0,,202010302,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,365,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 2、淋浴器拆除
- 365,365,366,2-67,淋浴器拆除 铜管制品 冷热水,,0,0.0,0.0,61.6,26.49,43.0,8.62,14.0,0.0,61.6,96.71,,0.0,10套,0.0,,0.0,,202010302,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,366,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 2、淋浴器拆除
- 366,366,367,2-68,面盆拆除 普通冷水嘴,,0,0.0,0.0,154.0,66.22,43.0,21.56,14.0,0.0,154.0,241.78,,0.0,10组,0.0,,0.0,,202010303,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,367,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 3、面盆拆除
- 367,367,368,2-69,面盆拆除 钢管组成冷热水,,0,0.0,0.0,211.2,90.82,43.0,29.57,14.0,0.0,211.2,331.59,,0.0,10组,0.0,,0.0,,202010303,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,368,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 3、面盆拆除
- 368,368,369,2-70,面盆拆除 铜管组成冷热水,,0,0.0,0.0,171.6,73.79,43.0,24.02,14.0,0.0,171.6,269.41,,0.0,10组,0.0,,0.0,,202010303,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,369,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 3、面盆拆除
- 369,369,370,2-71,面盆拆除 立式冷热水,,0,0.0,0.0,264.0,113.52,43.0,36.96,14.0,0.0,264.0,414.48,,0.0,10组,0.0,,0.0,,202010303,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,370,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 3、面盆拆除
- 370,370,371,2-72,面盆拆除 肘式开关,,0,0.0,0.0,206.8,88.92,43.0,28.95,14.0,0.0,206.8,324.67,,0.0,10组,0.0,,0.0,,202010303,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,371,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 3、面盆拆除
- 371,371,372,2-73,面盆拆除 脚踏开关,,0,0.0,0.0,206.8,88.92,43.0,28.95,14.0,0.0,206.8,324.67,,0.0,10组,0.0,,0.0,,202010303,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,372,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 3、面盆拆除
- 372,372,373,2-74,洗涤盆拆除 单嘴,,0,0.0,0.0,140.8,60.54,43.0,19.71,14.0,0.0,140.8,221.05,,0.0,10组,0.0,,0.0,,202010303,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,373,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 3、面盆拆除
- 373,373,374,2-75,洗涤盆拆除 脚踏开关,,0,0.0,0.0,162.8,70.0,43.0,22.79,14.0,0.0,162.8,255.59,,0.0,10组,0.0,,0.0,,202010303,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,374,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 3、面盆拆除
- 374,374,375,2-76,坐式大便器,,0,0.0,0.0,92.4,39.73,43.0,12.94,14.0,0.0,92.4,145.07,,0.0,10个,0.0,,0.0,,202010304,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,375,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 4、大便器拆除
- 375,375,376,2-77,蹲式大便器,,0,0.0,0.0,246.4,105.95,43.0,34.5,14.0,0.0,246.4,386.85,,0.0,10个,0.0,,0.0,,202010304,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,376,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 4、大便器拆除
- 376,376,377,2-78,大便器水箱(高低水箱通用),,0,0.0,0.0,110.0,47.3,43.0,15.4,14.0,0.0,110.0,172.7,,0.0,10个,0.0,,0.0,,202010304,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,377,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 4、大便器拆除
- 377,377,378,2-79,挂式小便器,,0,0.0,0.0,66.0,28.38,43.0,9.24,14.0,0.0,66.0,103.62,,0.0,10组,0.0,,0.0,,202010305,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,378,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 5、小便器拆除
- 378,378,379,2-80,立式小便器,,0,0.0,0.0,105.6,45.41,43.0,14.78,14.0,0.0,105.6,165.79,,0.0,10组,0.0,,0.0,,202010305,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,379,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 5、小便器拆除
- 379,379,380,2-81,地漏拆除 50,,0,0.0,0.0,35.2,15.14,43.0,4.93,14.0,0.0,35.2,55.27,,0.0,10个,0.0,,0.0,,202010306,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,380,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 6、地漏拆除
- 380,380,381,2-82,地漏拆除 100,,0,0.0,0.0,79.2,34.06,43.0,11.09,14.0,0.0,79.2,124.35,,0.0,10个,0.0,,0.0,,202010306,,,,,10,,0.0,,,按序拆除、分类归堆、退库。,,1.0,0,0.0,,,,381,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 6、地漏拆除
- 381,381,382,2-83,排水栓(不带存水弯) 公称直径(mm以内) 40,,0,1.08,0.0,45.32,19.49,43.0,6.34,14.0,0.0,46.4,72.23,,0.0,10组,0.0,,0.0,,202010307,,,,,10,,0.0,,,拆排水管、堵链、存水弯等零配件。,,1.0,0,0.0,,,,382,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 7、排水栓拆除
- 382,382,383,2-84,排水栓(不带存水弯) 公称直径(mm以内) 50,,0,1.1,0.0,45.76,19.68,43.0,6.41,14.0,0.0,46.86,72.95,,0.0,10组,0.0,,0.0,,202010307,,,,,10,,0.0,,,拆排水管、堵链、存水弯等零配件。,,1.0,0,0.0,,,,383,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 7、排水栓拆除
- 383,383,384,2-85,排水栓(不带存水弯) 公称直径(mm以内) 75,,0,1.12,0.0,50.16,21.57,43.0,7.02,14.0,0.0,51.28,79.87,,0.0,10组,0.0,,0.0,,202010307,,,,,10,,0.0,,,拆排水管、堵链、存水弯等零配件。,,1.0,0,0.0,,,,384,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 7、排水栓拆除
- 384,384,385,2-86,排水栓(带存水弯) 公称直径(mm以内) 40,,0,0.51,0.0,130.24,56.0,43.0,18.23,14.0,0.0,130.75,204.98,,0.0,10组,0.0,,0.0,,202010307,,,,,10,,0.0,,,拆排水管、堵链、存水弯等零配件。,,1.0,0,0.0,,,,385,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 7、排水栓拆除
- 385,385,386,2-87,排水栓(带存水弯) 公称直径(mm以内) 50,,0,0.53,0.0,130.24,56.0,43.0,18.23,14.0,0.0,130.77,205.0,,0.0,10组,0.0,,0.0,,202010307,,,,,10,,0.0,,,拆排水管、堵链、存水弯等零配件。,,1.0,0,0.0,,,,386,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 7、排水栓拆除
- 386,386,387,2-88,排水栓(带存水弯) 公称直径(mm以内) 75,,0,0.55,0.0,143.44,61.68,43.0,20.08,14.0,0.0,143.99,225.75,,0.0,10组,0.0,,0.0,,202010307,,,,,10,,0.0,,,拆排水管、堵链、存水弯等零配件。,,1.0,0,0.0,,,,387,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 7、排水栓拆除
- 387,387,388,2-89,地面扫除口 公称直径(mm以内) 50,,0,0.39,0.0,17.16,7.38,43.0,2.4,14.0,0.0,17.55,27.33,,0.0,10组,0.0,,0.0,,202010307,,,,,10,,0.0,,,拆除扫除口及零配件。,,1.0,0,0.0,,,,388,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 7、排水栓拆除
- 388,388,389,2-90,地面扫除口 公称直径(mm以内) 100,,0,0.49,0.0,22.44,9.65,43.0,3.14,14.0,0.0,22.93,35.72,,0.0,10组,0.0,,0.0,,202010307,,,,,10,,0.0,,,拆除扫除口及零配件。,,1.0,0,0.0,,,,389,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 7、排水栓拆除
- 389,389,390,2-91,地面扫除口 公称直径(mm以内) 150,,0,0.59,0.0,27.72,11.92,43.0,3.88,14.0,0.0,28.31,44.11,,0.0,10组,0.0,,0.0,,202010307,,,,,10,,0.0,,,拆除扫除口及零配件。,,1.0,0,0.0,,,,390,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 7、排水栓拆除
- 390,390,391,2-92,整组柱型散热器 15片内,,0,0.14,0.0,6.16,2.65,43.0,0.86,14.0,0.0,6.3,9.81,,0.0,组,0.0,,0.0,,202010308,,,,,1,,0.0,,,按序拆除、场内搬运、分类归堆、退库。,,1.0,0,0.0,,,,391,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 8、散热器拆除
- 391,391,392,2-93,整组柱型散热器 30片内,,0,0.14,0.0,9.24,3.97,43.0,1.29,14.0,0.0,9.38,14.64,,0.0,组,0.0,,0.0,,202010308,,,,,1,,0.0,,,按序拆除、场内搬运、分类归堆、退库。,,1.0,0,0.0,,,,392,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 8、散热器拆除
- 392,392,393,2-94,整组长翼型散热器 1-3片,,0,0.14,0.0,8.8,3.78,43.0,1.23,14.0,0.0,8.94,13.95,,0.0,组,0.0,,0.0,,202010308,,,,,1,,0.0,,,按序拆除、场内搬运、分类归堆、退库。,,1.0,0,0.0,,,,393,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 8、散热器拆除
- 393,393,394,2-95,整组长翼型散热器 4-6片,,0,0.14,0.0,14.08,6.05,43.0,1.97,14.0,0.0,14.22,22.24,,0.0,组,0.0,,0.0,,202010308,,,,,1,,0.0,,,按序拆除、场内搬运、分类归堆、退库。,,1.0,0,0.0,,,,394,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 8、散热器拆除
- 394,394,395,2-96,整组圆翼型散热器 1-3根,,0,0.14,0.0,7.92,3.41,43.0,1.11,14.0,0.0,8.06,12.58,,0.0,组,0.0,,0.0,,202010308,,,,,1,,0.0,,,泄水、拆活接头、剔落卡子、托架、堵堵、场内搬运、分类归堆、退库。,,1.0,0,0.0,,,,395,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 8、散热器拆除
- 395,395,396,2-97,整组圆翼型散热器 4-6根,,0,0.14,0.0,12.76,5.49,43.0,1.79,14.0,0.0,12.9,20.18,,0.0,组,0.0,,0.0,,202010308,,,,,1,,0.0,,,泄水、拆活接头、剔落卡子、托架、堵堵、场内搬运、分类归堆、退库。,,1.0,0,0.0,,,,396,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 8、散热器拆除
- 396,396,397,2-98,整组钢制散热器,,0,0.14,0.0,4.4,1.89,43.0,0.62,14.0,0.0,4.54,7.05,,0.0,组,0.0,,0.0,,202010308,,,,,1,,0.0,,,泄水、拆活接头、剔落卡子、托架、堵堵、场内搬运、分类归堆、退库。,,1.0,0,0.0,,,,397,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 8、散热器拆除
- 397,397,398,2-99,柱型、132型、长翼型散热器,,0,0.14,0.0,4.4,1.89,43.0,0.62,14.0,0.0,4.54,7.05,,0.0,片,0.0,,0.0,,202010308,,,,,1,,0.0,,,按序拆除、场内搬运、分类归堆、退库。,,1.0,0,0.0,,,,398,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 8、散热器拆除
- 398,398,399,2-100,圆翼型散热器,,0,0.14,0.0,3.96,1.7,43.0,0.55,14.0,0.0,4.1,6.35,,0.0,根,0.0,,0.0,,202010308,,,,,1,,0.0,,,按序拆除、场内搬运、分类归堆、退库。,,1.0,0,0.0,,,,399,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 8、散热器拆除
- 399,399,400,2-101,组装式钢制散热器,,0,0.11,0.0,3.08,1.32,43.0,0.43,14.0,0.0,3.19,4.94,,0.0,根,0.0,,0.0,,202010308,,,,,1,,0.0,,,按序拆除、场内搬运、分类归堆、退库。,,1.0,0,0.0,,,,400,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 三、卫生器具拆除 8、散热器拆除
- 400,400,401,2-102,单级离心泵及耐腐蚀泵拆除 设备重量(t以内) 0.2,,0,4.39,0.0,62.48,26.87,43.0,8.75,14.0,0.0,66.87,102.49,,0.0,台,0.0,,0.0,,202010401,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,401,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 1、单级离心泵及耐腐蚀泵拆除
- 401,401,402,2-103,单级离心泵及耐腐蚀泵拆除 设备重量(t以内) 0.5,,0,8.4,19.29,117.04,50.33,43.0,16.39,14.0,0.0,144.73,211.45,,0.0,台,0.0,,0.0,,202010401,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,402,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 1、单级离心泵及耐腐蚀泵拆除
- 402,402,403,2-104,单级离心泵及耐腐蚀泵拆除 设备重量(t以内) 1,,0,8.92,38.58,183.92,79.09,43.0,25.75,14.0,0.0,231.42,336.26,,0.0,台,0.0,,0.0,,202010401,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,403,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 1、单级离心泵及耐腐蚀泵拆除
- 403,403,404,2-105,单级离心泵及耐腐蚀泵拆除 设备重量(t以内) 3,,0,14.06,57.88,355.08,152.68,43.0,49.71,14.0,0.0,427.02,629.41,,0.0,台,0.0,,0.0,,202010401,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,404,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 1、单级离心泵及耐腐蚀泵拆除
- 404,404,405,2-106,单级离心泵及耐腐蚀泵拆除 设备重量(t以内) 5,,0,15.74,61.47,499.84,214.93,43.0,69.98,14.0,0.0,577.05,861.96,,0.0,台,0.0,,0.0,,202010401,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,405,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 1、单级离心泵及耐腐蚀泵拆除
- 405,405,406,2-107,单级离心泵及耐腐蚀泵拆除 设备重量(t以内) 8,,0,22.59,81.96,764.72,328.83,43.0,107.06,14.0,0.0,869.27,1305.16,,0.0,台,0.0,,0.0,,202010401,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,406,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 1、单级离心泵及耐腐蚀泵拆除
- 406,406,407,2-108,多级离心泵拆除 设备重量(t以内) 0.5,,0,7.95,19.29,153.12,65.84,43.0,21.44,14.0,0.0,180.36,267.64,,0.0,台,0.0,,0.0,,202010402,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,407,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 2、多级离心泵拆除
- 407,407,408,2-109,多级离心泵拆除 设备重量(t以内) 1,,0,8.87,38.58,210.76,90.63,43.0,29.51,14.0,0.0,258.21,378.35,,0.0,台,0.0,,0.0,,202010402,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,408,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 2、多级离心泵拆除
- 408,408,409,2-110,多级离心泵拆除 设备重量(t以内) 2,,0,11.25,38.58,343.64,147.77,43.0,48.11,14.0,0.0,393.47,589.35,,0.0,台,0.0,,0.0,,202010402,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,409,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 2、多级离心泵拆除
- 409,409,410,2-111,多级离心泵拆除 设备重量(t以内) 3,,0,16.15,57.88,459.36,197.52,43.0,64.31,14.0,0.0,533.39,795.22,,0.0,台,0.0,,0.0,,202010402,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,410,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 2、多级离心泵拆除
- 410,410,411,2-112,多级离心泵拆除 设备重量(t以内) 4,,0,16.3,61.47,527.56,226.85,43.0,73.86,14.0,0.0,605.33,906.04,,0.0,台,0.0,,0.0,,202010402,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,411,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 2、多级离心泵拆除
- 411,411,412,2-113,多级离心泵拆除 设备重量(t以内) 5,,0,16.39,61.47,759.0,326.37,43.0,106.26,14.0,0.0,836.86,1269.49,,0.0,台,0.0,,0.0,,202010402,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,412,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 2、多级离心泵拆除
- 412,412,413,2-114,多级离心泵拆除 设备重量(t以内) 6,,0,22.71,77.86,759.0,326.37,43.0,106.26,14.0,0.0,859.57,1292.2,,0.0,台,0.0,,0.0,,202010402,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,413,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 2、多级离心泵拆除
- 413,413,414,2-115,锅炉给水泵、冷凝水泵、热水循环泵拆除 设备重量(t以内) 0.5,,0,8.84,19.29,154.44,66.41,43.0,21.62,14.0,0.0,182.57,270.6,,0.0,台,0.0,,0.0,,202010403,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,414,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 3、锅炉给水泵、冷凝水泵、热水循环泵拆除
- 414,414,415,2-116,锅炉给水泵、冷凝水泵、热水循环泵拆除 设备重量(t以内) 1,,0,10.16,38.58,216.92,93.28,43.0,30.37,14.0,0.0,265.66,389.31,,0.0,台,0.0,,0.0,,202010403,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,415,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 3、锅炉给水泵、冷凝水泵、热水循环泵拆除
- 415,415,416,2-117,锅炉给水泵、冷凝水泵、热水循环泵拆除 设备重量(t以内) 2,,0,11.3,38.58,368.28,158.36,43.0,51.56,14.0,0.0,418.16,628.08,,0.0,台,0.0,,0.0,,202010403,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,416,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 3、锅炉给水泵、冷凝水泵、热水循环泵拆除
- 416,416,417,2-118,锅炉给水泵、冷凝水泵、热水循环泵拆除 设备重量(t以内) 3.5,,0,15.67,61.47,460.24,197.9,43.0,64.43,14.0,0.0,537.38,799.71,,0.0,台,0.0,,0.0,,202010403,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,417,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 3、锅炉给水泵、冷凝水泵、热水循环泵拆除
- 417,417,418,2-119,锅炉给水泵、冷凝水泵、热水循环泵拆除 设备重量(t以内) 5,,0,17.81,61.47,583.0,250.69,43.0,81.62,14.0,0.0,662.28,994.59,,0.0,台,0.0,,0.0,,202010403,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,418,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 3、锅炉给水泵、冷凝水泵、热水循环泵拆除
- 418,418,419,2-120,锅炉给水泵、冷凝水泵、热水循环泵拆除 设备重量(t以内) 7,,0,22.11,61.47,702.68,302.15,43.0,98.38,14.0,0.0,786.26,1186.79,,0.0,台,0.0,,0.0,,202010403,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,419,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 3、锅炉给水泵、冷凝水泵、热水循环泵拆除
- 419,419,420,2-121,离心式杂质泵拆除 设备重量(t以内) 0.5,,0,8.43,19.29,149.16,64.14,43.0,20.88,14.0,0.0,176.88,261.9,,0.0,台,0.0,,0.0,,202010404,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,420,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 4、离心式杂质泵拆除
- 420,420,421,2-122,离心式杂质泵拆除 设备重量(t以内) 1,,0,9.53,38.58,223.96,96.3,43.0,31.35,14.0,0.0,272.07,399.72,,0.0,台,0.0,,0.0,,202010404,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,421,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 4、离心式杂质泵拆除
- 421,421,422,2-123,离心式杂质泵拆除 设备重量(t以内) 2,,0,11.95,38.58,368.72,158.55,43.0,51.62,14.0,0.0,419.25,629.42,,0.0,台,0.0,,0.0,,202010404,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,422,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 4、离心式杂质泵拆除
- 422,422,423,2-124,离心式杂质泵拆除 设备重量(t以内) 5,,0,21.67,57.88,623.04,267.91,43.0,87.23,14.0,0.0,702.59,1057.73,,0.0,台,0.0,,0.0,,202010404,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,423,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 4、离心式杂质泵拆除
- 423,423,424,2-125,离心式杂质泵拆除 设备重量(t以内) 10,,0,30.54,86.81,1004.52,431.94,43.0,140.63,14.0,0.0,1121.87,1694.44,,0.0,台,0.0,,0.0,,202010404,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,424,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 4、离心式杂质泵拆除
- 424,424,425,2-126,离心式杂质泵拆除 设备重量(t以内) 15,,0,61.64,96.46,1814.12,780.07,43.0,253.98,14.0,0.0,1972.22,3006.27,,0.0,台,0.0,,0.0,,202010404,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,425,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 4、离心式杂质泵拆除
- 425,425,426,2-127,离心式深水泵拆除 设备重量(t以内) 1,,0,11.36,38.58,573.32,246.53,43.0,80.26,14.0,0.0,623.26,950.05,,0.0,台,0.0,,0.0,,202010405,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,426,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 5、离心式深水泵拆除
- 426,426,427,2-128,离心式深水泵拆除 设备重量(t以内) 2,,0,11.65,38.58,661.32,284.37,43.0,92.58,14.0,0.0,711.55,1088.5,,0.0,台,0.0,,0.0,,202010405,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,427,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 5、离心式深水泵拆除
- 427,427,428,2-129,离心式深水泵拆除 设备重量(t以内) 3.5,,0,17.11,57.88,975.92,419.65,43.0,136.63,14.0,0.0,1050.91,1607.19,,0.0,台,0.0,,0.0,,202010405,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,428,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 5、离心式深水泵拆除
- 428,428,429,2-130,离心式深水泵拆除 设备重量(t以内) 5.5,,0,24.54,61.47,1228.04,528.06,43.0,171.93,14.0,0.0,1314.05,2014.04,,0.0,台,0.0,,0.0,,202010405,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,429,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 5、离心式深水泵拆除
- 429,429,430,2-131,离心式深水泵拆除 设备重量(t以内) 8,,0,33.89,81.96,1900.8,817.34,43.0,266.11,14.0,0.0,2016.65,3100.1,,0.0,台,0.0,,0.0,,202010405,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,430,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 5、离心式深水泵拆除
- 430,430,431,2-132,蒸汽离心泵拆除 设备重量(t以内) 0.5,,0,9.66,19.29,194.04,83.44,43.0,27.17,14.0,0.0,222.99,333.6,,0.0,台,0.0,,0.0,,202010406,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,431,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 6、蒸汽离心泵拆除
- 431,431,432,2-133,蒸汽离心泵拆除 设备重量(t以内) 1,,0,12.8,38.58,309.76,133.2,43.0,43.37,14.0,0.0,361.14,537.71,,0.0,台,0.0,,0.0,,202010406,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,432,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 6、蒸汽离心泵拆除
- 432,432,433,2-134,蒸汽离心泵拆除 设备重量(t以内) 3,,0,19.73,38.58,652.52,280.58,43.0,91.35,14.0,0.0,710.83,1082.76,,0.0,台,0.0,,0.0,,202010406,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,433,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 6、蒸汽离心泵拆除
- 433,433,434,2-135,蒸汽离心泵拆除 设备重量(t以内) 5,,0,27.04,61.47,1056.88,454.46,43.0,147.96,14.0,0.0,1145.39,1747.81,,0.0,台,0.0,,0.0,,202010406,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,434,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 6、蒸汽离心泵拆除
- 434,434,435,2-136,蒸汽离心泵拆除 设备重量(t以内) 7,,0,38.52,81.96,1373.24,590.49,43.0,192.25,14.0,0.0,1493.72,2276.46,,0.0,台,0.0,,0.0,,202010406,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,435,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 6、蒸汽离心泵拆除
- 435,435,436,2-137,蒸汽离心泵拆除 设备重量(t以内) 10,,0,48.54,81.96,1946.56,837.02,43.0,272.52,14.0,0.0,2077.06,3186.6,,0.0,台,0.0,,0.0,,202010406,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,436,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 6、蒸汽离心泵拆除
- 436,436,437,2-138,电动往复泵拆除 设备重量(t以内) 0.5,,0,9.69,19.29,238.48,102.55,43.0,33.39,14.0,0.0,267.46,403.4,,0.0,台,0.0,,0.0,,202010407,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,437,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 7、电动往复泵拆除
- 437,437,438,2-139,电动往复泵拆除 设备重量(t以内) 0.7,,0,10.69,38.58,293.04,126.01,43.0,41.03,14.0,0.0,342.31,509.35,,0.0,台,0.0,,0.0,,202010407,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,438,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 7、电动往复泵拆除
- 438,438,439,2-140,电动往复泵拆除 设备重量(t以内) 1,,0,11.46,38.58,377.52,162.33,43.0,52.85,14.0,0.0,427.56,642.74,,0.0,台,0.0,,0.0,,202010407,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,439,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 7、电动往复泵拆除
- 439,439,440,2-141,电动往复泵拆除 设备重量(t以内) 3,,0,17.06,57.88,810.04,348.32,43.0,113.41,14.0,0.0,884.98,1346.71,,0.0,台,0.0,,0.0,,202010407,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,440,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 7、电动往复泵拆除
- 440,440,441,2-142,电动往复泵拆除 设备重量(t以内) 5,,0,18.25,61.47,1045.44,449.54,43.0,146.36,14.0,0.0,1125.16,1721.06,,0.0,台,0.0,,0.0,,202010407,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,441,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 7、电动往复泵拆除
- 441,441,442,2-143,电动往复泵拆除 设备重量(t以内) 7,,0,24.04,61.47,1634.6,702.88,43.0,228.84,14.0,0.0,1720.11,2651.83,,0.0,台,0.0,,0.0,,202010407,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,442,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 7、电动往复泵拆除
- 442,442,443,2-144,蒸汽往复泵拆除 设备重量(t以内) 0.5,,0,12.15,38.58,227.04,97.63,43.0,31.79,14.0,0.0,277.77,407.19,,0.0,台,0.0,,0.0,,202010408,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,443,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 8、蒸汽往复泵拆除
- 443,443,444,2-145,蒸汽往复泵拆除 设备重量(t以内) 1,,0,14.82,38.58,314.6,135.28,43.0,44.04,14.0,0.0,368.0,547.32,,0.0,台,0.0,,0.0,,202010408,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,444,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 8、蒸汽往复泵拆除
- 444,444,445,2-146,蒸汽往复泵拆除 设备重量(t以内) 1.5,,0,14.55,38.58,367.84,158.17,43.0,51.5,14.0,0.0,420.97,630.64,,0.0,台,0.0,,0.0,,202010408,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,445,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 8、蒸汽往复泵拆除
- 445,445,446,2-147,蒸汽往复泵拆除 设备重量(t以内) 3,,0,21.9,57.88,481.36,206.98,43.0,67.39,14.0,0.0,561.14,835.51,,0.0,台,0.0,,0.0,,202010408,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,446,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 8、蒸汽往复泵拆除
- 446,446,447,2-148,蒸汽往复泵拆除 设备重量(t以内) 5,,0,24.89,61.47,564.08,242.55,43.0,78.97,14.0,0.0,650.44,971.96,,0.0,台,0.0,,0.0,,202010408,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,447,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 8、蒸汽往复泵拆除
- 447,447,448,2-149,蒸汽往复泵拆除 设备重量(t以内) 7,,0,39.52,61.47,1026.08,441.21,43.0,143.65,14.0,0.0,1127.07,1711.93,,0.0,台,0.0,,0.0,,202010408,,,,,1,,0.0,,,拆除基础螺栓、支架、电动机、泵体、接头、法兰盘及附件,运到20m以内指定地点。,,1.0,0,0.0,,,,448,第二章 给排水工程 第一节 管道、阀门、卫生器具、泵类拆除 四、泵类拆除 8、蒸汽往复泵拆除
- 448,448,449,2-150,点形探测器,,0,0.0,0.0,3.65,1.57,43.0,0.51,14.0,0.0,3.65,5.73,,0.0,只,0.0,,0.0,,202020101,,,,,1,,0.0,,,本体、底座、接线拆除。a模块与接口拆除,线性电缆与固定装置拆除。,,1.0,0,0.0,,,,449,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 1、探测器拆除
- 449,449,450,2-151,红外光束探测器,,0,0.0,0.0,4.84,2.08,43.0,0.68,14.0,0.0,4.84,7.6,,0.0,只,0.0,,0.0,,202020101,,,,,1,,0.0,,,本体、底座、接线拆除。a模块与接口拆除,线性电缆与固定装置拆除。,,1.0,0,0.0,,,,450,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 1、探测器拆除
- 450,450,451,2-152,线形探测器,,0,0.0,0.0,11.0,4.73,43.0,1.54,14.0,0.0,11.0,17.27,,0.0,10m,0.0,,0.0,,202020101,,,,,10,,0.0,,,本体、底座、接线拆除。a模块与接口拆除,线性电缆与固定装置拆除。,,1.0,0,0.0,,,,451,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 1、探测器拆除
- 451,451,452,2-153,按钮、模块、总线隔离器,,0,0.0,0.0,1.76,0.76,43.0,0.25,14.0,0.0,1.76,2.77,,0.0,只,0.0,,0.0,,202020102,,,000004;000005,,1,,0.0,,,本体、接线拆除。,,1.0,0,0.0,,,,452,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 2、按钮、模块、总线隔离器拆除
- 452,452,453,2-154,报警(联动)控制器 多线制,,0,0.0,0.0,22.88,9.84,43.0,3.2,14.0,0.0,22.88,35.92,,0.0,台,0.0,,0.0,,202020103,,,000006;000009,,1,,0.0,,,本体、接线拆除。,,1.0,0,0.0,,,,453,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 3、报警(联动)控制器拆除
- 453,453,454,2-155,报警(联动)控制器 总线制,,0,0.0,0.0,13.2,5.68,43.0,1.85,14.0,0.0,13.2,20.73,,0.0,台,0.0,,0.0,,202020103,,,000006;000009,,1,,0.0,,,本体、接线拆除。,,1.0,0,0.0,,,,454,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 3、报警(联动)控制器拆除
- 454,454,455,2-156,重复显示器,,0,0.0,0.0,3.52,1.51,43.0,0.49,14.0,0.0,3.52,5.52,,0.0,台,0.0,,0.0,,202020104,,,000007,,1,,0.0,,,本体、接线拆除。,,1.0,0,0.0,,,,455,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 4、报警系统其他装置拆除
- 455,455,456,2-157,警报装置,,0,0.0,0.0,2.64,1.14,43.0,0.37,14.0,0.0,2.64,4.15,,0.0,台,0.0,,0.0,,202020104,,,,,1,,0.0,,,本体、接线拆除。,,1.0,0,0.0,,,,456,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 4、报警系统其他装置拆除
- 456,456,457,2-158,壁挂式电源箱,,0,0.0,0.0,13.64,5.87,43.0,1.91,14.0,0.0,13.64,21.42,,0.0,台,0.0,,0.0,,202020104,,,,,1,,0.0,,,本体、接线拆除。,,1.0,0,0.0,,,,457,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 4、报警系统其他装置拆除
- 457,457,458,2-159,端子箱,,0,0.0,0.0,15.4,6.62,43.0,2.16,14.0,0.0,15.4,24.18,,0.0,台,0.0,,0.0,,202020104,,,000008,,1,,0.0,,,本体、接线拆除。,,1.0,0,0.0,,,,458,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 4、报警系统其他装置拆除
- 458,458,459,2-160,广播通讯柜,,0,0.0,0.0,19.8,8.51,43.0,2.77,14.0,0.0,19.8,31.08,,0.0,台,0.0,,0.0,,202020104,,,,,1,,0.0,,,本体、接线拆除。,,1.0,0,0.0,,,,459,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 4、报警系统其他装置拆除
- 459,459,460,2-161,扬声器,,0,0.0,0.0,3.96,1.7,43.0,0.55,14.0,0.0,3.96,6.21,,0.0,只,0.0,,0.0,,202020104,,,,,1,,0.0,,,本体、接线拆除。,,1.0,0,0.0,,,,460,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 4、报警系统其他装置拆除
- 460,460,461,2-162,通讯分机,,0,0.0,0.0,2.2,0.95,43.0,0.31,14.0,0.0,2.2,3.46,,0.0,部,0.0,,0.0,,202020104,,,,,1,,0.0,,,本体、接线拆除。,,1.0,0,0.0,,,,461,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 4、报警系统其他装置拆除
- 461,461,462,2-163,通讯插座,,0,0.0,0.0,1.76,0.76,43.0,0.25,14.0,0.0,1.76,2.77,,0.0,只,0.0,,0.0,,202020104,,,,,1,,0.0,,,本体、接线拆除。,,1.0,0,0.0,,,,462,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 4、报警系统其他装置拆除
- 462,462,463,2-164,备用电池,,0,0.0,0.0,1.76,0.76,43.0,0.25,14.0,0.0,1.76,2.77,,0.0,只,0.0,,0.0,,202020104,,,,,1,,0.0,,,本体、接线拆除。,,1.0,0,0.0,,,,463,第二章 给排水工程 第二节 火灾自动报警系统拆除 一、报警系统设备拆除 4、报警系统其他装置拆除
- 463,463,464,2-165,喷头,,0,0.0,0.0,18.04,7.76,43.0,2.53,14.0,0.0,18.04,28.33,,0.0,10个,0.0,,0.0,,202020201,,,,,10,,0.0,,,本体拆除。a本体、附件、阀门、连通管及管件拆除。,,1.0,0,0.0,,,,464,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 1、喷头、湿式报警装置拆除
- 464,464,465,2-166,湿式报警装置 公称直径(mm以内) 100,,0,0.0,0.0,24.2,10.41,43.0,3.39,14.0,0.0,24.2,38.0,,0.0,组,0.0,,0.0,,202020201,,,,,1,,0.0,,,本体拆除。a本体、附件、阀门、连通管及管件拆除。,,1.0,0,0.0,,,,465,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 1、喷头、湿式报警装置拆除
- 465,465,466,2-167,湿式报警装置 公称直径(mm以内) 150,,0,0.0,0.0,39.16,16.84,43.0,5.48,14.0,0.0,39.16,61.48,,0.0,组,0.0,,0.0,,202020201,,,,,1,,0.0,,,本体拆除。a本体、附件、阀门、连通管及管件拆除。,,1.0,0,0.0,,,,466,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 1、喷头、湿式报警装置拆除
- 466,466,467,2-168,湿式报警装置 公称直径(mm以内) 200,,0,0.0,0.0,53.68,23.08,43.0,7.52,14.0,0.0,53.68,84.28,,0.0,组,0.0,,0.0,,202020201,,,,,1,,0.0,,,本体拆除。a本体、附件、阀门、连通管及管件拆除。,,1.0,0,0.0,,,,467,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 1、喷头、湿式报警装置拆除
- 467,467,468,2-169,温感式水幕装置 公称直径(mm以内) 32,,0,0.0,0.0,7.92,3.41,43.0,1.11,14.0,0.0,7.92,12.44,,0.0,组,0.0,,0.0,,202020202,,,,,1,,0.0,,,拆除本体、球阀、喷头附件及连接管等。,,1.0,0,0.0,,,,468,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 2、温感式水幕装置拆除
- 468,468,469,2-170,温感式水幕装置 公称直径(mm以内) 50,,0,0.0,0.0,8.8,3.78,43.0,1.23,14.0,0.0,8.8,13.81,,0.0,组,0.0,,0.0,,202020202,,,,,1,,0.0,,,拆除本体、球阀、喷头附件及连接管等。,,1.0,0,0.0,,,,469,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 2、温感式水幕装置拆除
- 469,469,470,2-171,螺纹连接 公称直径(mm以内) 80,,0,0.0,0.0,9.68,4.16,43.0,1.36,14.0,0.0,9.68,15.2,,0.0,个,0.0,,0.0,,202020203,,,,,1,,0.0,,,拆除本体。,,1.0,0,0.0,,,,470,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 3、水流指示器拆除
- 470,470,471,2-172,螺纹连接 公称直径(mm以内) 100,,0,0.0,0.0,16.28,7.0,43.0,2.28,14.0,0.0,16.28,25.56,,0.0,个,0.0,,0.0,,202020203,,,,,1,,0.0,,,拆除本体。,,1.0,0,0.0,,,,471,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 3、水流指示器拆除
- 471,471,472,2-173,法兰连接 公称直径(mm以内) 100,,0,0.0,0.0,22.88,9.84,43.0,3.2,14.0,0.0,22.88,35.92,,0.0,个,0.0,,0.0,,202020203,,,,,1,,0.0,,,拆除本体。,,1.0,0,0.0,,,,472,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 3、水流指示器拆除
- 472,472,473,2-174,法兰连接 公称直径(mm以内) 150,,0,0.0,0.0,37.84,16.27,43.0,5.3,14.0,0.0,37.84,59.41,,0.0,个,0.0,,0.0,,202020203,,,,,1,,0.0,,,拆除本体。,,1.0,0,0.0,,,,473,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 3、水流指示器拆除
- 473,473,474,2-175,法兰连接 公称直径(mm以内) 200,,0,0.0,0.0,47.96,20.62,43.0,6.71,14.0,0.0,47.96,75.29,,0.0,个,0.0,,0.0,,202020203,,,,,1,,0.0,,,拆除本体。,,1.0,0,0.0,,,,474,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 3、水流指示器拆除
- 474,474,475,2-176,减压孔板,,0,0.0,0.0,11.0,4.73,43.0,1.54,14.0,0.0,11.0,17.27,,0.0,个,0.0,,0.0,,202020204,,,,,1,,0.0,,,拆除本体a拆除本体及支架。,,1.0,0,0.0,,,,475,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 4、其他组件拆除
- 475,475,476,2-177,集热板,,0,0.0,0.0,2.64,1.14,43.0,0.37,14.0,0.0,2.64,4.15,,0.0,个,0.0,,0.0,,202020204,,,,,1,,0.0,,,拆除本体a拆除本体及支架。,,1.0,0,0.0,,,,476,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 4、其他组件拆除
- 476,476,477,2-178,室内明装,,0,0.0,0.0,29.92,12.87,43.0,4.19,14.0,0.0,29.92,46.98,,0.0,套,0.0,,0.0,,202020205,,,,,1,,0.0,,,拆除消火栓、箱体、水龙带、室外消火栓带底座。,,1.0,0,0.0,,,,477,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 5、消火栓拆除
- 477,477,478,2-179,室内暗装,,0,0.0,0.0,33.44,14.38,43.0,4.68,14.0,0.0,33.44,52.5,,0.0,套,0.0,,0.0,,202020205,,,,,1,,0.0,,,拆除消火栓、箱体、水龙带、室外消火栓带底座。,,1.0,0,0.0,,,,478,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 5、消火栓拆除
- 478,478,479,2-180,室外地下式,,0,0.0,0.0,39.16,16.84,43.0,5.48,14.0,0.0,39.16,61.48,,0.0,套,0.0,,0.0,,202020205,,,,,1,,0.0,,,拆除消火栓、箱体、水龙带、室外消火栓带底座。,,1.0,0,0.0,,,,479,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 5、消火栓拆除
- 479,479,480,2-181,室外地上式,,0,0.0,0.0,27.28,11.73,43.0,3.82,14.0,0.0,27.28,42.83,,0.0,套,0.0,,0.0,,202020205,,,,,1,,0.0,,,拆除消火栓、箱体、水龙带、室外消火栓带底座。,,1.0,0,0.0,,,,480,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 5、消火栓拆除
- 480,480,481,2-182,消防水泵结合器 地下式,,0,0.0,0.0,37.4,16.08,43.0,5.24,14.0,0.0,37.4,58.72,,0.0,套,0.0,,0.0,,202020206,,,,,1,,0.0,,,拆除本体。,,1.0,0,0.0,,,,481,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 6、消防水泵结合器拆除
- 481,481,482,2-183,消防水泵结合器 地上式(墙壁式),,0,0.0,0.0,26.4,11.35,43.0,3.7,14.0,0.0,26.4,41.45,,0.0,套,0.0,,0.0,,202020206,,,,,1,,0.0,,,拆除本体。,,1.0,0,0.0,,,,482,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 6、消防水泵结合器拆除
- 482,482,483,2-184,气压罐 公称直径(mm以内) 800,,0,0.0,0.0,52.8,22.7,43.0,7.39,14.0,0.0,52.8,82.89,,0.0,台,0.0,,0.0,,202020207,,,,,1,,0.0,,,拆除本体。,,1.0,0,0.0,,,,483,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 7、隔膜式气压水罐(气压罐)拆除
- 483,483,484,2-185,气压罐 公称直径(mm以内) 1000,,0,0.0,0.0,83.6,35.95,43.0,11.7,14.0,0.0,83.6,131.25,,0.0,台,0.0,,0.0,,202020207,,,,,1,,0.0,,,拆除本体。,,1.0,0,0.0,,,,484,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 7、隔膜式气压水罐(气压罐)拆除
- 484,484,485,2-186,气压罐 公称直径(mm以内) 1200,,0,0.0,0.0,107.8,46.35,43.0,15.09,14.0,0.0,107.8,169.24,,0.0,台,0.0,,0.0,,202020207,,,,,1,,0.0,,,拆除本体。,,1.0,0,0.0,,,,485,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 7、隔膜式气压水罐(气压罐)拆除
- 485,485,486,2-187,气压罐 公称直径(mm以内) 1400,,0,0.0,0.0,125.84,54.11,43.0,17.62,14.0,0.0,125.84,197.57,,0.0,台,0.0,,0.0,,202020207,,,,,1,,0.0,,,拆除本体。,,1.0,0,0.0,,,,486,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 7、隔膜式气压水罐(气压罐)拆除
- 486,486,487,2-188,贮存容器规格(升以内) 4,,0,0.0,0.0,2.64,1.14,43.0,0.37,14.0,0.0,2.64,4.15,,0.0,套,0.0,,0.0,,202020208,,,,,1,,0.0,,,本体、支框架、系统组件、阀驱动装置拆除。,,1.0,0,0.0,,,,487,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 8、气体贮存装置拆除
- 487,487,488,2-189,贮存容器规格(升以内) 90,,0,0.0,0.0,11.44,4.92,43.0,1.6,14.0,0.0,11.44,17.96,,0.0,套,0.0,,0.0,,202020208,,,,,1,,0.0,,,本体、支框架、系统组件、阀驱动装置拆除。,,1.0,0,0.0,,,,488,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 8、气体贮存装置拆除
- 488,488,489,2-190,贮存容器规格(升以内) 155,,0,0.0,0.0,21.12,9.08,43.0,2.96,14.0,0.0,21.12,33.16,,0.0,套,0.0,,0.0,,202020208,,,,,1,,0.0,,,本体、支框架、系统组件、阀驱动装置拆除。,,1.0,0,0.0,,,,489,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 8、气体贮存装置拆除
- 489,489,490,2-191,贮存容器规格(升以内) 270,,0,0.0,0.0,37.4,16.08,43.0,5.24,14.0,0.0,37.4,58.72,,0.0,套,0.0,,0.0,,202020208,,,,,1,,0.0,,,本体、支框架、系统组件、阀驱动装置拆除。,,1.0,0,0.0,,,,490,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 8、气体贮存装置拆除
- 490,490,491,2-192,二氧化碳称重检漏装置,,0,0.0,0.0,11.0,4.73,43.0,1.54,14.0,0.0,11.0,17.27,,0.0,套,0.0,,0.0,,202020209,,,,,1,,0.0,,,本体、配重、支架、报警器拆除。,,1.0,0,0.0,,,,491,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 9、二氧化碳称重检漏装置拆除
- 491,491,492,2-193,水轮机式 PFS3 PF4 PFS4,,0,0.0,0.0,22.0,9.46,43.0,3.08,14.0,0.0,22.0,34.54,,0.0,台,0.0,,0.0,,202020210,,,,,1,,0.0,,,本体拆除。,,1.0,0,0.0,,,,492,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 10、泡沫发生器拆除
- 492,492,493,2-194,水轮机式 PFS10,,0,0.0,0.0,72.6,31.22,43.0,10.16,14.0,0.0,72.6,113.98,,0.0,台,0.0,,0.0,,202020210,,,,,1,,0.0,,,本体拆除。,,1.0,0,0.0,,,,493,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 10、泡沫发生器拆除
- 493,493,494,2-195,电动机式 PF20,,0,0.0,0.0,105.6,45.41,43.0,14.78,14.0,0.0,105.6,165.79,,0.0,台,0.0,,0.0,,202020210,,,,,1,,0.0,,,本体拆除。,,1.0,0,0.0,,,,494,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 10、泡沫发生器拆除
- 494,494,495,2-196,电动机式 BGP-200,,0,0.0,0.0,27.28,11.73,43.0,3.82,14.0,0.0,27.28,42.83,,0.0,台,0.0,,0.0,,202020210,,,,,1,,0.0,,,本体拆除。,,1.0,0,0.0,,,,495,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 10、泡沫发生器拆除
- 495,495,496,2-197,压力储罐式,,0,0.0,0.0,211.2,90.82,43.0,29.57,14.0,0.0,211.2,331.59,,0.0,台,0.0,,0.0,,202020211,,,,,1,,0.0,,,本体拆除。,,1.0,0,0.0,,,,496,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 11、泡沫比例混合器拆除
- 496,496,497,2-198,平衡压力式,,0,0.0,0.0,33.0,14.19,43.0,4.62,14.0,0.0,33.0,51.81,,0.0,台,0.0,,0.0,,202020211,,,,,1,,0.0,,,本体拆除。,,1.0,0,0.0,,,,497,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 11、泡沫比例混合器拆除
- 497,497,498,2-199,环泵式,,0,0.0,0.0,16.72,7.19,43.0,2.34,14.0,0.0,16.72,26.25,,0.0,台,0.0,,0.0,,202020211,,,,,1,,0.0,,,本体拆除。,,1.0,0,0.0,,,,498,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 11、泡沫比例混合器拆除
- 498,498,499,2-200,管线式,,0,0.0,0.0,10.12,4.35,43.0,1.42,14.0,0.0,10.12,15.89,,0.0,台,0.0,,0.0,,202020211,,,,,1,,0.0,,,本体拆除。,,1.0,0,0.0,,,,499,第二章 给排水工程 第二节 火灾自动报警系统拆除 二、灭火系统设备拆除 11、泡沫比例混合器拆除
- 499,499,500,2-201,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ57mm以下(厚度mm) 30,,0,3.07,0.0,27.28,11.73,43.0,3.82,14.0,0.0,30.35,45.9,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,500,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 500,500,501,2-202,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ57mm以下(厚度mm) 40,,0,3.22,0.0,36.96,15.89,43.0,5.17,14.0,0.0,40.18,61.24,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,501,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 501,501,502,2-203,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ57mm以下(厚度mm) 50,,0,3.38,0.0,41.8,17.97,43.0,5.85,14.0,0.0,45.18,69.0,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,502,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 502,502,503,2-204,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ57mm以下(厚度mm) 60,,0,3.55,0.0,48.4,20.81,43.0,6.78,14.0,0.0,51.95,79.54,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,503,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 503,503,504,2-205,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ57mm以下(厚度mm) 70,,0,3.73,0.0,52.36,22.51,43.0,7.33,14.0,0.0,56.09,85.93,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,504,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 504,504,505,2-206,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ57mm以下(厚度mm) 80,,0,3.92,0.0,55.0,23.65,43.0,7.7,14.0,0.0,58.92,90.27,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,505,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 505,505,506,2-207,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ133mm以下(厚度mm) 30,,0,4.6,0.0,28.16,12.11,43.0,3.94,14.0,0.0,32.76,48.81,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,506,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 506,506,507,2-208,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ133mm以下(厚度mm) 40,,0,4.83,0.0,36.08,15.51,43.0,5.05,14.0,0.0,40.91,61.47,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,507,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 507,507,508,2-209,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ133mm以下(厚度mm) 50,,0,5.07,0.0,41.8,17.97,43.0,5.85,14.0,0.0,46.87,70.69,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,508,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 508,508,509,2-210,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ133mm以下(厚度mm) 60,,0,5.32,0.0,44.0,18.92,43.0,6.16,14.0,0.0,49.32,74.4,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,509,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 509,509,510,2-211,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ133mm以下(厚度mm) 70,,0,5.59,0.0,47.08,20.24,43.0,6.59,14.0,0.0,52.67,79.5,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,510,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 510,510,511,2-212,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ133mm以下(厚度mm) 80,,0,5.87,0.0,47.96,20.62,43.0,6.71,14.0,0.0,53.83,81.16,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,511,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 511,511,512,2-213,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ325mm以下(厚度mm) 30,,0,9.2,0.0,51.48,22.14,43.0,7.21,14.0,0.0,60.68,90.03,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,512,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 512,512,513,2-214,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ325mm以下(厚度mm) 40,,0,9.66,0.0,60.72,26.11,43.0,8.5,14.0,0.0,70.38,104.99,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,513,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 513,513,514,2-215,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ325mm以下(厚度mm) 50,,0,10.14,0.0,69.52,29.89,43.0,9.73,14.0,0.0,79.66,119.28,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,514,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 514,514,515,2-216,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ325mm以下(厚度mm) 60,,0,10.65,0.0,73.04,31.41,43.0,10.23,14.0,0.0,83.69,125.33,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,515,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 515,515,516,2-217,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ325mm以下(厚度mm) 70,,0,11.18,0.0,79.2,34.06,43.0,11.09,14.0,0.0,90.38,135.53,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,516,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 516,516,517,2-218,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ325mm以下(厚度mm) 80,,0,11.74,0.0,80.96,34.81,43.0,11.33,14.0,0.0,92.7,138.84,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,517,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 517,517,518,2-219,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ529mm以下(厚度mm) 30,,0,9.2,0.0,80.08,34.43,43.0,11.21,14.0,0.0,89.28,134.92,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,518,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 518,518,519,2-220,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ529mm以下(厚度mm) 40,,0,9.66,0.0,96.36,41.43,43.0,13.49,14.0,0.0,106.02,160.94,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,519,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 519,519,520,2-221,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ529mm以下(厚度mm) 50,,0,10.14,0.0,106.48,45.79,43.0,14.91,14.0,0.0,116.62,177.32,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,520,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 520,520,521,2-222,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ529mm以下(厚度mm) 60,,0,10.65,0.0,109.56,47.11,43.0,15.34,14.0,0.0,120.21,182.66,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,521,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 521,521,522,2-223,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ529mm以下(厚度mm) 70,,0,11.18,0.0,112.2,48.25,43.0,15.71,14.0,0.0,123.38,187.34,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,522,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 522,522,523,2-224,硬质瓦块类、泡沫类、纤维类绝热拆除 管道Φ529mm以下(厚度mm) 80,,0,11.74,0.0,115.28,49.57,43.0,16.14,14.0,0.0,127.02,192.73,,0.0,10m,0.0,,0.0,,202030100,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,523,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 523,523,524,2-225,硬质瓦块类、泡沫类、纤维类绝热拆除 立式设备(厚度mm) 30,,0,8.53,0.0,336.16,144.55,43.0,47.06,14.0,0.0,344.69,536.3,,0.0,m3,0.0,,0.0,,202030100,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,524,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 524,524,525,2-226,硬质瓦块类、泡沫类、纤维类绝热拆除 立式设备(厚度mm) 40,,0,8.98,0.0,287.32,123.55,43.0,40.22,14.0,0.0,296.3,460.07,,0.0,m3,0.0,,0.0,,202030100,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,525,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 525,525,526,2-227,硬质瓦块类、泡沫类、纤维类绝热拆除 立式设备(厚度mm) 50,,0,9.45,0.0,243.32,104.63,43.0,34.06,14.0,0.0,252.77,391.46,,0.0,m3,0.0,,0.0,,202030100,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,526,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 526,526,527,2-228,硬质瓦块类、泡沫类、纤维类绝热拆除 立式设备(厚度mm) 60,,0,9.95,0.0,209.0,89.87,43.0,29.26,14.0,0.0,218.95,338.08,,0.0,m3,0.0,,0.0,,202030100,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,527,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 527,527,528,2-229,硬质瓦块类、泡沫类、纤维类绝热拆除 立式设备(厚度mm) 70,,0,10.45,0.0,183.04,78.71,43.0,25.63,14.0,0.0,193.49,297.83,,0.0,m3,0.0,,0.0,,202030100,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,528,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 528,528,529,2-230,硬质瓦块类、泡沫类、纤维类绝热拆除 立式设备(厚度mm) 80,,0,10.97,0.0,159.72,68.68,43.0,22.36,14.0,0.0,170.69,261.73,,0.0,m3,0.0,,0.0,,202030100,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,529,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 529,529,530,2-231,硬质瓦块类、泡沫类、纤维类绝热拆除 卧式设备(厚度mm) 30,,0,8.53,0.0,351.56,151.17,43.0,49.22,14.0,0.0,360.09,560.48,,0.0,m3,0.0,,0.0,,202030100,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,530,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 530,530,531,2-232,硬质瓦块类、泡沫类、纤维类绝热拆除 卧式设备(厚度mm) 40,,0,8.98,0.0,342.76,147.39,43.0,47.99,14.0,0.0,351.74,547.12,,0.0,m3,0.0,,0.0,,202030100,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,531,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 531,531,532,2-233,硬质瓦块类、泡沫类、纤维类绝热拆除 卧式设备(厚度mm) 50,,0,9.45,0.0,296.56,127.52,43.0,41.52,14.0,0.0,306.01,475.05,,0.0,m3,0.0,,0.0,,202030100,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,532,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 532,532,533,2-234,硬质瓦块类、泡沫类、纤维类绝热拆除 卧式设备(厚度mm) 60,,0,9.95,0.0,249.92,107.47,43.0,34.99,14.0,0.0,259.87,402.33,,0.0,m3,0.0,,0.0,,202030100,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,533,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 533,533,534,2-235,硬质瓦块类、泡沫类、纤维类绝热拆除 卧式设备(厚度mm) 70,,0,10.45,0.0,221.32,95.17,43.0,30.98,14.0,0.0,231.77,357.92,,0.0,m3,0.0,,0.0,,202030100,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,534,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 534,534,535,2-236,硬质瓦块类、泡沫类、纤维类绝热拆除 卧式设备(厚度mm) 80,,0,10.97,0.0,189.2,81.36,43.0,26.49,14.0,0.0,200.17,308.02,,0.0,m3,0.0,,0.0,,202030100,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层、拆除绑扎铁丝,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,535,第二章 给排水工程 第三节 绝热拆除 一、硬质瓦块类、泡沫类、纤维类绝热拆除
- 535,535,536,2-237,聚氨酯泡沫绝缘层拆除 管道Φ57mm以下(厚度mm) 30,,0,3.22,0.0,48.84,21.0,43.0,6.84,14.0,0.0,52.06,79.9,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,536,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 536,536,537,2-238,聚氨酯泡沫绝缘层拆除 管道Φ57mm以下(厚度mm) 40,,0,3.38,0.0,65.12,28.0,43.0,9.12,14.0,0.0,68.5,105.62,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,537,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 537,537,538,2-239,聚氨酯泡沫绝缘层拆除 管道Φ57mm以下(厚度mm) 50,,0,3.55,0.0,79.2,34.06,43.0,11.09,14.0,0.0,82.75,127.9,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,538,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 538,538,539,2-240,聚氨酯泡沫绝缘层拆除 管道Φ57mm以下(厚度mm) 60,,0,3.73,0.0,90.64,38.98,43.0,12.69,14.0,0.0,94.37,146.04,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,539,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 539,539,540,2-241,聚氨酯泡沫绝缘层拆除 管道Φ57mm以下(厚度mm) 70,,0,3.92,0.0,99.44,42.76,43.0,13.92,14.0,0.0,103.36,160.04,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,540,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 540,540,541,2-242,聚氨酯泡沫绝缘层拆除 管道Φ57mm以下(厚度mm) 80,,0,4.12,0.0,108.24,46.54,43.0,15.15,14.0,0.0,112.36,174.05,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,541,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 541,541,542,2-243,聚氨酯泡沫绝缘层拆除 管道Φ133mm以下(厚度mm) 30,,0,4.83,0.0,82.72,35.57,43.0,11.58,14.0,0.0,87.55,134.7,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,542,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 542,542,543,2-244,聚氨酯泡沫绝缘层拆除 管道Φ133mm以下(厚度mm) 40,,0,5.07,0.0,101.2,43.52,43.0,14.17,14.0,0.0,106.27,163.96,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,543,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 543,543,544,2-245,聚氨酯泡沫绝缘层拆除 管道Φ133mm以下(厚度mm) 50,,0,5.32,0.0,113.08,48.62,43.0,15.83,14.0,0.0,118.4,182.85,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,544,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 544,544,545,2-246,聚氨酯泡沫绝缘层拆除 管道Φ133mm以下(厚度mm) 60,,0,5.59,0.0,119.24,51.27,43.0,16.69,14.0,0.0,124.83,192.79,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,545,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 545,545,546,2-247,聚氨酯泡沫绝缘层拆除 管道Φ133mm以下(厚度mm) 70,,0,5.87,0.0,122.32,52.6,43.0,17.12,14.0,0.0,128.19,197.91,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,546,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 546,546,547,2-248,聚氨酯泡沫绝缘层拆除 管道Φ133mm以下(厚度mm) 80,,0,6.16,0.0,122.32,52.6,43.0,17.12,14.0,0.0,128.48,198.2,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,547,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 547,547,548,2-249,聚氨酯泡沫绝缘层拆除 管道Φ325mm以下(厚度mm) 30,,0,9.66,0.0,158.4,68.11,43.0,22.18,14.0,0.0,168.06,258.35,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,548,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 548,548,549,2-250,聚氨酯泡沫绝缘层拆除 管道Φ325mm以下(厚度mm) 40,,0,10.14,0.0,180.84,77.76,43.0,25.32,14.0,0.0,190.98,294.06,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,549,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 549,549,550,2-251,聚氨酯泡沫绝缘层拆除 管道Φ325mm以下(厚度mm) 50,,0,10.65,0.0,194.48,83.63,43.0,27.23,14.0,0.0,205.13,315.99,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,550,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 550,550,551,2-252,聚氨酯泡沫绝缘层拆除 管道Φ325mm以下(厚度mm) 60,,0,11.18,0.0,201.08,86.46,43.0,28.15,14.0,0.0,212.26,326.87,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,551,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 551,551,552,2-253,聚氨酯泡沫绝缘层拆除 管道Φ325mm以下(厚度mm) 70,,0,11.74,0.0,205.92,88.55,43.0,28.83,14.0,0.0,217.66,335.04,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,552,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 552,552,553,2-254,聚氨酯泡沫绝缘层拆除 管道Φ325mm以下(厚度mm) 80,,0,12.33,0.0,209.88,90.25,43.0,29.38,14.0,0.0,222.21,341.84,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,553,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 553,553,554,2-255,聚氨酯泡沫绝缘层拆除 管道Φ529mm以下(厚度mm) 30,,0,9.66,0.0,243.76,104.82,43.0,34.13,14.0,0.0,253.42,392.37,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,554,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 554,554,555,2-256,聚氨酯泡沫绝缘层拆除 管道Φ529mm以下(厚度mm) 40,,0,10.14,0.0,278.08,119.57,43.0,38.93,14.0,0.0,288.22,446.72,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,555,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 555,555,556,2-257,聚氨酯泡沫绝缘层拆除 管道Φ529mm以下(厚度mm) 50,,0,10.65,0.0,295.68,127.14,43.0,41.4,14.0,0.0,306.33,474.87,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,556,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 556,556,557,2-258,聚氨酯泡沫绝缘层拆除 管道Φ529mm以下(厚度mm) 60,,0,11.18,0.0,299.2,128.66,43.0,41.89,14.0,0.0,310.38,480.93,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,557,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 557,557,558,2-259,聚氨酯泡沫绝缘层拆除 管道Φ529mm以下(厚度mm) 70,,0,11.74,0.0,302.28,129.98,43.0,42.32,14.0,0.0,314.02,486.32,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,558,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 558,558,559,2-260,聚氨酯泡沫绝缘层拆除 管道Φ529mm以下(厚度mm) 80,,0,12.33,0.0,305.36,131.3,43.0,42.75,14.0,0.0,317.69,491.74,,0.0,10m,0.0,,0.0,,202030200,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,559,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 559,559,560,2-261,聚氨酯泡沫绝缘层拆除 立式设备(厚度mm) 30,,0,8.96,0.0,185.68,79.84,43.0,26.0,14.0,0.0,194.64,300.48,,0.0,m3,0.0,,0.0,,202030200,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,560,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 560,560,561,2-262,聚氨酯泡沫绝缘层拆除 立式设备(厚度mm) 40,,0,9.41,0.0,176.88,76.06,43.0,24.76,14.0,0.0,186.29,287.11,,0.0,m3,0.0,,0.0,,202030200,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,561,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 561,561,562,2-263,聚氨酯泡沫绝缘层拆除 立式设备(厚度mm) 50,,0,9.88,0.0,168.52,72.46,43.0,23.59,14.0,0.0,178.4,274.45,,0.0,m3,0.0,,0.0,,202030200,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,562,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 562,562,563,2-264,聚氨酯泡沫绝缘层拆除 立式设备(厚度mm) 60,,0,10.37,0.0,160.16,68.87,43.0,22.42,14.0,0.0,170.53,261.82,,0.0,m3,0.0,,0.0,,202030200,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,563,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 563,563,564,2-265,聚氨酯泡沫绝缘层拆除 立式设备(厚度mm) 70,,0,10.89,0.0,152.24,65.46,43.0,21.31,14.0,0.0,163.13,249.9,,0.0,m3,0.0,,0.0,,202030200,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,564,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 564,564,565,2-266,聚氨酯泡沫绝缘层拆除 立式设备(厚度mm) 80,,0,11.44,0.0,144.76,62.25,43.0,20.27,14.0,0.0,156.2,238.72,,0.0,m3,0.0,,0.0,,202030200,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,565,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 565,565,566,2-267,聚氨酯泡沫绝缘层拆除 卧式设备(厚度mm) 30,,0,8.96,0.0,211.64,91.01,43.0,29.63,14.0,0.0,220.6,341.24,,0.0,m3,0.0,,0.0,,202030200,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,566,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 566,566,567,2-268,聚氨酯泡沫绝缘层拆除 卧式设备(厚度mm) 40,,0,9.41,0.0,201.52,86.65,43.0,28.21,14.0,0.0,210.93,325.79,,0.0,m3,0.0,,0.0,,202030200,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,567,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 567,567,568,2-269,聚氨酯泡沫绝缘层拆除 卧式设备(厚度mm) 50,,0,9.88,0.0,191.84,82.49,43.0,26.86,14.0,0.0,201.72,311.07,,0.0,m3,0.0,,0.0,,202030200,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,568,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 568,568,569,2-270,聚氨酯泡沫绝缘层拆除 卧式设备(厚度mm) 60,,0,10.37,0.0,182.16,78.33,43.0,25.5,14.0,0.0,192.53,296.36,,0.0,m3,0.0,,0.0,,202030200,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,569,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 569,569,570,2-271,聚氨酯泡沫绝缘层拆除 卧式设备(厚度mm) 70,,0,10.89,0.0,172.92,74.36,43.0,24.21,14.0,0.0,183.81,282.38,,0.0,m3,0.0,,0.0,,202030200,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,570,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 570,570,571,2-272,聚氨酯泡沫绝缘层拆除 卧式设备(厚度mm) 80,,0,11.44,0.0,164.12,70.57,43.0,22.98,14.0,0.0,175.56,269.11,,0.0,m3,0.0,,0.0,,202030200,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,571,第二章 给排水工程 第三节 绝热拆除 二、聚氨酯泡沫绝缘层拆除
- 571,571,572,2-273,海泡石绝热拆除 管道Φ57mm以下(厚度mm) 20,,0,3.22,0.0,48.84,21.0,43.0,6.84,14.0,0.0,52.06,79.9,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,572,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 572,572,573,2-274,海泡石绝热拆除 管道Φ57mm以下(厚度mm) 30,,0,3.38,0.0,57.64,24.79,43.0,8.07,14.0,0.0,61.02,93.88,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,573,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 573,573,574,2-275,海泡石绝热拆除 管道Φ57mm以下(厚度mm) 40,,0,3.55,0.0,78.32,33.68,43.0,10.96,14.0,0.0,81.87,126.51,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,574,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 574,574,575,2-276,海泡石绝热拆除 管道Φ57mm以下(厚度mm) 50,,0,3.73,0.0,99.0,42.57,43.0,13.86,14.0,0.0,102.73,159.16,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,575,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 575,575,576,2-277,海泡石绝热拆除 管道Φ57mm以下(厚度mm) 60,,0,3.92,0.0,117.48,50.52,43.0,16.45,14.0,0.0,121.4,188.37,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,576,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 576,576,577,2-278,海泡石绝热拆除 管道Φ133mm以下(厚度mm) 20,,0,4.83,0.0,60.28,25.92,43.0,8.44,14.0,0.0,65.11,99.47,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,577,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 577,577,578,2-279,海泡石绝热拆除 管道Φ133mm以下(厚度mm) 30,,0,5.07,0.0,60.72,26.11,43.0,8.5,14.0,0.0,65.79,100.4,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,578,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 578,578,579,2-280,海泡石绝热拆除 管道Φ133mm以下(厚度mm) 40,,0,5.32,0.0,87.12,37.46,43.0,12.2,14.0,0.0,92.44,142.1,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,579,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 579,579,580,2-281,海泡石绝热拆除 管道Φ133mm以下(厚度mm) 50,,0,5.59,0.0,88.0,37.84,43.0,12.32,14.0,0.0,93.59,143.75,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,580,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 580,580,581,2-282,海泡石绝热拆除 管道Φ133mm以下(厚度mm) 60,,0,5.87,0.0,125.4,53.92,43.0,17.56,14.0,0.0,131.27,202.75,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,581,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 581,581,582,2-283,海泡石绝热拆除 管道Φ325mm以下(厚度mm) 20,,0,9.66,0.0,135.52,58.27,43.0,18.97,14.0,0.0,145.18,222.42,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,582,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 582,582,583,2-284,海泡石绝热拆除 管道Φ325mm以下(厚度mm) 30,,0,10.14,0.0,155.76,66.98,43.0,21.81,14.0,0.0,165.9,254.69,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,583,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 583,583,584,2-285,海泡石绝热拆除 管道Φ325mm以下(厚度mm) 40,,0,10.65,0.0,176.44,75.87,43.0,24.7,14.0,0.0,187.09,287.66,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,584,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 584,584,585,2-286,海泡石绝热拆除 管道Φ325mm以下(厚度mm) 50,,0,11.18,0.0,177.76,76.44,43.0,24.89,14.0,0.0,188.94,290.27,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,585,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 585,585,586,2-287,海泡石绝热拆除 管道Φ325mm以下(厚度mm) 60,,0,11.74,0.0,210.76,90.63,43.0,29.51,14.0,0.0,222.5,342.64,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,586,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 586,586,587,2-288,海泡石绝热拆除 管道Φ529mm以下(厚度mm) 20,,0,9.66,0.0,135.52,58.27,43.0,18.97,14.0,0.0,145.18,222.42,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,587,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 587,587,588,2-289,海泡石绝热拆除 管道Φ529mm以下(厚度mm) 30,,0,10.14,0.0,155.76,66.98,43.0,21.81,14.0,0.0,165.9,254.69,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,588,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 588,588,589,2-290,海泡石绝热拆除 管道Φ529mm以下(厚度mm) 40,,0,10.65,0.0,176.44,75.87,43.0,24.7,14.0,0.0,187.09,287.66,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,589,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 589,589,590,2-291,海泡石绝热拆除 管道Φ529mm以下(厚度mm) 50,,0,11.18,0.0,177.76,76.44,43.0,24.89,14.0,0.0,188.94,290.27,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,590,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 590,590,591,2-292,海泡石绝热拆除 管道Φ529mm以下(厚度mm) 60,,0,11.74,0.0,210.76,90.63,43.0,29.51,14.0,0.0,222.5,342.64,,0.0,10m,0.0,,0.0,,202030300,,,000002;000003,,10,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,591,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 591,591,592,2-293,海泡石绝热拆除 设备(厚度mm) 20,,0,8.96,0.0,132.0,56.76,43.0,18.48,14.0,0.0,140.96,216.2,,0.0,m3,0.0,,0.0,,202030300,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,592,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 592,592,593,2-294,海泡石绝热拆除 设备(厚度mm) 30,,0,9.41,0.0,139.04,59.79,43.0,19.47,14.0,0.0,148.45,227.71,,0.0,m3,0.0,,0.0,,202030300,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,593,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 593,593,594,2-295,海泡石绝热拆除 设备(厚度mm) 40,,0,9.88,0.0,146.52,63.0,43.0,20.51,14.0,0.0,156.4,239.91,,0.0,m3,0.0,,0.0,,202030300,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,594,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 594,594,595,2-296,海泡石绝热拆除 设备(厚度mm) 50,,0,10.37,0.0,154.0,66.22,43.0,21.56,14.0,0.0,164.37,252.15,,0.0,m3,0.0,,0.0,,202030300,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,595,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 595,595,596,2-297,海泡石绝热拆除 设备(厚度mm) 60,,0,10.89,0.0,161.92,69.63,43.0,22.67,14.0,0.0,172.81,265.11,,0.0,m3,0.0,,0.0,,202030300,,,000002;000003,,1,,0.0,,,拆除绝热保护层、保温层、防潮层,管道、设备除锈,清理污物至指定地点。,,1.0,0,0.0,,,,596,第二章 给排水工程 第三节 绝热拆除 三、海泡石绝热拆除
- 596,596,597,2-298,室内外给水镀锌钢管修理 公称直径(mm以内) 15,,0,4.21,0.0,24.2,10.41,43.0,3.39,14.0,0.0,28.41,42.21,,0.0,处,0.0,,0.0,,202040101,,,,,1,,0.0,,,拆除镀锌钢管、切管、套丝、上零件、试水。,,1.0,0,0.0,,,,597,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 1、室内外给水镀锌钢管修理
- 597,597,598,2-299,室内外给水镀锌钢管修理 公称直径(mm以内) 20,,0,4.99,0.0,24.2,10.41,43.0,3.39,14.0,0.0,29.19,42.99,,0.0,处,0.0,,0.0,,202040101,,,,,1,,0.0,,,拆除镀锌钢管、切管、套丝、上零件、试水。,,1.0,0,0.0,,,,598,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 1、室内外给水镀锌钢管修理
- 598,598,599,2-300,室内外给水镀锌钢管修理 公称直径(mm以内) 25,,0,7.05,0.0,30.8,13.24,43.0,4.31,14.0,0.0,37.85,55.4,,0.0,处,0.0,,0.0,,202040101,,,,,1,,0.0,,,拆除镀锌钢管、切管、套丝、上零件、试水。,,1.0,0,0.0,,,,599,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 1、室内外给水镀锌钢管修理
- 599,599,600,2-301,室内外给水镀锌钢管修理 公称直径(mm以内) 32,,0,9.86,0.0,30.8,13.24,43.0,4.31,14.0,0.0,40.66,58.21,,0.0,处,0.0,,0.0,,202040101,,,,,1,,0.0,,,拆除镀锌钢管、切管、套丝、上零件、试水。,,1.0,0,0.0,,,,600,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 1、室内外给水镀锌钢管修理
- 600,600,601,2-302,室内外给水镀锌钢管修理 公称直径(mm以内) 40,,0,13.38,0.0,44.0,18.92,43.0,6.16,14.0,0.0,57.38,82.46,,0.0,处,0.0,,0.0,,202040101,,,,,1,,0.0,,,拆除镀锌钢管、切管、套丝、上零件、试水。,,1.0,0,0.0,,,,601,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 1、室内外给水镀锌钢管修理
- 601,601,602,2-303,室内外给水镀锌钢管修理 公称直径(mm以内) 50,,0,17.66,0.0,44.0,18.92,43.0,6.16,14.0,0.0,61.66,86.74,,0.0,处,0.0,,0.0,,202040101,,,,,1,,0.0,,,拆除镀锌钢管、切管、套丝、上零件、试水。,,1.0,0,0.0,,,,602,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 1、室内外给水镀锌钢管修理
- 602,602,603,2-304,室内外给水镀锌钢管修理 公称直径(mm以内) 70,,0,33.21,0.0,63.8,27.43,43.0,8.93,14.0,0.0,97.01,133.37,,0.0,处,0.0,,0.0,,202040101,,,,,1,,0.0,,,拆除镀锌钢管、切管、套丝、上零件、试水。,,1.0,0,0.0,,,,603,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 1、室内外给水镀锌钢管修理
- 603,603,604,2-305,室内外给水镀锌钢管修理 公称直径(mm以内) 80,,0,46.45,0.0,63.8,27.43,43.0,8.93,14.0,0.0,110.25,146.61,,0.0,处,0.0,,0.0,,202040101,,,,,1,,0.0,,,拆除镀锌钢管、切管、套丝、上零件、试水。,,1.0,0,0.0,,,,604,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 1、室内外给水镀锌钢管修理
- 604,604,605,2-306,室内外给水镀锌钢管修理 公称直径(mm以内) 100,,0,79.51,0.0,70.4,30.27,43.0,9.86,14.0,0.0,149.91,190.04,,0.0,处,0.0,,0.0,,202040101,,,,,1,,0.0,,,拆除镀锌钢管、切管、套丝、上零件、试水。,,1.0,0,0.0,,,,605,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 1、室内外给水镀锌钢管修理
- 605,605,606,2-307,给水管道零件调换 公称直径(mm以内) 15,,0,0.15,0.0,6.16,2.65,43.0,0.86,14.0,0.0,6.31,9.82,,0.0,只,0.0,,0.0,,202040102,,,,,1,,0.0,,,切管、以旧换新、套丝、加装零件。,,1.0,0,0.0,,,,606,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 2、给水管道零件调换
- 606,606,607,2-308,给水管道零件调换 公称直径(mm以内) 20,,0,0.15,0.0,6.16,2.65,43.0,0.86,14.0,0.0,6.31,9.82,,0.0,只,0.0,,0.0,,202040102,,,,,1,,0.0,,,切管、以旧换新、套丝、加装零件。,,1.0,0,0.0,,,,607,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 2、给水管道零件调换
- 607,607,608,2-309,给水管道零件调换 公称直径(mm以内) 25,,0,0.2,0.0,7.92,3.41,43.0,1.11,14.0,0.0,8.12,12.64,,0.0,只,0.0,,0.0,,202040102,,,,,1,,0.0,,,切管、以旧换新、套丝、加装零件。,,1.0,0,0.0,,,,608,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 2、给水管道零件调换
- 608,608,609,2-310,给水管道零件调换 公称直径(mm以内) 32,,0,0.2,0.0,7.92,3.41,43.0,1.11,14.0,0.0,8.12,12.64,,0.0,只,0.0,,0.0,,202040102,,,,,1,,0.0,,,切管、以旧换新、套丝、加装零件。,,1.0,0,0.0,,,,609,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 2、给水管道零件调换
- 609,609,610,2-311,给水管道零件调换 公称直径(mm以内) 40,,0,0.3,0.0,10.12,4.35,43.0,1.42,14.0,0.0,10.42,16.19,,0.0,只,0.0,,0.0,,202040102,,,,,1,,0.0,,,切管、以旧换新、套丝、加装零件。,,1.0,0,0.0,,,,610,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 2、给水管道零件调换
- 610,610,611,2-312,给水管道零件调换 公称直径(mm以内) 50,,0,0.3,0.0,10.12,4.35,43.0,1.42,14.0,0.0,10.42,16.19,,0.0,只,0.0,,0.0,,202040102,,,,,1,,0.0,,,切管、以旧换新、套丝、加装零件。,,1.0,0,0.0,,,,611,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 一、给水管 2、给水管道零件调换
- 611,611,612,2-313,铸铁排水管门盖修理 修盖门公称直径(mm以内) 50,,0,0.6,0.0,17.6,7.57,43.0,2.46,14.0,0.0,18.2,28.23,,0.0,个,0.0,,0.0,,202040201,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,612,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 1、铸铁排水管门盖修理
- 612,612,613,2-314,铸铁排水管门盖修理 修盖门公称直径(mm以内) 100,,0,0.83,0.0,22.0,9.46,43.0,3.08,14.0,0.0,22.83,35.37,,0.0,个,0.0,,0.0,,202040201,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,613,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 1、铸铁排水管门盖修理
- 613,613,614,2-315,铸铁排水管门盖修理 修盖门公称直径(mm以内) 150,,0,1.2,0.0,26.4,11.35,43.0,3.7,14.0,0.0,27.6,42.65,,0.0,个,0.0,,0.0,,202040201,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,614,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 1、铸铁排水管门盖修理
- 614,614,615,2-316,铸铁排水管道配件调换 公称直径(mm以内) 50,,0,0.45,0.0,22.0,9.46,43.0,3.08,14.0,0.0,22.45,34.99,,0.0,个,0.0,,0.0,,202040202,,,,,1,,0.0,,,拆换铸铁管件、锯管、接口、固定、试水。,,1.0,0,0.0,,,,615,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 2、铸铁排水管道配件调换
- 615,615,616,2-317,铸铁排水管道配件调换 公称直径(mm以内) 75,,0,0.5,0.0,26.4,11.35,43.0,3.7,14.0,0.0,26.9,41.95,,0.0,个,0.0,,0.0,,202040202,,,,,1,,0.0,,,拆换铸铁管件、锯管、接口、固定、试水。,,1.0,0,0.0,,,,616,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 2、铸铁排水管道配件调换
- 616,616,617,2-318,铸铁排水管道配件调换 公称直径(mm以内) 100,,0,0.75,0.0,39.6,17.03,43.0,5.54,14.0,0.0,40.35,62.92,,0.0,个,0.0,,0.0,,202040202,,,,,1,,0.0,,,拆换铸铁管件、锯管、接口、固定、试水。,,1.0,0,0.0,,,,617,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 2、铸铁排水管道配件调换
- 617,617,618,2-319,铸铁排水管道配件调换 公称直径(mm以内) 150,,0,1.05,0.0,61.6,26.49,43.0,8.62,14.0,0.0,62.65,97.76,,0.0,个,0.0,,0.0,,202040202,,,,,1,,0.0,,,拆换铸铁管件、锯管、接口、固定、试水。,,1.0,0,0.0,,,,618,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 2、铸铁排水管道配件调换
- 618,618,619,2-320,铸铁管墙箍 砖墙,,0,10.15,0.0,6.6,2.84,43.0,0.92,14.0,0.0,16.75,20.51,,0.0,付,0.0,,0.0,,202040203,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,619,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 3、调换铸铁管墙箍、吊箍
- 619,619,620,2-321,铸铁管墙箍 混凝土墙,,0,10.15,0.0,8.8,3.78,43.0,1.23,14.0,0.0,18.95,23.96,,0.0,付,0.0,,0.0,,202040203,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,620,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 3、调换铸铁管墙箍、吊箍
- 620,620,621,2-322,铸铁管吊箍 公称直径(mm以内) 50,,0,8.15,0.0,8.8,3.78,43.0,1.23,14.0,0.0,16.95,21.96,,0.0,付,0.0,,0.0,,202040203,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,621,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 3、调换铸铁管墙箍、吊箍
- 621,621,622,2-323,铸铁管吊箍 公称直径(mm以内) 100,,0,8.15,0.0,11.0,4.73,43.0,1.54,14.0,0.0,19.15,25.42,,0.0,付,0.0,,0.0,,202040203,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,622,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 3、调换铸铁管墙箍、吊箍
- 622,622,623,2-324,铸铁管吊箍 公称直径(mm以内) 150,,0,8.15,0.0,13.2,5.68,43.0,1.85,14.0,0.0,21.35,28.88,,0.0,付,0.0,,0.0,,202040203,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,623,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 3、调换铸铁管墙箍、吊箍
- 623,623,624,2-325,铸铁排水管疏通 公称直径(mm以内) 50,,0,0.0,0.0,11.0,4.73,43.0,1.54,14.0,0.0,11.0,17.27,,0.0,处,0.0,,0.0,,202040204,,,,,1,,0.0,,,用橡皮手掀泵(皮拔)或拆门盖疏通。,,1.0,0,0.0,,,,624,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 4、承插铸铁排水管疏通及重新捻口
- 624,624,625,2-326,铸铁排水管疏通 公称直径(mm以内) 100,,0,0.0,0.0,13.2,5.68,43.0,1.85,14.0,0.0,13.2,20.73,,0.0,处,0.0,,0.0,,202040204,,,,,1,,0.0,,,用橡皮手掀泵(皮拔)或拆门盖疏通。,,1.0,0,0.0,,,,625,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 4、承插铸铁排水管疏通及重新捻口
- 625,625,626,2-327,铸铁排水管疏通 公称直径(mm以内) 150,,0,0.0,0.0,14.52,6.24,43.0,2.03,14.0,0.0,14.52,22.79,,0.0,处,0.0,,0.0,,202040204,,,,,1,,0.0,,,用橡皮手掀泵(皮拔)或拆门盖疏通。,,1.0,0,0.0,,,,626,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 4、承插铸铁排水管疏通及重新捻口
- 626,626,627,2-328,接口渗漏重新捻口,,0,0.33,0.0,8.8,3.78,43.0,1.23,14.0,0.0,9.13,14.14,,0.0,处,0.0,,0.0,,202040204,,,,,1,,0.0,,,用橡皮手掀泵(皮拔)或拆门盖疏通。,,1.0,0,0.0,,,,627,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 4、承插铸铁排水管疏通及重新捻口
- 627,627,628,2-329,铸铁上水管断管加三通 公称直径(mm以内) 75,,0,27.68,0.0,180.84,77.76,43.0,25.32,14.0,0.0,208.52,311.6,,0.0,组,0.0,,0.0,,202040205,,,,,1,,0.0,,,关阀门、掏泄水、清沟底、断管加三通、打麻、调制接口材料、捻口、养护、水压试验。,,1.0,0,0.0,,,,628,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 5、铸铁上水管断管加三通
- 628,628,629,2-330,铸铁上水管断管加三通 公称直径(mm以内) 100,,0,47.61,0.0,220.0,94.6,43.0,30.8,14.0,0.0,267.61,393.01,,0.0,组,0.0,,0.0,,202040205,,,,,1,,0.0,,,关阀门、掏泄水、清沟底、断管加三通、打麻、调制接口材料、捻口、养护、水压试验。,,1.0,0,0.0,,,,629,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 5、铸铁上水管断管加三通
- 629,629,630,2-331,铸铁上水管断管加三通 公称直径(mm以内) 150,,0,65.13,0.0,281.16,120.9,43.0,39.36,14.0,0.0,346.29,506.55,,0.0,组,0.0,,0.0,,202040205,,,,,1,,0.0,,,关阀门、掏泄水、清沟底、断管加三通、打麻、调制接口材料、捻口、养护、水压试验。,,1.0,0,0.0,,,,630,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 5、铸铁上水管断管加三通
- 630,630,631,2-332,铸铁上水管断管加三通 公称直径(mm以内) 200,,0,85.26,0.0,361.24,155.33,43.0,50.57,14.0,0.0,446.5,652.4,,0.0,组,0.0,,0.0,,202040205,,,,,1,,0.0,,,关阀门、掏泄水、清沟底、断管加三通、打麻、调制接口材料、捻口、养护、水压试验。,,1.0,0,0.0,,,,631,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 5、铸铁上水管断管加三通
- 631,631,632,2-333,铸铁上水管打眼加分水卡子 公称直径(mm以内) 100×50以内,,0,1.0,0.0,50.6,21.76,43.0,7.08,14.0,0.0,51.6,80.44,,0.0,套,0.0,,0.0,,202040206,,,,,1,,0.0,,,关阀门、掏泄水、清沟底、钻眼、制加垫、装卡子、水压试验。,,1.0,0,0.0,,,,632,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 6、铸铁上水管打眼加分水卡子
- 632,632,633,2-334,铸铁上水管打眼加分水卡子 公称直径(mm以内) 200×70以内,,0,1.2,0.0,74.36,31.97,43.0,10.41,14.0,0.0,75.56,117.94,,0.0,套,0.0,,0.0,,202040206,,,,,1,,0.0,,,关阀门、掏泄水、清沟底、钻眼、制加垫、装卡子、水压试验。,,1.0,0,0.0,,,,633,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 6、铸铁上水管打眼加分水卡子
- 633,633,634,2-335,塑料排水管修理 公称直径(mm以内) 50,,0,2.06,0.0,34.32,14.76,43.0,4.8,14.0,0.0,36.38,55.94,,0.0,处,0.0,,0.0,,202040207,,,,,1,,0.0,,,拆除塑料管、包括加装管件在内。,,1.0,0,0.0,,,,634,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 7、塑料排水管修理
- 634,634,635,2-336,塑料排水管修理 公称直径(mm以内) 75,,0,2.8,0.0,40.92,17.6,43.0,5.73,14.0,0.0,43.72,67.05,,0.0,处,0.0,,0.0,,202040207,,,,,1,,0.0,,,拆除塑料管、包括加装管件在内。,,1.0,0,0.0,,,,635,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 7、塑料排水管修理
- 635,635,636,2-337,塑料排水管修理 公称直径(mm以内) 100,,0,4.77,0.0,47.96,20.62,43.0,6.71,14.0,0.0,52.73,80.06,,0.0,处,0.0,,0.0,,202040207,,,,,1,,0.0,,,拆除塑料管、包括加装管件在内。,,1.0,0,0.0,,,,636,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 7、塑料排水管修理
- 636,636,637,2-338,塑料排水管修理 公称直径(mm以内) 150,,0,5.51,0.0,61.6,26.49,43.0,8.62,14.0,0.0,67.11,102.22,,0.0,处,0.0,,0.0,,202040207,,,,,1,,0.0,,,拆除塑料管、包括加装管件在内。,,1.0,0,0.0,,,,637,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 二、排水管 7、塑料排水管修理
- 637,637,638,2-339,螺纹阀门调换 公称直径(mm以内) 15,,0,4.13,0.0,5.72,2.46,43.0,0.8,14.0,0.0,9.85,13.11,,0.0,个,0.0,,0.0,,202040301,,,,,1,,0.0,,,拆旧装新、试水、包括加装活接头。,,1.0,0,0.0,,,,638,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 1、螺纹阀门调换
- 638,638,639,2-340,螺纹阀门调换 公称直径(mm以内) 20,,0,5.06,0.0,5.72,2.46,43.0,0.8,14.0,0.0,10.78,14.04,,0.0,个,0.0,,0.0,,202040301,,,,,1,,0.0,,,拆旧装新、试水、包括加装活接头。,,1.0,0,0.0,,,,639,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 1、螺纹阀门调换
- 639,639,640,2-341,螺纹阀门调换 公称直径(mm以内) 25,,0,7.05,0.0,7.48,3.22,43.0,1.05,14.0,0.0,14.53,18.8,,0.0,个,0.0,,0.0,,202040301,,,,,1,,0.0,,,拆旧装新、试水、包括加装活接头。,,1.0,0,0.0,,,,640,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 1、螺纹阀门调换
- 640,640,641,2-342,螺纹阀门调换 公称直径(mm以内) 32,,0,9.86,0.0,8.36,3.59,43.0,1.17,14.0,0.0,18.22,22.98,,0.0,个,0.0,,0.0,,202040301,,,,,1,,0.0,,,拆旧装新、试水、包括加装活接头。,,1.0,0,0.0,,,,641,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 1、螺纹阀门调换
- 641,641,642,2-343,螺纹阀门调换 公称直径(mm以内) 40,,0,13.45,0.0,15.84,6.81,43.0,2.22,14.0,0.0,29.29,38.32,,0.0,个,0.0,,0.0,,202040301,,,,,1,,0.0,,,拆旧装新、试水、包括加装活接头。,,1.0,0,0.0,,,,642,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 1、螺纹阀门调换
- 642,642,643,2-344,螺纹阀门调换 公称直径(mm以内) 50,,0,17.88,0.0,15.84,6.81,43.0,2.22,14.0,0.0,33.72,42.75,,0.0,个,0.0,,0.0,,202040301,,,,,1,,0.0,,,拆旧装新、试水、包括加装活接头。,,1.0,0,0.0,,,,643,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 1、螺纹阀门调换
- 643,643,644,2-345,浮球阀新装 公称直径(mm以内) 15,,0,0.15,0.0,3.96,1.7,43.0,0.55,14.0,0.0,4.11,6.36,,0.0,个,0.0,,0.0,,202040302,,,,,1,,0.0,,,切管、套丝、安装、水压试验。,,1.0,0,0.0,,,,644,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 2、浮球阀新装
- 644,644,645,2-346,浮球阀新装 公称直径(mm以内) 20,,0,0.15,0.0,3.96,1.7,43.0,0.55,14.0,0.0,4.11,6.36,,0.0,个,0.0,,0.0,,202040302,,,,,1,,0.0,,,切管、套丝、安装、水压试验。,,1.0,0,0.0,,,,645,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 2、浮球阀新装
- 645,645,646,2-347,浮球阀新装 公称直径(mm以内) 25,,0,0.15,0.0,4.84,2.08,43.0,0.68,14.0,0.0,4.99,7.75,,0.0,个,0.0,,0.0,,202040302,,,,,1,,0.0,,,切管、套丝、安装、水压试验。,,1.0,0,0.0,,,,646,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 2、浮球阀新装
- 646,646,647,2-348,浮球阀新装 公称直径(mm以内) 32,,0,0.3,0.0,5.72,2.46,43.0,0.8,14.0,0.0,6.02,9.28,,0.0,个,0.0,,0.0,,202040302,,,,,1,,0.0,,,切管、套丝、安装、水压试验。,,1.0,0,0.0,,,,647,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 2、浮球阀新装
- 647,647,648,2-349,浮球阀新装 公称直径(mm以内) 40,,0,0.3,0.0,10.12,4.35,43.0,1.42,14.0,0.0,10.42,16.19,,0.0,个,0.0,,0.0,,202040302,,,,,1,,0.0,,,切管、套丝、安装、水压试验。,,1.0,0,0.0,,,,648,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 2、浮球阀新装
- 648,648,649,2-350,浮球阀新装 公称直径(mm以内) 50,,0,0.45,0.0,10.12,4.35,43.0,1.42,14.0,0.0,10.57,16.34,,0.0,个,0.0,,0.0,,202040302,,,,,1,,0.0,,,切管、套丝、安装、水压试验。,,1.0,0,0.0,,,,649,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 2、浮球阀新装
- 649,649,650,2-351,浮球阀调换 公称直径(mm以内) 15,,0,0.08,0.0,5.72,2.46,43.0,0.8,14.0,0.0,5.8,9.06,,0.0,个,0.0,,0.0,,202040303,,,,,1,,0.0,,,调换浮球阀、试水。,,1.0,0,0.0,,,,650,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 3、浮球阀调换
- 650,650,651,2-352,浮球阀调换 公称直径(mm以内) 20,,0,0.08,0.0,5.72,2.46,43.0,0.8,14.0,0.0,5.8,9.06,,0.0,个,0.0,,0.0,,202040303,,,,,1,,0.0,,,调换浮球阀、试水。,,1.0,0,0.0,,,,651,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 3、浮球阀调换
- 651,651,652,2-353,浮球阀调换 公称直径(mm以内) 25,,0,0.09,0.0,7.48,3.22,43.0,1.05,14.0,0.0,7.57,11.84,,0.0,个,0.0,,0.0,,202040303,,,,,1,,0.0,,,调换浮球阀、试水。,,1.0,0,0.0,,,,652,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 3、浮球阀调换
- 652,652,653,2-354,浮球阀调换 公称直径(mm以内) 32,,0,0.09,0.0,8.36,3.59,43.0,1.17,14.0,0.0,8.45,13.21,,0.0,个,0.0,,0.0,,202040303,,,,,1,,0.0,,,调换浮球阀、试水。,,1.0,0,0.0,,,,653,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 3、浮球阀调换
- 653,653,654,2-355,浮球阀调换 公称直径(mm以内) 50,,0,0.09,0.0,14.96,6.43,43.0,2.09,14.0,0.0,15.05,23.57,,0.0,个,0.0,,0.0,,202040303,,,,,1,,0.0,,,调换浮球阀、试水。,,1.0,0,0.0,,,,654,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 3、浮球阀调换
- 654,654,655,2-356,浮球阀换球修理 公称直径(mm以内) 15,,0,0.08,0.0,3.08,1.32,43.0,0.43,14.0,0.0,3.16,4.91,,0.0,个,0.0,,0.0,,202040304,,,,,1,,0.0,,,调换浮球阀、试水。,,1.0,0,0.0,,,,655,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 4、浮球阀换球修理
- 655,655,656,2-357,浮球阀换球修理 公称直径(mm以内) 20,,0,0.08,0.0,3.08,1.32,43.0,0.43,14.0,0.0,3.16,4.91,,0.0,个,0.0,,0.0,,202040304,,,,,1,,0.0,,,调换浮球阀、试水。,,1.0,0,0.0,,,,656,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 4、浮球阀换球修理
- 656,656,657,2-358,浮球阀换球修理 公称直径(mm以内) 25,,0,0.09,0.0,3.96,1.7,43.0,0.55,14.0,0.0,4.05,6.3,,0.0,个,0.0,,0.0,,202040304,,,,,1,,0.0,,,调换浮球阀、试水。,,1.0,0,0.0,,,,657,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 4、浮球阀换球修理
- 657,657,658,2-359,浮球阀换球修理 公称直径(mm以内) 32,,0,0.09,0.0,6.6,2.84,43.0,0.92,14.0,0.0,6.69,10.45,,0.0,个,0.0,,0.0,,202040304,,,,,1,,0.0,,,调换浮球阀、试水。,,1.0,0,0.0,,,,658,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 4、浮球阀换球修理
- 658,658,659,2-360,浮球阀换球修理 公称直径(mm以内) 40,,0,0.09,0.0,7.48,3.22,43.0,1.05,14.0,0.0,7.57,11.84,,0.0,个,0.0,,0.0,,202040304,,,,,1,,0.0,,,调换浮球阀、试水。,,1.0,0,0.0,,,,659,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 4、浮球阀换球修理
- 659,659,660,2-361,角阀新装、调换、修理 公称直径(mm以内) 新装 15,,0,12.09,0.0,3.96,1.7,43.0,0.55,14.0,0.0,16.05,18.3,,0.0,个,0.0,,0.0,,202040305,,,,,1,,0.0,,,套丝、安装、拆旧装新、试水。,,1.0,0,0.0,,,,660,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 5、角阀新装、调换、修理
- 660,660,661,2-362,角阀新装、调换、修理 公称直径(mm以内) 调换 15,,0,12.09,0.0,5.72,2.46,43.0,0.8,14.0,0.0,17.81,21.07,,0.0,个,0.0,,0.0,,202040305,,,,,1,,0.0,,,套丝、安装、拆旧装新、试水。,,1.0,0,0.0,,,,661,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 5、角阀新装、调换、修理
- 661,661,662,2-363,角阀新装、调换、修理 公称直径(mm以内) 修理 15,,0,0.09,0.0,3.08,1.32,43.0,0.43,14.0,0.0,3.17,4.92,,0.0,个,0.0,,0.0,,202040305,,,,,1,,0.0,,,套丝、安装、拆旧装新、试水。,,1.0,0,0.0,,,,662,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 5、角阀新装、调换、修理
- 662,662,663,2-364,调换 公称直径(mm以内) 15,,0,71.45,0.0,18.04,7.76,43.0,2.53,14.0,0.0,89.49,99.78,,0.0,10个,0.0,,0.0,,202040305,,,,,10,,0.0,,,拆旧换新。,,1.0,0,0.0,,,,663,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 5、角阀新装、调换、修理
- 663,663,664,2-365,调换 公称直径(mm以内) 20,,0,77.51,0.0,18.04,7.76,43.0,2.53,14.0,0.0,95.55,105.84,,0.0,10个,0.0,,0.0,,202040305,,,,,10,,0.0,,,拆旧换新。,,1.0,0,0.0,,,,664,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 5、角阀新装、调换、修理
- 664,664,665,2-366,调换新装 公称直径(mm以内) 25,,0,152.25,0.0,23.32,10.03,43.0,3.26,14.0,0.0,175.57,188.86,,0.0,10个,0.0,,0.0,,202040305,,,,,10,,0.0,,,拆旧换新。,,1.0,0,0.0,,,,665,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 5、角阀新装、调换、修理
- 665,665,666,2-367,修理 公称直径(mm以内) 15,,0,2.65,0.0,6.6,2.84,43.0,0.92,14.0,0.0,9.25,13.01,,0.0,10个,0.0,,0.0,,202040305,,,,,10,,0.0,,,修橡皮芯或翻白、换上盖丝杆。,,1.0,0,0.0,,,,666,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 5、角阀新装、调换、修理
- 666,666,667,2-368,修理 公称直径(mm以内) 20,,0,3.15,0.0,6.6,2.84,43.0,0.92,14.0,0.0,9.75,13.51,,0.0,10个,0.0,,0.0,,202040305,,,,,10,,0.0,,,修橡皮芯或翻白、换上盖丝杆。,,1.0,0,0.0,,,,667,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 5、角阀新装、调换、修理
- 667,667,668,2-369,修理 公称直径(mm以内) 25,,0,3.95,0.0,6.6,2.84,43.0,0.92,14.0,0.0,10.55,14.31,,0.0,10个,0.0,,0.0,,202040305,,,,,10,,0.0,,,修橡皮芯或翻白、换上盖丝杆。,,1.0,0,0.0,,,,668,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 5、角阀新装、调换、修理
- 668,668,669,2-370,水表调换、水表克令 公称直径(mm以内) 15,,0,0.15,0.0,12.76,5.49,43.0,1.79,14.0,0.0,12.91,20.19,,0.0,个,0.0,,0.0,,202040306,,,,,1,,0.0,,,切管、套丝、加垫、安装、水压试验、拆旧装新。,,1.0,0,0.0,,,,669,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 6、水表调换、水表克令
- 669,669,670,2-371,水表调换、水表克令 公称直径(mm以内) 20,,0,0.15,0.0,12.76,5.49,43.0,1.79,14.0,0.0,12.91,20.19,,0.0,个,0.0,,0.0,,202040306,,,,,1,,0.0,,,切管、套丝、加垫、安装、水压试验、拆旧装新。,,1.0,0,0.0,,,,670,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 6、水表调换、水表克令
- 670,670,671,2-372,水表调换、水表克令 公称直径(mm以内) 25,,0,0.15,0.0,16.28,7.0,43.0,2.28,14.0,0.0,16.43,25.71,,0.0,个,0.0,,0.0,,202040306,,,,,1,,0.0,,,切管、套丝、加垫、安装、水压试验、拆旧装新。,,1.0,0,0.0,,,,671,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 6、水表调换、水表克令
- 671,671,672,2-373,水表调换、水表克令 公称直径(mm以内) 32,,0,0.15,0.0,18.04,7.76,43.0,2.53,14.0,0.0,18.19,28.48,,0.0,个,0.0,,0.0,,202040306,,,,,1,,0.0,,,切管、套丝、加垫、安装、水压试验、拆旧装新。,,1.0,0,0.0,,,,672,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 6、水表调换、水表克令
- 672,672,673,2-374,水表调换、水表克令 公称直径(mm以内) 40,,0,0.15,0.0,24.2,10.41,43.0,3.39,14.0,0.0,24.35,38.15,,0.0,个,0.0,,0.0,,202040306,,,,,1,,0.0,,,切管、套丝、加垫、安装、水压试验、拆旧装新。,,1.0,0,0.0,,,,673,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 6、水表调换、水表克令
- 673,673,674,2-375,水表调换、水表克令 公称直径(mm以内) 50,,0,0.15,0.0,30.8,13.24,43.0,4.31,14.0,0.0,30.95,48.5,,0.0,个,0.0,,0.0,,202040306,,,,,1,,0.0,,,切管、套丝、加垫、安装、水压试验、拆旧装新。,,1.0,0,0.0,,,,674,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 6、水表调换、水表克令
- 674,674,675,2-376,调换水表克令,,0,0.15,0.0,6.6,2.84,43.0,0.92,14.0,0.0,6.75,10.51,,0.0,个,0.0,,0.0,,202040306,,,,,1,,0.0,,,切管、套丝、加垫、安装、水压试验、拆旧装新。,,1.0,0,0.0,,,,675,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 三、阀门、水表修理 6、水表调换、水表克令
- 675,675,676,2-377,调换浴缸排水配件(铜),,0,0.3,0.0,22.0,9.46,43.0,3.08,14.0,0.0,22.3,34.84,,0.0,只,0.0,,0.0,,202040401,,,,,1,,0.0,,,拆旧装新、试水。修理:利用原物修漏补焊。,,1.0,0,0.0,,,,676,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 四、浴盆、淋浴器 1、浴盆零件调换、修理
- 676,676,677,2-378,调换浴缸利用原配件,,0,1.0,0.0,66.0,28.38,43.0,9.24,14.0,0.0,67.0,104.62,,0.0,只,0.0,,0.0,,202040401,,,,,1,,0.0,,,拆旧装新、试水。修理:利用原物修漏补焊。,,1.0,0,0.0,,,,677,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 四、浴盆、淋浴器 1、浴盆零件调换、修理
- 677,677,678,2-379,调换 浴缸莲蓬头、浴缸水嘴,,0,0.08,0.0,6.6,2.84,43.0,0.92,14.0,0.0,6.68,10.44,,0.0,只,0.0,,0.0,,202040401,,,,,1,,0.0,,,拆旧装新、试水。修理:利用原物修漏补焊。,,1.0,0,0.0,,,,678,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 四、浴盆、淋浴器 1、浴盆零件调换、修理
- 678,678,679,2-380,修理浴缸落水,,0,0.8,0.0,22.0,9.46,43.0,3.08,14.0,0.0,22.8,35.34,,0.0,只,0.0,,0.0,,202040401,,,,,1,,0.0,,,拆旧装新、试水。修理:利用原物修漏补焊。,,1.0,0,0.0,,,,679,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 四、浴盆、淋浴器 1、浴盆零件调换、修理
- 679,679,680,2-381,调换 面盆,,0,0.3,0.0,19.8,8.51,43.0,2.77,14.0,0.0,20.1,31.38,,0.0,只,0.0,,0.0,,202040501,,,,,1,,0.0,,,拆旧装新、试水。修理:修漏补焊。,,1.0,0,0.0,,,,680,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 五、面盆、洗涤盆 1、面盆、洗涤盆零件调换、修理
- 680,680,681,2-382,调换 面盆落水,,0,0.15,0.0,11.0,4.73,43.0,1.54,14.0,0.0,11.15,17.42,,0.0,只,0.0,,0.0,,202040501,,,,,1,,0.0,,,拆旧装新、试水。修理:修漏补焊。,,1.0,0,0.0,,,,681,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 五、面盆、洗涤盆 1、面盆、洗涤盆零件调换、修理
- 681,681,682,2-383,调换 面盆水嘴,,0,0.52,0.0,8.8,3.78,43.0,1.23,14.0,0.0,9.32,14.33,,0.0,只,0.0,,0.0,,202040501,,,,,1,,0.0,,,拆旧装新、试水。修理:修漏补焊。,,1.0,0,0.0,,,,682,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 五、面盆、洗涤盆 1、面盆、洗涤盆零件调换、修理
- 682,682,683,2-384,调换 面盆铜管,,0,0.15,0.0,6.6,2.84,43.0,0.92,14.0,0.0,6.75,10.51,,0.0,只,0.0,,0.0,,202040501,,,,,1,,0.0,,,拆旧装新、试水。修理:修漏补焊。,,1.0,0,0.0,,,,683,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 五、面盆、洗涤盆 1、面盆、洗涤盆零件调换、修理
- 683,683,684,2-385,调换 面盆生铁架,,0,0.15,0.0,22.0,9.46,43.0,3.08,14.0,0.0,22.15,34.69,,0.0,只,0.0,,0.0,,202040501,,,,,1,,0.0,,,调换:拆旧装新、试水。修理:修漏补焊。,,1.0,0,0.0,,,,684,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 五、面盆、洗涤盆 1、面盆、洗涤盆零件调换、修理
- 684,684,685,2-386,修理 面盆落水,,0,0.3,0.0,17.6,7.57,43.0,2.46,14.0,0.0,17.9,27.93,,0.0,只,0.0,,0.0,,202040501,,,,,1,,0.0,,,调换:拆旧装新、试水。修理:修漏补焊。,,1.0,0,0.0,,,,685,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 五、面盆、洗涤盆 1、面盆、洗涤盆零件调换、修理
- 685,685,686,2-387,洗涤盆调换,,0,0.3,0.0,17.6,7.57,43.0,2.46,14.0,0.0,17.9,27.93,,0.0,套,0.0,,0.0,,202040501,,,,,1,,0.0,,,调换:拆旧装新、试水。修理:修漏补焊。,,1.0,0,0.0,,,,686,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 五、面盆、洗涤盆 1、面盆、洗涤盆零件调换、修理
- 686,686,687,2-388,新装 尼龙下水栓Dg40,,0,10.59,0.0,6.6,2.84,43.0,0.92,14.0,0.0,17.19,20.95,,0.0,付,0.0,,0.0,,202040502,,,,,1,,0.0,,,安装、试水。调换:拆旧换新。,,1.0,0,0.0,,,,687,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 五、面盆、洗涤盆 2、水池落水新装、调换、疏通
- 687,687,688,2-389,调换 尼龙下水栓Dg40,,0,10.59,0.0,13.2,5.68,43.0,1.85,14.0,0.0,23.79,31.32,,0.0,付,0.0,,0.0,,202040502,,,,,1,,0.0,,,安装、试水。调换:拆旧换新。,,1.0,0,0.0,,,,688,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 五、面盆、洗涤盆 2、水池落水新装、调换、疏通
- 688,688,689,2-390,疏通水池 50,,0,0.3,0.0,8.8,3.78,43.0,1.23,14.0,0.0,9.1,14.11,,0.0,付,0.0,,0.0,,202040502,,,,,1,,0.0,,,安装、试水。调换:拆旧换新。,,1.0,0,0.0,,,,689,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 五、面盆、洗涤盆 2、水池落水新装、调换、疏通
- 689,689,690,2-391,疏通水池 100,,0,0.38,0.0,11.0,4.73,43.0,1.54,14.0,0.0,11.38,17.65,,0.0,付,0.0,,0.0,,202040502,,,,,1,,0.0,,,安装、试水。调换:拆旧换新。,,1.0,0,0.0,,,,690,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 五、面盆、洗涤盆 2、水池落水新装、调换、疏通
- 690,690,691,2-392,调换蹲式大便器连水箱,,0,0.9,0.0,35.2,15.14,43.0,4.93,14.0,0.0,36.1,56.17,,0.0,只,0.0,,0.0,,202040601,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,691,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 1、大便器零件调换
- 691,691,692,2-393,调换坐式大便器 马桶座垫,,0,0.03,0.0,6.6,2.84,43.0,0.92,14.0,0.0,6.63,10.39,,0.0,只,0.0,,0.0,,202040601,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,692,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 1、大便器零件调换
- 692,692,693,2-394,调换坐式大便器 马桶盖圈,,0,0.08,0.0,8.8,3.78,43.0,1.23,14.0,0.0,8.88,13.89,,0.0,只,0.0,,0.0,,202040601,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,693,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 1、大便器零件调换
- 693,693,694,2-395,调换坐式大便器 马桶铰链(双),,0,0.08,0.0,8.8,3.78,43.0,1.23,14.0,0.0,8.88,13.89,,0.0,双,0.0,,0.0,,202040601,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,694,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 1、大便器零件调换
- 694,694,695,2-396,调换坐式大便器 马桶铰链(单),,0,0.08,0.0,6.6,2.84,43.0,0.92,14.0,0.0,6.68,10.44,,0.0,只,0.0,,0.0,,202040601,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,695,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 1、大便器零件调换
- 695,695,696,2-397,调换坐式大便器 马桶盖,,0,0.08,0.0,8.8,3.78,43.0,1.23,14.0,0.0,8.88,13.89,,0.0,只,0.0,,0.0,,202040601,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,696,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 1、大便器零件调换
- 696,696,697,2-398,挂式小便斗,,0,0.3,0.0,13.2,5.68,43.0,1.85,14.0,0.0,13.5,21.03,,0.0,只,0.0,,0.0,,202040602,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,697,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 2、小便器零件调换
- 697,697,698,2-399,立式小便斗,,0,1.5,0.0,22.0,9.46,43.0,3.08,14.0,0.0,23.5,36.04,,0.0,只,0.0,,0.0,,202040602,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,698,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 2、小便器零件调换
- 698,698,699,2-400,自落水胆,,0,0.08,0.0,6.6,2.84,43.0,0.92,14.0,0.0,6.68,10.44,,0.0,只,0.0,,0.0,,202040602,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,699,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 2、小便器零件调换
- 699,699,700,2-401,铅落水弯,,0,0.3,0.0,8.8,3.78,43.0,1.23,14.0,0.0,9.1,14.11,,0.0,只,0.0,,0.0,,202040602,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,700,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 2、小便器零件调换
- 700,700,701,2-402,进水铜管Φ13,,0,9.63,0.0,8.8,3.78,43.0,1.23,14.0,0.0,18.43,23.44,,0.0,只,0.0,,0.0,,202040602,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,701,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 2、小便器零件调换
- 701,701,702,2-403,调换 低水箱连铜活,,0,13.95,0.0,17.6,7.57,43.0,2.46,14.0,0.0,31.55,41.58,,0.0,套,0.0,,0.0,,202040603,,,,,1,,0.0,,,测位、打木榫、安装试水。调换:拆旧装新。,,1.0,0,0.0,,,,702,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 3、低水箱零件调换
- 702,702,703,2-404,调换 低水箱利用铜活,,0,0.3,0.0,17.6,7.57,43.0,2.46,14.0,0.0,17.9,27.93,,0.0,套,0.0,,0.0,,202040603,,,,,1,,0.0,,,测位、打木榫、安装试水。调换:拆旧装新。,,1.0,0,0.0,,,,703,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 3、低水箱零件调换
- 703,703,704,2-405,调换 低水箱铜活,,0,0.23,0.0,13.2,5.68,43.0,1.85,14.0,0.0,13.43,20.96,,0.0,套,0.0,,0.0,,202040603,,,,,1,,0.0,,,测位、打木榫、安装试水。调换:拆旧装新。,,1.0,0,0.0,,,,704,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 3、低水箱零件调换
- 704,704,705,2-406,调换坐式大便器 橡皮球,,0,3.03,0.0,4.4,1.89,43.0,0.62,14.0,0.0,7.43,9.94,,0.0,只,0.0,,0.0,,202040603,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,705,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 3、低水箱零件调换
- 705,705,706,2-407,调换坐式大便器 Φ13进水铜管,,0,9.63,0.0,6.6,2.84,43.0,0.92,14.0,0.0,16.23,19.99,,0.0,只,0.0,,0.0,,202040603,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,706,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 3、低水箱零件调换
- 706,706,707,2-408,调换坐式大便器 落水连角尺弯,,0,28.65,0.0,17.6,7.57,43.0,2.46,14.0,0.0,46.25,56.28,,0.0,只,0.0,,0.0,,202040603,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,707,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 3、低水箱零件调换
- 707,707,708,2-409,调换坐式大便器 角尺弯,,0,3.65,0.0,8.8,3.78,43.0,1.23,14.0,0.0,12.45,17.46,,0.0,只,0.0,,0.0,,202040603,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,708,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 3、低水箱零件调换
- 708,708,709,2-410,低水箱把手,,0,4.15,0.0,4.4,1.89,43.0,0.62,14.0,0.0,8.55,11.06,,0.0,只,0.0,,0.0,,202040603,,,,,1,,0.0,,,拆旧装新。,,1.0,0,0.0,,,,709,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 3、低水箱零件调换
- 709,709,710,2-411,调换 瓷高水箱连铜活,,0,54.3,0.0,17.6,7.57,43.0,2.46,14.0,0.0,71.9,81.93,,0.0,组,0.0,,0.0,,202040604,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,710,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 4、高水箱零件调换
- 710,710,711,2-412,调换 瓷高水箱利用原铜活,,0,0.15,0.0,22.0,9.46,43.0,3.08,14.0,0.0,22.15,34.69,,0.0,组,0.0,,0.0,,202040604,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,711,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 4、高水箱零件调换
- 711,711,712,2-413,调换 高水箱落水长管,,0,6.2,0.0,11.0,4.73,43.0,1.54,14.0,0.0,17.2,23.47,,0.0,组,0.0,,0.0,,202040604,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,712,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 4、高水箱零件调换
- 712,712,713,2-414,调换 高水箱拉手,,0,4.24,0.0,4.4,1.89,43.0,0.62,14.0,0.0,8.64,11.15,,0.0,组,0.0,,0.0,,202040604,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,713,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 4、高水箱零件调换
- 713,713,714,2-415,调换 高水箱落水,,0,18.15,0.0,8.8,3.78,43.0,1.23,14.0,0.0,26.95,31.96,,0.0,只,0.0,,0.0,,202040604,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,714,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 4、高水箱零件调换
- 714,714,715,2-416,调换 橡皮吸水球,,0,6.23,0.0,8.8,3.78,43.0,1.23,14.0,0.0,15.03,20.04,,0.0,只,0.0,,0.0,,202040604,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,715,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 4、高水箱零件调换
- 715,715,716,2-417,调换 羊皮,,0,0.08,0.0,11.0,4.73,43.0,1.54,14.0,0.0,11.08,17.35,,0.0,只,0.0,,0.0,,202040604,,,,,1,,0.0,,,拆旧装新、试水。,,1.0,0,0.0,,,,716,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 4、高水箱零件调换
- 716,716,717,2-418,新装 大便槽自动冲水箱 30公升,,0,136.52,0.0,22.44,9.65,43.0,3.14,14.0,0.0,158.96,171.75,,0.0,套,0.0,,0.0,,202040605,,,,,1,,0.0,,,新装:留堵洞眼、栽托架、切管、套丝、安装水箱、试水。,,1.0,0,0.0,,,,717,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 5、新装、调换大便槽自动冲水箱
- 717,717,718,2-419,新装 大便槽自动冲水箱 68公升,,0,144.52,0.0,22.44,9.65,43.0,3.14,14.0,0.0,166.96,179.75,,0.0,套,0.0,,0.0,,202040605,,,,,1,,0.0,,,新装:留堵洞眼、栽托架、切管、套丝、安装水箱、试水。,,1.0,0,0.0,,,,718,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 5、新装、调换大便槽自动冲水箱
- 718,718,719,2-420,新装 大便槽自动冲水箱 83.6公升,,0,156.57,0.0,22.44,9.65,43.0,3.14,14.0,0.0,179.01,191.8,,0.0,套,0.0,,0.0,,202040605,,,,,1,,0.0,,,新装:留堵洞眼、栽托架、切管、套丝、安装水箱、试水。,,1.0,0,0.0,,,,719,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 5、新装、调换大便槽自动冲水箱
- 719,719,720,2-421,调换 大便槽自动冲水箱 30公升,,0,16.0,0.0,33.88,14.57,43.0,4.74,14.0,0.0,49.88,69.19,,0.0,套,0.0,,0.0,,202040605,,,,,1,,0.0,,,调换:拆旧换新。,,1.0,0,0.0,,,,720,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 5、新装、调换大便槽自动冲水箱
- 720,720,721,2-422,调换 大便槽自动冲水箱 68公升,,0,16.0,0.0,33.88,14.57,43.0,4.74,14.0,0.0,49.88,69.19,,0.0,套,0.0,,0.0,,202040605,,,,,1,,0.0,,,调换:拆旧换新。,,1.0,0,0.0,,,,721,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 5、新装、调换大便槽自动冲水箱
- 721,721,722,2-423,调换 大便槽自动冲水箱 83.6公升,,0,16.3,0.0,33.88,14.57,43.0,4.74,14.0,0.0,50.18,69.49,,0.0,套,0.0,,0.0,,202040605,,,,,1,,0.0,,,调换:拆旧换新。,,1.0,0,0.0,,,,722,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 5、新装、调换大便槽自动冲水箱
- 722,722,723,2-424,新装小便斗(槽)自动冲水箱 4公升,,0,41.45,0.0,13.2,5.68,43.0,1.85,14.0,0.0,54.65,62.18,,0.0,套,0.0,,0.0,,202040606,,,,,1,,0.0,,,新装:测位、安装、试水。,,1.0,0,0.0,,,,723,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 6、新装、调换小便斗(槽)自动冲水箱
- 723,723,724,2-425,新装小便斗(槽)自动冲水箱 8公升,,0,43.53,0.0,13.2,5.68,43.0,1.85,14.0,0.0,56.73,64.26,,0.0,套,0.0,,0.0,,202040606,,,,,1,,0.0,,,新装:测位、安装、试水。,,1.0,0,0.0,,,,724,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 6、新装、调换小便斗(槽)自动冲水箱
- 724,724,725,2-426,新装小便斗(槽)自动冲水箱 12公升,,0,54.6,0.0,44.0,18.92,43.0,6.16,14.0,0.0,98.6,123.68,,0.0,套,0.0,,0.0,,202040606,,,,,1,,0.0,,,新装:测位、安装、试水。,,1.0,0,0.0,,,,725,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 6、新装、调换小便斗(槽)自动冲水箱
- 725,725,726,2-427,调换小便斗(槽)自动冲水箱 4公升,,0,12.6,0.0,13.2,5.68,43.0,1.85,14.0,0.0,25.8,33.33,,0.0,套,0.0,,0.0,,202040606,,,,,1,,0.0,,,调换:拆旧换新、试水。,,1.0,0,0.0,,,,726,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 6、新装、调换小便斗(槽)自动冲水箱
- 726,726,727,2-428,调换小便斗(槽)自动冲水箱 8公升,,0,12.6,0.0,13.2,5.68,43.0,1.85,14.0,0.0,25.8,33.33,,0.0,套,0.0,,0.0,,202040606,,,,,1,,0.0,,,调换:拆旧换新、试水。,,1.0,0,0.0,,,,727,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 6、新装、调换小便斗(槽)自动冲水箱
- 727,727,728,2-429,调换小便斗(槽)自动冲水箱 12公升,,0,12.9,0.0,33.0,14.19,43.0,4.62,14.0,0.0,45.9,64.71,,0.0,套,0.0,,0.0,,202040606,,,,,1,,0.0,,,调换:拆旧换新、试水。,,1.0,0,0.0,,,,728,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 六、大便器、小便器、水箱调换修理 6、新装、调换小便斗(槽)自动冲水箱
- 728,728,729,2-430,调换地漏 50,,0,0.15,0.0,10.12,4.35,43.0,1.42,14.0,0.0,10.27,16.04,,0.0,个,0.0,,0.0,,202040701,,,,,1,,0.0,,,调换:拆旧换新、试水。,,1.0,0,0.0,,,,729,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 七、地漏调换、供水箱清洗 1、调换地漏
- 729,729,730,2-431,调换地漏 100,,0,0.24,0.0,23.32,10.03,43.0,3.26,14.0,0.0,23.56,36.85,,0.0,个,0.0,,0.0,,202040701,,,,,1,,0.0,,,调换:拆旧换新、试水。,,1.0,0,0.0,,,,730,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 七、地漏调换、供水箱清洗 1、调换地漏
- 730,730,731,2-432,混凝土或铁板水箱 5m3下,,0,5.4,0.0,52.8,22.7,43.0,7.39,14.0,0.0,58.2,88.29,,0.0,只,0.0,,0.0,,202040702,,,,,1,,0.0,,,放水、清除底部垃圾、铲水垢、试水。,,1.0,0,0.0,,,,731,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 七、地漏调换、供水箱清洗 2、供水箱清洗
- 731,731,732,2-433,混凝土或铁板水箱 5m3上,,0,13.5,0.0,88.0,37.84,43.0,12.32,14.0,0.0,101.5,151.66,,0.0,只,0.0,,0.0,,202040702,,,,,1,,0.0,,,放水、清除底部垃圾、铲水垢、试水。,,1.0,0,0.0,,,,732,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 七、地漏调换、供水箱清洗 2、供水箱清洗
- 732,732,733,2-434,砖墙透眼 1/2墙,,0,0.15,0.0,3.52,1.51,43.0,0.49,14.0,0.0,3.67,5.67,,0.0,个,0.0,,0.0,,202040801,,,,,1,,0.0,,,测位、划线、打眼、调合填料、找正、补平。,,1.0,0,0.0,,,,733,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 1、凿砖墙及混凝土墙洞
- 733,733,734,2-435,砖墙透眼 1砖或乱砖墙,,0,0.15,0.0,6.6,2.84,43.0,0.92,14.0,0.0,6.75,10.51,,0.0,个,0.0,,0.0,,202040801,,,,,1,,0.0,,,测位、划线、打眼、调合填料、找正、补平。,,1.0,0,0.0,,,,734,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 1、凿砖墙及混凝土墙洞
- 734,734,735,2-436,砖墙透眼 1 1/2砖墙,,0,0.15,0.0,8.8,3.78,43.0,1.23,14.0,0.0,8.95,13.96,,0.0,个,0.0,,0.0,,202040801,,,,,1,,0.0,,,测位、划线、打眼、调合填料、找正、补平。,,1.0,0,0.0,,,,735,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 1、凿砖墙及混凝土墙洞
- 735,735,736,2-437,砖墙透眼 砖墙基础,,0,0.23,0.0,13.2,5.68,43.0,1.85,14.0,0.0,13.43,20.96,,0.0,个,0.0,,0.0,,202040801,,,,,1,,0.0,,,测位、划线、打眼、调合填料、找正、补平。,,1.0,0,0.0,,,,736,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 1、凿砖墙及混凝土墙洞
- 736,736,737,2-438,砖墙半眼 直径×厚度(mm) Φ30×50,,0,0.15,0.0,1.32,0.57,43.0,0.18,14.0,0.0,1.47,2.22,,0.0,个,0.0,,0.0,,202040801,,,,,1,,0.0,,,测位、划线、打眼、调合填料、找正、补平。,,1.0,0,0.0,,,,737,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 1、凿砖墙及混凝土墙洞
- 737,737,738,2-439,砖墙半眼 直径×厚度(mm) Φ50×80,,0,0.15,0.0,2.2,0.95,43.0,0.31,14.0,0.0,2.35,3.61,,0.0,个,0.0,,0.0,,202040801,,,,,1,,0.0,,,测位、划线、打眼、调合填料、找正、补平。,,1.0,0,0.0,,,,738,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 1、凿砖墙及混凝土墙洞
- 738,738,739,2-440,混凝土墙透眼 厚度(mm以内) 120,,0,0.23,0.0,11.0,4.73,43.0,1.54,14.0,0.0,11.23,17.5,,0.0,个,0.0,,0.0,,202040801,,,,,1,,0.0,,,测位、划线、打眼、调合填料、找正、补平。,,1.0,0,0.0,,,,739,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 1、凿砖墙及混凝土墙洞
- 739,739,740,2-441,混凝土墙透眼 厚度(mm以内) 250,,0,0.23,0.0,15.4,6.62,43.0,2.16,14.0,0.0,15.63,24.41,,0.0,个,0.0,,0.0,,202040801,,,,,1,,0.0,,,测位、划线、打眼、调合填料、找正、补平。,,1.0,0,0.0,,,,740,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 1、凿砖墙及混凝土墙洞
- 740,740,741,2-442,混凝土平板透眼 厚度(mm以内) 100,,0,0.23,0.0,11.0,4.73,43.0,1.54,14.0,0.0,11.23,17.5,,0.0,个,0.0,,0.0,,202040802,,,,,1,,0.0,,,测位、划线、打眼。,,1.0,0,0.0,,,,741,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 2、混凝土平板打透眼、半眼
- 741,741,742,2-443,混凝土平板透眼 厚度(mm以内) 150,,0,0.3,0.0,15.4,6.62,43.0,2.16,14.0,0.0,15.7,24.48,,0.0,个,0.0,,0.0,,202040802,,,,,1,,0.0,,,测位、划线、打眼。,,1.0,0,0.0,,,,742,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 2、混凝土平板打透眼、半眼
- 742,742,743,2-444,混凝土平板透眼 厚度(mm以内) 200,,0,0.38,0.0,22.0,9.46,43.0,3.08,14.0,0.0,22.38,34.92,,0.0,个,0.0,,0.0,,202040802,,,,,1,,0.0,,,测位、划线、打眼。,,1.0,0,0.0,,,,743,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 2、混凝土平板打透眼、半眼
- 743,743,744,2-445,混凝土多孔板 透眼厚120mm以内,,0,0.15,0.0,4.4,1.89,43.0,0.62,14.0,0.0,4.55,7.06,,0.0,个,0.0,,0.0,,202040802,,,,,1,,0.0,,,测位、划线、打眼。,,1.0,0,0.0,,,,744,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 2、混凝土平板打透眼、半眼
- 744,744,745,2-446,混凝土多孔板 半眼厚30mm以内,,0,0.08,0.0,2.2,0.95,43.0,0.31,14.0,0.0,2.28,3.54,,0.0,个,0.0,,0.0,,202040802,,,,,1,,0.0,,,测位、划线、打眼。,,1.0,0,0.0,,,,745,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 2、混凝土平板打透眼、半眼
- 745,745,746,2-447,开挖地面槽40×50cm 普通土路面,,0,0.0,0.0,8.8,3.78,43.0,1.23,14.0,0.0,8.8,13.81,,0.0,m,0.0,,0.0,,202040803,,,,,1,,0.0,,,开挖、回填、夯实。,,1.0,0,0.0,,,,746,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 3、开凿地面槽、打墙洞
- 746,746,747,2-448,开挖地面槽40×50cm 弹石路面,,0,0.0,0.0,11.0,4.73,43.0,1.54,14.0,0.0,11.0,17.27,,0.0,m,0.0,,0.0,,202040803,,,,,1,,0.0,,,开挖、回填、夯实。,,1.0,0,0.0,,,,747,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 3、开凿地面槽、打墙洞
- 747,747,748,2-449,开挖地面槽40×50cm 混凝土路面,,0,0.0,0.0,15.4,6.62,43.0,2.16,14.0,0.0,15.4,24.18,,0.0,m,0.0,,0.0,,202040803,,,,,1,,0.0,,,开挖、回填、夯实。,,1.0,0,0.0,,,,748,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 3、开凿地面槽、打墙洞
- 748,748,749,2-450,凿半砖墙洞,,0,0.0,0.0,52.8,22.7,43.0,7.39,14.0,0.0,52.8,82.89,,0.0,m2,0.0,,0.0,,202040803,,,,,1,,0.0,,,开挖、回填、夯实。,,1.0,0,0.0,,,,749,第二章 给排水工程 第四节 管道、阀门、低压器具、卫生器具维修 八、零星项目 3、开凿地面槽、打墙洞
- 749,749,750,3-1,圆形风管直径/方矩形风管周长(mm以内) 360/1200,,0,0.3,1.16,83.6,35.95,43.0,11.7,14.0,0.0,85.06,132.71,,0.0,10m2,0.0,,0.0,,203010101,,,,,10,,0.0,,,拆除风管、管件、托吊卡件、调节阀门、保温层运至指定地点、清理拆除现场。,,1.0,0,0.0,,,,750,第三章 通风空调 第一节 拆除工程 一、风管拆除 1、风管拆除 (δ=1.5mm以内、咬口)
- 750,750,751,3-2,圆形风管直径/方矩形风管周长(mm以内) 800/2400,,0,0.25,0.92,88.0,37.84,43.0,12.32,14.0,0.0,89.17,139.33,,0.0,10m2,0.0,,0.0,,203010101,,,,,10,,0.0,,,拆除风管、管件、托吊卡件、调节阀门、保温层运至指定地点、清理拆除现场。,,1.0,0,0.0,,,,751,第三章 通风空调 第一节 拆除工程 一、风管拆除 1、风管拆除 (δ=1.5mm以内、咬口)
- 751,751,752,3-3,圆形风管直径/方矩形风管周长(mm以内) 1250/4000,,0,0.22,0.83,79.2,34.06,43.0,11.09,14.0,0.0,80.25,125.4,,0.0,10m2,0.0,,0.0,,203010101,,,,,10,,0.0,,,拆除风管、管件、托吊卡件、调节阀门、保温层运至指定地点、清理拆除现场。,,1.0,0,0.0,,,,752,第三章 通风空调 第一节 拆除工程 一、风管拆除 1、风管拆除 (δ=1.5mm以内、咬口)
- 752,752,753,3-4,圆形风管直径/方矩形风管周长(mm以内) 1250/4000以上,,0,0.2,0.74,70.4,30.27,43.0,9.86,14.0,0.0,71.34,111.47,,0.0,10m2,0.0,,0.0,,203010101,,,,,10,,0.0,,,拆除风管、管件、托吊卡件、调节阀门、保温层运至指定地点、清理拆除现场。,,1.0,0,0.0,,,,753,第三章 通风空调 第一节 拆除工程 一、风管拆除 1、风管拆除 (δ=1.5mm以内、咬口)
- 753,753,754,3-5,圆形风管直径/方矩形风管周长(mm以内) 360/1200,,0,0.36,1.34,76.56,32.92,43.0,10.72,14.0,0.0,78.26,121.9,,0.0,10m2,0.0,,0.0,,203010102,,,,,10,,0.0,,,拆除风管、管件、托吊卡件、调节阀门、保温层运至指定地点、清理拆除现场。,,1.0,0,0.0,,,,754,第三章 通风空调 第一节 拆除工程 一、风管拆除 2、风管拆除(δ=3mm以内、焊接)
- 754,754,755,3-6,圆形风管直径/方矩形风管周长(mm以内) 800/2400,,0,0.33,1.25,71.28,30.65,43.0,9.98,14.0,0.0,72.86,113.49,,0.0,10m2,0.0,,0.0,,203010102,,,,,10,,0.0,,,拆除风管、管件、托吊卡件、调节阀门、保温层运至指定地点、清理拆除现场。,,1.0,0,0.0,,,,755,第三章 通风空调 第一节 拆除工程 一、风管拆除 2、风管拆除(δ=3mm以内、焊接)
- 755,755,756,3-7,圆形风管直径/方矩形风管周长(mm以内) 1250/4000,,0,0.3,1.16,66.0,28.38,43.0,9.24,14.0,0.0,67.46,105.08,,0.0,10m2,0.0,,0.0,,203010102,,,,,10,,0.0,,,拆除风管、管件、托吊卡件、调节阀门、保温层运至指定地点、清理拆除现场。,,1.0,0,0.0,,,,756,第三章 通风空调 第一节 拆除工程 一、风管拆除 2、风管拆除(δ=3mm以内、焊接)
- 756,756,757,3-8,圆形风管直径/方矩形风管周长(mm以内) 1250/4000以上,,0,0.27,1.02,58.08,24.97,43.0,8.13,14.0,0.0,59.37,92.47,,0.0,10m2,0.0,,0.0,,203010102,,,,,10,,0.0,,,拆除风管、管件、托吊卡件、调节阀门、保温层运至指定地点、清理拆除现场。,,1.0,0,0.0,,,,757,第三章 通风空调 第一节 拆除工程 一、风管拆除 2、风管拆除(δ=3mm以内、焊接)
- 757,757,758,3-9,复合型风管拆除 周长(mm以内) 1300,,0,0.2,0.4,8.8,3.78,43.0,1.23,14.0,0.0,9.4,14.41,,0.0,10m2,0.0,,0.0,,203010103,,,,,10,,0.0,,,拆除风管、管件、吊托卡件、运至指定地点,清理拆除现场。,,1.0,0,0.0,,,,758,第三章 通风空调 第一节 拆除工程 一、风管拆除 3、复合型风管拆除
- 758,758,759,3-10,复合型风管拆除 周长(mm以内) 2000,,0,0.2,0.4,7.92,3.41,43.0,1.11,14.0,0.0,8.52,13.04,,0.0,10m2,0.0,,0.0,,203010103,,,,,10,,0.0,,,拆除风管、管件、吊托卡件、运至指定地点,清理拆除现场。,,1.0,0,0.0,,,,759,第三章 通风空调 第一节 拆除工程 一、风管拆除 3、复合型风管拆除
- 759,759,760,3-11,复合型风管拆除 周长(mm以内) 3200,,0,0.2,0.4,7.92,3.41,43.0,1.11,14.0,0.0,8.52,13.04,,0.0,10m2,0.0,,0.0,,203010103,,,,,10,,0.0,,,拆除风管、管件、吊托卡件、运至指定地点,清理拆除现场。,,1.0,0,0.0,,,,760,第三章 通风空调 第一节 拆除工程 一、风管拆除 3、复合型风管拆除
- 760,760,761,3-12,复合型风管拆除 周长(mm以内) 4500,,0,0.2,0.4,7.48,3.22,43.0,1.05,14.0,0.0,8.08,12.35,,0.0,10m2,0.0,,0.0,,203010103,,,,,10,,0.0,,,拆除风管、管件、吊托卡件、运至指定地点,清理拆除现场。,,1.0,0,0.0,,,,761,第三章 通风空调 第一节 拆除工程 一、风管拆除 3、复合型风管拆除
- 761,761,762,3-13,复合型风管拆除 周长(mm以内) 6500,,0,0.2,0.4,7.04,3.03,43.0,0.99,14.0,0.0,7.64,11.66,,0.0,10m2,0.0,,0.0,,203010103,,,,,10,,0.0,,,拆除风管、管件、吊托卡件、运至指定地点,清理拆除现场。,,1.0,0,0.0,,,,762,第三章 通风空调 第一节 拆除工程 一、风管拆除 3、复合型风管拆除
- 762,762,763,3-14,玻璃钢风管拆除 大边长(mm以内) 200,,0,0.57,1.84,180.4,77.57,43.0,25.26,14.0,0.0,182.81,285.64,,0.0,10m2,0.0,,0.0,,203010104,,,,,10,,0.0,,,拆除风管、管件、吊托卡件、运至指定地点,清理拆除现场。,,1.0,0,0.0,,,,763,第三章 通风空调 第一节 拆除工程 一、风管拆除 4、玻璃钢风管拆除
- 763,763,764,3-15,玻璃钢风管拆除 大边长(mm以内) 630,,0,0.34,1.16,110.0,47.3,43.0,15.4,14.0,0.0,111.5,174.2,,0.0,10m2,0.0,,0.0,,203010104,,,,,10,,0.0,,,拆除风管、管件、吊托卡件、运至指定地点,清理拆除现场。,,1.0,0,0.0,,,,764,第三章 通风空调 第一节 拆除工程 一、风管拆除 4、玻璃钢风管拆除
- 764,764,765,3-16,玻璃钢风管拆除 大边长(mm以内) 1000,,0,0.36,1.21,114.4,49.19,43.0,16.02,14.0,0.0,115.97,181.18,,0.0,10m2,0.0,,0.0,,203010104,,,,,10,,0.0,,,拆除风管、管件、吊托卡件、运至指定地点,清理拆除现场。,,1.0,0,0.0,,,,765,第三章 通风空调 第一节 拆除工程 一、风管拆除 4、玻璃钢风管拆除
- 765,765,766,3-17,玻璃钢风管拆除 大边长(mm以内) 1000以上,,0,0.42,1.35,132.0,56.76,43.0,18.48,14.0,0.0,133.77,209.01,,0.0,10m2,0.0,,0.0,,203010104,,,,,10,,0.0,,,拆除风管、管件、吊托卡件、运至指定地点,清理拆除现场。,,1.0,0,0.0,,,,766,第三章 通风空调 第一节 拆除工程 一、风管拆除 4、玻璃钢风管拆除
- 766,766,767,3-18,静压箱拆除 大边长(mm以内) 450,,0,0.48,1.8,102.96,44.27,43.0,14.41,14.0,0.0,105.24,163.92,,0.0,10m2,0.0,,0.0,,203010200,,,,,10,,0.0,,,拆除静压箱本体、吊托支架等,运至指定地点,清理拆除现场。,,1.0,0,0.0,,,,767,第三章 通风空调 第一节 拆除工程 二、静压箱拆除
- 767,767,768,3-19,静压箱拆除 大边长(mm以内) 1000,,0,0.23,0.86,50.16,21.57,43.0,7.02,14.0,0.0,51.25,79.84,,0.0,10m2,0.0,,0.0,,203010200,,,,,10,,0.0,,,拆除静压箱本体、吊托支架等,运至指定地点,清理拆除现场。,,1.0,0,0.0,,,,768,第三章 通风空调 第一节 拆除工程 二、静压箱拆除
- 768,768,769,3-20,静压箱拆除 大边长(mm以内) 1250,,0,0.24,0.91,52.8,22.7,43.0,7.39,14.0,0.0,53.95,84.04,,0.0,10m2,0.0,,0.0,,203010200,,,,,10,,0.0,,,拆除静压箱本体、吊托支架等,运至指定地点,清理拆除现场。,,1.0,0,0.0,,,,769,第三章 通风空调 第一节 拆除工程 二、静压箱拆除
- 769,769,770,3-21,静压箱拆除 大边长(mm以内) 1250以上,,0,0.25,0.94,52.8,22.7,43.0,7.39,14.0,0.0,53.99,84.08,,0.0,10m2,0.0,,0.0,,203010200,,,,,10,,0.0,,,拆除静压箱本体、吊托支架等,运至指定地点,清理拆除现场。,,1.0,0,0.0,,,,770,第三章 通风空调 第一节 拆除工程 二、静压箱拆除
- 770,770,771,3-22,防火阀门拆除 圆形 直径(mm以内) 630,,0,0.55,2.08,19.8,8.51,43.0,2.77,14.0,0.0,22.43,33.71,,0.0,个,0.0,,0.0,,203010301,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,771,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 1、防火阀门拆除
- 771,771,772,3-23,防火阀门拆除 圆形 直径(mm以内) 1000,,0,0.86,3.23,30.8,13.24,43.0,4.31,14.0,0.0,34.89,52.44,,0.0,个,0.0,,0.0,,203010301,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,772,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 1、防火阀门拆除
- 772,772,773,3-24,防火阀门拆除 方、矩形 周长(mm以内) 2080,,0,0.54,2.03,19.36,8.32,43.0,2.71,14.0,0.0,21.93,32.96,,0.0,个,0.0,,0.0,,203010301,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,773,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 1、防火阀门拆除
- 773,773,774,3-25,防火阀门拆除 方、矩形 周长(mm以内) 3600,,0,0.68,2.54,24.2,10.41,43.0,3.39,14.0,0.0,27.42,41.22,,0.0,个,0.0,,0.0,,203010301,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,774,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 1、防火阀门拆除
- 774,774,775,3-26,防火阀门拆除 方、矩形 周长(mm以内) 5400,,0,0.89,3.33,31.68,13.62,43.0,4.44,14.0,0.0,35.9,53.96,,0.0,个,0.0,,0.0,,203010301,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,775,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 1、防火阀门拆除
- 775,775,776,3-27,防火阀门拆除 方、矩形 周长(mm以内) 6500,,0,1.13,4.25,40.48,17.41,43.0,5.67,14.0,0.0,45.86,68.94,,0.0,个,0.0,,0.0,,203010301,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,776,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 1、防火阀门拆除
- 776,776,777,3-28,对开式多叶调节阀拆除 周长(mm以内) 1200,,0,0.31,1.16,6.6,2.84,43.0,0.92,14.0,0.0,8.07,11.83,,0.0,个,0.0,,0.0,,203010302,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,777,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 2、对开式多叶调节阀拆除
- 777,777,778,3-29,对开式多叶调节阀拆除 周长(mm以内) 2400,,0,0.34,1.29,8.8,3.78,43.0,1.23,14.0,0.0,10.43,15.44,,0.0,个,0.0,,0.0,,203010302,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,778,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 2、对开式多叶调节阀拆除
- 778,778,779,3-30,对开式多叶调节阀拆除 周长(mm以内) 3600,,0,0.38,1.43,10.12,4.35,43.0,1.42,14.0,0.0,11.93,17.7,,0.0,个,0.0,,0.0,,203010302,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,779,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 2、对开式多叶调节阀拆除
- 779,779,780,3-31,对开式多叶调节阀拆除 周长(mm以内) 5000,,0,0.62,2.31,11.88,5.11,43.0,1.66,14.0,0.0,14.81,21.58,,0.0,个,0.0,,0.0,,203010302,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,780,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 2、对开式多叶调节阀拆除
- 780,780,781,3-32,对开式多叶调节阀拆除 周长(mm以内) 6500,,0,0.74,2.77,13.2,5.68,43.0,1.85,14.0,0.0,16.71,24.24,,0.0,个,0.0,,0.0,,203010302,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,781,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 2、对开式多叶调节阀拆除
- 781,781,782,3-33,对开式多叶调节阀拆除 周长(mm以内) 7200,,0,0.8,3.0,14.52,6.24,43.0,2.03,14.0,0.0,18.32,26.59,,0.0,个,0.0,,0.0,,203010302,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,782,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 2、对开式多叶调节阀拆除
- 782,782,783,3-34,其他风阀拆除 矩形 周长(mm以内) 1200,,0,0.21,0.79,7.48,3.22,43.0,1.05,14.0,0.0,8.48,12.75,,0.0,个,0.0,,0.0,,203010303,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,783,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 3、其他风阀拆除
- 783,783,784,3-35,其他风阀拆除 矩形 周长(mm以内) 2400,,0,0.46,1.71,10.12,4.35,43.0,1.42,14.0,0.0,12.29,18.06,,0.0,个,0.0,,0.0,,203010303,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,784,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 3、其他风阀拆除
- 784,784,785,3-36,其他风阀拆除 矩形 周长(mm以内) 4000,,0,0.73,2.73,15.4,6.62,43.0,2.16,14.0,0.0,18.86,27.64,,0.0,个,0.0,,0.0,,203010303,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,785,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 3、其他风阀拆除
- 785,785,786,3-37,其他风阀拆除 圆形 直径(mm以内) 320,,0,0.18,0.69,6.6,2.84,43.0,0.92,14.0,0.0,7.47,11.23,,0.0,个,0.0,,0.0,,203010303,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,786,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 3、其他风阀拆除
- 786,786,787,3-38,其他风阀拆除 圆形 直径(mm以内) 630,,0,0.37,1.39,8.8,3.78,43.0,1.23,14.0,0.0,10.56,15.57,,0.0,个,0.0,,0.0,,203010303,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,787,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 3、其他风阀拆除
- 787,787,788,3-39,其他风阀拆除 圆形 直径(mm以内) 1000,,0,0.49,1.85,10.56,4.54,43.0,1.48,14.0,0.0,12.9,18.92,,0.0,个,0.0,,0.0,,203010303,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,788,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 3、其他风阀拆除
- 788,788,789,3-40,其他风阀拆除 圆形 直径(mm以内) 1000以上,,0,0.55,2.08,12.32,5.3,43.0,1.72,14.0,0.0,14.95,21.97,,0.0,个,0.0,,0.0,,203010303,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,789,第三章 通风空调 第一节 拆除工程 三、调节阀拆除 3、其他风阀拆除
- 789,789,790,3-41,风口拆除 圆形 周长(mm以内) 900,,0,0.36,1.29,3.52,1.51,43.0,0.49,14.0,0.0,5.17,7.17,,0.0,个,0.0,,0.0,,203010400,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,790,第三章 通风空调 第一节 拆除工程 四、风口拆除
- 790,790,791,3-42,风口拆除 圆形 周长(mm以内) 1280,,0,0.36,1.29,4.84,2.08,43.0,0.68,14.0,0.0,6.49,9.25,,0.0,个,0.0,,0.0,,203010400,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,791,第三章 通风空调 第一节 拆除工程 四、风口拆除
- 791,791,792,3-43,风口拆除 圆形 周长(mm以内) 1800,,0,0.36,1.29,9.24,3.97,43.0,1.29,14.0,0.0,10.89,16.15,,0.0,个,0.0,,0.0,,203010400,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,792,第三章 通风空调 第一节 拆除工程 四、风口拆除
- 792,792,793,3-44,风口拆除 圆形 周长(mm以内) 2500,,0,0.36,1.66,13.2,5.68,43.0,1.85,14.0,0.0,15.22,22.75,,0.0,个,0.0,,0.0,,203010400,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,793,第三章 通风空调 第一节 拆除工程 四、风口拆除
- 793,793,794,3-45,风口拆除 圆形 周长(mm以内) 3300,,0,0.36,1.66,17.6,7.57,43.0,2.46,14.0,0.0,19.62,29.65,,0.0,个,0.0,,0.0,,203010400,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,794,第三章 通风空调 第一节 拆除工程 四、风口拆除
- 794,794,795,3-46,风口拆除 方形 周长(mm以内) 2000,,0,0.34,1.29,12.32,5.3,43.0,1.72,14.0,0.0,13.95,20.97,,0.0,个,0.0,,0.0,,203010400,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,795,第三章 通风空调 第一节 拆除工程 四、风口拆除
- 795,795,796,3-47,风口拆除 方形 周长(mm以内) 3000,,0,0.44,1.66,15.84,6.81,43.0,2.22,14.0,0.0,17.94,26.97,,0.0,个,0.0,,0.0,,203010400,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,796,第三章 通风空调 第一节 拆除工程 四、风口拆除
- 796,796,797,3-48,风口拆除 方形 周长(mm以内) 4000,,0,0.52,1.94,18.48,7.95,43.0,2.59,14.0,0.0,20.94,31.48,,0.0,个,0.0,,0.0,,203010400,,,,,1,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,797,第三章 通风空调 第一节 拆除工程 四、风口拆除
- 797,797,798,3-49,片式 消声器,,0,4.34,1.27,12.32,5.3,43.0,1.72,14.0,0.0,17.93,24.95,,0.0,100kg,0.0,,0.0,,203010500,,,,,100,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,798,第三章 通风空调 第一节 拆除工程 五、消声器拆除
- 798,798,799,3-50,矿棉管式 消声器,,0,1.24,4.67,19.8,8.51,43.0,2.77,14.0,0.0,25.71,36.99,,0.0,100kg,0.0,,0.0,,203010500,,,,,100,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,799,第三章 通风空调 第一节 拆除工程 五、消声器拆除
- 799,799,800,3-51,聚酯泡沫管式 消声器,,0,1.24,4.67,13.64,5.87,43.0,1.91,14.0,0.0,19.55,27.33,,0.0,100kg,0.0,,0.0,,203010500,,,,,100,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,800,第三章 通风空调 第一节 拆除工程 五、消声器拆除
- 800,800,801,3-52,卡普隆纤维管式 消声器,,0,1.24,4.67,19.8,8.51,43.0,2.77,14.0,0.0,25.71,36.99,,0.0,100kg,0.0,,0.0,,203010500,,,,,100,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,801,第三章 通风空调 第一节 拆除工程 五、消声器拆除
- 801,801,802,3-53,弧开声流式 消声器,,0,1.24,4.67,19.8,8.51,43.0,2.77,14.0,0.0,25.71,36.99,,0.0,100kg,0.0,,0.0,,203010500,,,,,100,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,802,第三章 通风空调 第一节 拆除工程 五、消声器拆除
- 802,802,803,3-54,阻抗复合式 消声器,,0,1.6,6.01,28.16,12.11,43.0,3.94,14.0,0.0,35.77,51.82,,0.0,100kg,0.0,,0.0,,203010500,,,,,100,,0.0,,,拆除本体及附件,运至指定地点。,,1.0,0,0.0,,,,803,第三章 通风空调 第一节 拆除工程 五、消声器拆除
- 803,803,804,3-55,圆伞形 风帽,,0,1.41,5.41,92.4,39.73,43.0,12.94,14.0,0.0,99.22,151.89,,0.0,100kg,0.0,,0.0,,203010600,,,,,100,,0.0,,,拆除风帽本体及筝绳。运至指定地点。,,1.0,0,0.0,,,,804,第三章 通风空调 第一节 拆除工程 六、风帽拆除
- 804,804,805,3-56,锥形 风帽,,0,1.41,5.41,84.04,36.14,43.0,11.77,14.0,0.0,90.86,138.77,,0.0,100kg,0.0,,0.0,,203010600,,,,,100,,0.0,,,拆除风帽本体及筝绳。运至指定地点。,,1.0,0,0.0,,,,805,第三章 通风空调 第一节 拆除工程 六、风帽拆除
- 805,805,806,3-57,筒形 风帽,,0,1.41,5.41,50.6,21.76,43.0,7.08,14.0,0.0,57.42,86.26,,0.0,100kg,0.0,,0.0,,203010600,,,,,100,,0.0,,,拆除风帽本体及筝绳。运至指定地点。,,1.0,0,0.0,,,,806,第三章 通风空调 第一节 拆除工程 六、风帽拆除
- 806,806,807,3-58,中、小型零件焊接台排气罩T401-3,,0,1.09,3.28,53.24,22.89,43.0,7.45,14.0,0.0,57.61,87.95,,0.0,100kg,0.0,,0.0,,203010700,,,,,100,,0.0,,,拆除排气罩本体及附件,运至指定地点。,,1.0,0,0.0,,,,807,第三章 通风空调 第一节 拆除工程 七、排气罩拆除
- 807,807,808,3-59,整体、分组式槽边侧吸罩T403-1,,0,1.09,3.28,53.68,23.08,43.0,7.52,14.0,0.0,58.05,88.65,,0.0,100kg,0.0,,0.0,,203010700,,,,,100,,0.0,,,拆除排气罩本体及附件,运至指定地点。,,1.0,0,0.0,,,,808,第三章 通风空调 第一节 拆除工程 七、排气罩拆除
- 808,808,809,3-60,吹、吸式槽边通风罩94T459,,0,1.09,3.28,54.12,23.27,43.0,7.58,14.0,0.0,58.49,89.34,,0.0,100kg,0.0,,0.0,,203010700,,,,,100,,0.0,,,拆除排气罩本体及附件,运至指定地点。,,1.0,0,0.0,,,,809,第三章 通风空调 第一节 拆除工程 七、排气罩拆除
- 809,809,810,3-61,升降式排气罩T412,,0,1.09,3.28,30.36,13.05,43.0,4.25,14.0,0.0,34.73,52.03,,0.0,100kg,0.0,,0.0,,203010700,,,,,100,,0.0,,,拆除排气罩本体及附件,运至指定地点。,,1.0,0,0.0,,,,810,第三章 通风空调 第一节 拆除工程 七、排气罩拆除
- 810,810,811,3-62,手锻炉排气罩T413,,0,1.09,3.28,23.76,10.22,43.0,3.33,14.0,0.0,28.13,41.68,,0.0,100kg,0.0,,0.0,,203010700,,,,,100,,0.0,,,拆除排气罩本体及附件,运至指定地点。,,1.0,0,0.0,,,,811,第三章 通风空调 第一节 拆除工程 七、排气罩拆除
- 811,811,812,3-63,离心式风机型号 2.8#~3.6#,,0,0.99,3.7,16.72,7.19,43.0,2.34,14.0,0.0,21.41,30.94,,0.0,台,0.0,,0.0,,203020101,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,812,第三章 通风空调 第二节 通风空调设备拆除 一、通风机拆除 1、离心式通风机拆除
- 812,812,813,3-64,离心式风机型号 4#~5#,,0,1.72,6.47,61.6,26.49,43.0,8.62,14.0,0.0,69.79,104.9,,0.0,台,0.0,,0.0,,203020101,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,813,第三章 通风空调 第二节 通风空调设备拆除 一、通风机拆除 1、离心式通风机拆除
- 813,813,814,3-65,离心式风机型号 6#~8#,,0,3.7,13.86,132.0,56.76,43.0,18.48,14.0,0.0,149.56,224.8,,0.0,台,0.0,,0.0,,203020101,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,814,第三章 通风空调 第二节 通风空调设备拆除 一、通风机拆除 1、离心式通风机拆除
- 814,814,815,3-66,离心式风机型号 10#~12#,,0,6.16,23.1,220.0,94.6,43.0,30.8,14.0,0.0,249.26,374.66,,0.0,台,0.0,,0.0,,203020101,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,815,第三章 通风空调 第二节 通风空调设备拆除 一、通风机拆除 1、离心式通风机拆除
- 815,815,816,3-67,离心式风机型号 16#~20#,,0,17.25,64.68,616.0,264.88,43.0,86.24,14.0,0.0,697.93,1049.05,,0.0,台,0.0,,0.0,,203020101,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,816,第三章 通风空调 第二节 通风空调设备拆除 一、通风机拆除 1、离心式通风机拆除
- 816,816,817,3-68,金属托架上 2 1/2~4#,,0,0.54,2.03,19.36,8.32,43.0,2.71,14.0,0.0,21.93,32.96,,0.0,台,0.0,,0.0,,203020102,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,817,第三章 通风空调 第二节 通风空调设备拆除 一、通风机拆除 2、轴流式通风机拆除
- 817,817,818,3-69,金属托架上 5#~7#,,0,0.79,2.96,28.16,12.11,43.0,3.94,14.0,0.0,31.91,47.96,,0.0,台,0.0,,0.0,,203020102,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,818,第三章 通风空调 第二节 通风空调设备拆除 一、通风机拆除 2、轴流式通风机拆除
- 818,818,819,3-70,墙内 2 1/2~4#,,0,1.47,5.5,52.36,22.51,43.0,7.33,14.0,0.0,59.33,89.17,,0.0,台,0.0,,0.0,,203020102,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,819,第三章 通风空调 第二节 通风空调设备拆除 一、通风机拆除 2、轴流式通风机拆除
- 819,819,820,3-71,墙内 5#~7#,,0,1.92,7.21,68.64,29.52,43.0,9.61,14.0,0.0,77.77,116.9,,0.0,台,0.0,,0.0,,203020102,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,820,第三章 通风空调 第二节 通风空调设备拆除 一、通风机拆除 2、轴流式通风机拆除
- 820,820,821,3-72,窗式空调器拆除,,0,0.43,1.62,15.4,6.62,43.0,2.16,14.0,0.0,17.45,26.23,,0.0,台,0.0,,0.0,,203020201,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,821,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 1、窗式空调器、风机盘管拆除
- 821,821,822,3-73,风机盘管拆除 吊顶式,,0,0.43,1.62,15.4,6.62,43.0,2.16,14.0,0.0,17.45,26.23,,0.0,台,0.0,,0.0,,203020201,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,822,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 1、窗式空调器、风机盘管拆除
- 822,822,823,3-74,风机盘管拆除 落地式,,0,0.55,2.08,19.8,8.51,43.0,2.77,14.0,0.0,22.43,33.71,,0.0,台,0.0,,0.0,,203020201,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,823,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 1、窗式空调器、风机盘管拆除
- 823,823,824,3-75,空气幕拆除,,0,1.61,6.05,57.64,24.79,43.0,8.07,14.0,0.0,65.3,98.16,,0.0,台,0.0,,0.0,,203020201,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,824,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 1、窗式空调器、风机盘管拆除
- 824,824,825,3-76,变风量末端装置拆除,,0,0.55,2.08,19.8,8.51,43.0,2.77,14.0,0.0,22.43,33.71,,0.0,台,0.0,,0.0,,203020201,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,825,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 1、窗式空调器、风机盘管拆除
- 825,825,826,3-77,多联体空调器室外机拆除 制冷量(KW以内) 20,,0,1.4,5.24,50.16,21.57,43.0,7.02,14.0,0.0,56.8,85.39,,0.0,台,0.0,,0.0,,203020202,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,826,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 2、多联体空调器室外机拆除
- 826,826,827,3-78,多联体空调器室外机拆除 制冷量(KW以内) 30,,0,1.81,6.79,64.68,27.81,43.0,9.06,14.0,0.0,73.28,110.15,,0.0,台,0.0,,0.0,,203020202,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,827,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 2、多联体空调器室外机拆除
- 827,827,828,3-79,整体立柜式空调机组拆除 制冷量(KW以内) 35,,0,11.12,41.69,396.88,170.66,43.0,55.56,14.0,0.0,449.69,675.91,,0.0,台,0.0,,0.0,,203020203,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,828,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 3、整体立柜式空调机组拆除
- 828,828,829,3-80,整体立柜式空调机组拆除 制冷量(KW以内) 120,,0,16.91,63.41,604.12,259.77,43.0,84.58,14.0,0.0,684.44,1028.79,,0.0,台,0.0,,0.0,,203020203,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,829,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 3、整体立柜式空调机组拆除
- 829,829,830,3-81,分体式空调器拆除 制冷量(KW以内) 10,,0,1.08,4.04,38.72,16.65,43.0,5.42,14.0,0.0,43.84,65.91,,0.0,台,0.0,,0.0,,203020204,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,830,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 4、分体式空调器拆除
- 830,830,831,3-82,分体式空调器拆除 制冷量(KW以内) 40,,0,5.74,21.54,205.04,88.17,43.0,28.71,14.0,0.0,232.32,349.2,,0.0,台,0.0,,0.0,,203020204,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,831,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 4、分体式空调器拆除
- 831,831,832,3-83,组合式空调机组拆除 风量(m3/h) 4000,,0,3.61,13.54,128.92,55.44,43.0,18.05,14.0,0.0,146.07,219.56,,0.0,台,0.0,,0.0,,203020205,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,832,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 5、组合式空调机组拆除
- 832,832,833,3-84,组合式空调机组拆除 风量(m3/h) 20000,,0,10.32,38.72,368.72,158.55,43.0,51.62,14.0,0.0,417.76,627.93,,0.0,台,0.0,,0.0,,203020205,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,833,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 5、组合式空调机组拆除
- 833,833,834,3-85,组合式空调机组拆除 风量(m3/h) 60000,,0,30.57,114.62,1091.64,469.41,43.0,152.83,14.0,0.0,1236.83,1859.07,,0.0,台,0.0,,0.0,,203020205,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,834,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 5、组合式空调机组拆除
- 834,834,835,3-86,组合式空调机组拆除 风量(m3/h) 100000,,0,79.99,299.98,2856.92,1228.48,43.0,399.97,14.0,0.0,3236.89,4865.34,,0.0,台,0.0,,0.0,,203020205,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,835,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 5、组合式空调机组拆除
- 835,835,836,3-87,离心式冷水机组拆除 制冷量(KW以内) 600,,0,51.52,193.21,1840.08,791.23,43.0,257.61,14.0,0.0,2084.81,3133.65,,0.0,台,0.0,,0.0,,203020206,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,836,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 6、离心式冷水机组拆除
- 836,836,837,3-88,离心式冷水机组拆除 制冷量(KW以内) 1400,,0,74.15,278.08,2648.36,1138.79,43.0,370.77,14.0,0.0,3000.59,4510.15,,0.0,台,0.0,,0.0,,203020206,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,837,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 6、离心式冷水机组拆除
- 837,837,838,3-89,离心式冷水机组拆除 制冷量(KW以内) 2300,,0,99.21,372.05,3543.32,1523.63,43.0,496.06,14.0,0.0,4014.58,6034.27,,0.0,台,0.0,,0.0,,203020206,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,838,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 6、离心式冷水机组拆除
- 838,838,839,3-90,活塞式冷水机组拆除 制冷量(KW以内) 60,,0,7.91,29.66,282.48,121.47,43.0,39.55,14.0,0.0,320.05,481.07,,0.0,台,0.0,,0.0,,203020207,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,839,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 7、活塞式冷水机组拆除
- 839,839,840,3-91,活塞式冷水机组拆除 制冷量(KW以内) 300,,0,19.05,71.43,680.24,292.5,43.0,95.23,14.0,0.0,770.72,1158.45,,0.0,台,0.0,,0.0,,203020207,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,840,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 7、活塞式冷水机组拆除
- 840,840,841,3-92,活塞式冷水机组拆除 制冷量(KW以内) 470,,0,28.8,108.02,1028.72,442.35,43.0,144.02,14.0,0.0,1165.54,1751.91,,0.0,台,0.0,,0.0,,203020207,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,841,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 7、活塞式冷水机组拆除
- 841,841,842,3-93,活塞式冷水机组拆除 制冷量(KW以内) 700,,0,43.8,164.24,1564.2,672.61,43.0,218.99,14.0,0.0,1772.24,2663.84,,0.0,台,0.0,,0.0,,203020207,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,842,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 7、活塞式冷水机组拆除
- 842,842,843,3-94,溴化锂吸收式冷水机组拆除 制冷量(KW以内) 600,,0,54.38,203.93,1942.16,835.13,43.0,271.9,14.0,0.0,2200.47,3307.5,,0.0,台,0.0,,0.0,,203020208,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,843,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 8、溴化锂吸收式冷水机组拆除
- 843,843,844,3-95,溴化锂吸收式冷水机组拆除 制冷量(KW以内) 1800,,0,77.04,288.89,2751.32,1183.07,43.0,385.18,14.0,0.0,3117.25,4685.5,,0.0,台,0.0,,0.0,,203020208,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,844,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 8、溴化锂吸收式冷水机组拆除
- 844,844,845,3-96,溴化锂吸收式冷水机组拆除 制冷量(KW以内) 3000,,0,134.3,503.63,4796.44,2062.47,43.0,671.5,14.0,0.0,5434.37,8168.34,,0.0,台,0.0,,0.0,,203020208,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,845,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 8、溴化锂吸收式冷水机组拆除
- 845,845,846,3-97,溴化锂吸收式冷水机组拆除 制冷量(KW以内) 4000,,0,171.88,644.54,6138.44,2639.53,43.0,859.38,14.0,0.0,6954.86,10453.77,,0.0,台,0.0,,0.0,,203020208,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,846,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 8、溴化锂吸收式冷水机组拆除
- 846,846,847,3-98,螺杆式冷水机组拆除 制冷量(KW以内) 350,,0,23.24,87.16,830.28,357.02,43.0,116.24,14.0,0.0,940.68,1413.94,,0.0,台,0.0,,0.0,,203020209,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,847,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 9、螺杆式冷水机组拆除
- 847,847,848,3-99,螺杆式冷水机组拆除 制冷量(KW以内) 1300,,0,84.4,316.52,3014.44,1296.21,43.0,422.02,14.0,0.0,3415.36,5133.59,,0.0,台,0.0,,0.0,,203020209,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,848,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 9、螺杆式冷水机组拆除
- 848,848,849,3-100,模块式冷水机组拆除 制冷量(KW以内) 120,,0,8.6,32.25,307.12,132.06,43.0,43.0,14.0,0.0,347.97,523.03,,0.0,台,0.0,,0.0,,203020210,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,849,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 10、模块式冷水机组拆除
- 849,849,850,3-101,模块式冷水机组拆除 制冷量(KW以内) 240,,0,20.14,75.54,719.4,309.34,43.0,100.72,14.0,0.0,815.08,1225.14,,0.0,台,0.0,,0.0,,203020210,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,850,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 10、模块式冷水机组拆除
- 850,850,851,3-102,模块式冷水机组拆除 制冷量(KW以内) 360,,0,31.28,117.3,1117.16,480.38,43.0,156.4,14.0,0.0,1265.74,1902.52,,0.0,台,0.0,,0.0,,203020210,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,851,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 10、模块式冷水机组拆除
- 851,851,852,3-103,玻璃钢冷却塔拆除 处理水量(m3/h以内) 50,,0,8.33,31.23,297.44,127.9,43.0,41.64,14.0,0.0,337.0,506.54,,0.0,台,0.0,,0.0,,203020211,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,852,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 11、玻璃钢冷却塔拆除
- 852,852,853,3-104,玻璃钢冷却塔拆除 处理水量(m3/h以内) 150,,0,10.51,39.42,375.32,161.39,43.0,52.54,14.0,0.0,425.25,639.18,,0.0,台,0.0,,0.0,,203020211,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,853,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 11、玻璃钢冷却塔拆除
- 853,853,854,3-105,玻璃钢冷却塔拆除 处理水量(m3/h以内) 500,,0,21.74,81.54,776.6,333.94,43.0,108.72,14.0,0.0,879.88,1322.54,,0.0,台,0.0,,0.0,,203020211,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,854,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 11、玻璃钢冷却塔拆除
- 854,854,855,3-106,玻璃钢冷却塔拆除 处理水量(m3/h以内) 700,,0,25.32,94.94,904.2,388.81,43.0,126.59,14.0,0.0,1024.46,1539.86,,0.0,台,0.0,,0.0,,203020211,,,,,1,,0.0,,,机器本体及附件、支托架拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,855,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 11、玻璃钢冷却塔拆除
- 855,855,856,3-107,LWP滤尘器,,0,1.87,6.08,1.32,0.57,43.0,0.18,14.0,0.0,9.27,10.02,,0.0,台,0.0,,0.0,,203020212,,,,,1,,0.0,,,机器本体及吊支架的拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,856,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 12、洁净空调设备拆除
- 856,856,857,3-108,高中效过滤器,,0,4.23,13.74,15.4,6.62,43.0,2.16,14.0,0.0,33.37,42.15,,0.0,台,0.0,,0.0,,203020212,,,,,1,,0.0,,,机器本体及吊支架的拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,857,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 12、洁净空调设备拆除
- 857,857,858,3-109,风淋室,,0,17.5,56.99,146.96,63.19,43.0,20.57,14.0,0.0,221.45,305.21,,0.0,台,0.0,,0.0,,203020212,,,,,1,,0.0,,,机器本体及吊支架的拆除,运至指定地点,清理现场。,,1.0,0,0.0,,,,858,第三章 通风空调 第二节 通风空调设备拆除 二、窗式空调器、风机盘管拆除 12、洁净空调设备拆除
- 858,858,859,SB3-110-1,空调充氟 1.5P以下,,0,89.0,5.0,66.66,,,,,,160.66,201.99,,,台,,,,,204010100,,,000010,,1,,,,,抽真空、充氟、测压、调试等全部工作内容。,,,0,,,,,859,省补充定额 省补充定额2020 空调充氟
- 859,859,860,SB3-110-2,空调充氟 2P-3P,,0,178.5,5.0,72.72,,,,,,256.22,301.31,,,台,,,,,204010100,,,000010,,1,,,,,抽真空、充氟、测压、调试等全部工作内容。,,,0,,,,,860,省补充定额 省补充定额2020 空调充氟
- 860,860,861,SB3-110-3,空调充氟 5P,,0,249.5,8.5,103.02,,,,,,361.02,424.89,,,台,,,,,204010100,,,000010,,1,,,,,抽真空、充氟、测压、调试等全部工作内容。,,,0,,,,,861,省补充定额 省补充定额2020 空调充氟
- 861,861,862,SB3-111,安装空调外机支架,,0,98.26,2.34,22.22,,,,,,122.82,136.6,,,台,,,,,204010200,,,,,1,,,,,放线、安装等全部工作内容。,,,0,,,,,862,省补充定额 省补充定额2020 安装空调外机支架
- 862,862,863,SB3-112,空调管序化,,0,120.59,2.92,66.66,,,,,,190.17,231.5,,,台,,,,,204010300,,,000011,,1,,,,,测量、放线、定位、切割、安装、调直。,,,0,,,,,863,省补充定额 省补充定额2020 空调管序化
|